| 1 | Safly Cartage of Centralised Material from Centeral Store to 33/11 KV Sub Station including loading and unloading to both ends in all respect(Distens 40-60KM) |
| 2 | PCC Pole 8.5/9 mtr |
| 3 | PCC Pole 11 mtr |
| 4 | Battery Charger |
| 5 | Battery set (12 Nos. 2 Volts 200 AH) |
| 6 | 1x240/1x400 Sq mm Lead |
| 7 | 33 KV Bus/Line Isoletor 800 Amp. |
| 8 | 33 KV LA |
| 9 | 33KV PT,33 KV CT, 33KV CT/PT Combind Unit & 11 KV Fuse Set |
| 10 | Conducter Wire |
| 11 | ABC(3x95+1x70+1x16)/ (3x50+1x35+1x16) |
| 12 | Line Item |
| 13 | 11 KV (O/G, I/C VCB) and Control Panel |
| 14 | Prepared Structure for CT/PT/LA Units ( All Decentralize Material Will Be Provided by Contrector) |
| 15 | Re asambeled old/Damaged Battery Set and Battry |
| 16 | Placed New Battery Charger and Battery Set |
| 17 | According RESPO Norms for Safty of 250KVA T/F Instalation of Tell Less Unit with Structure In LT Side of T/F.(All required Decentralized material will be Provided by contractor for Tell Less Unit) |
| 18 | Digging a pit and Placed PCC Pole in it with Instalation all Line Items, Properly Grouting of Pole and energized line.(Decentralized Item As Nut Bolt, Clamp, F Brackets, Stone pad and Material for grouting will be provide by Contractor) |
| 19 | Digging a pit and Placed 11 mtr PCC Pole in it with Instalation all Line Items, Properly Grouting of Pole and energized line.(Decentralized Item As Nut Bolt, Clamp, F Brackets, Stone pad and Material for grouting will be provide by Contractor) |
| 20 | Digging a pit and Placed PCC Pole in it for Duble pole with Instalation all Line Items, Properly Grouting of Pole and energized Dp.(Decentralized Item As Nut Bolt, Clamp,angel chanal, Stone pad and Material for grouting will be provide by Contractor) |
| 21 | Dismentling of old 11KV & 33 KV VCB/Controle Panal from the control room/Switch Yard including opening of all H.T. cable/ bus-bar form VCB and carriage VCB out Side Control Room/Switch Yard |
| 22 | Shifting of New 11KV VCB/Control Panal from out side to inside the control room with the help of heavy duty crene and its instalation with grouting with anchor bolts. |
| 23 | Providing and Fixing 4x25/2x25 mm2 Control Cable in Double Circt Control Panel |
| 24 | Dismantling Dp Charges |
| 25 | Dismantling STP/PCC Pole Charges |
| 26 | Instalation of LT Distribution Box (Decentralized Item As Nut Bolt, Piercing Connector, Connecting Lead 1x16 mm will be provide by Contractor) |
| 27 | Open Jar Jar Rabit/ Weasal/ABC from Pole, Lay down and collect safly |
| 28 | Work of Spread ABC, mounting and tying the wire on the pole with installation of all necessary line Item properly as RESPO Norms. (Decentralized Item As Nut Bolt, ALL Type Clamp, J huk, Angel will be provide by Contractor) |
| 29 | Work of Spread Wiseal, mounting and tying the wire on the pole with installation of all necessary line Item properly as RESPO Norms (Decentralized Item As Nut Bolt, Clamp will be provide by Contractor) |
| 30 | Weasal |
| 31 | Rabit |
| 32 | Work for Earthing of Pole With MS Earthing Road |
| 33 | Work for Instalation of Stay Set |
| 34 | Work for Concerting of Stay (All Item As Cement, Sand etc for Concreting will be provided by Contractor) |
| 35 | Instalation of Bus/Line Isoleter 800 Amp 33 KV ( All Decentralize Material Will Be Provided by Contrector) |
| 36 | Placement of 33 KV LA in All Respect |
| 37 | Providing and Fixing of 33 KV Relay |
| 38 | Providing and Fixing Sutabile WTI on Power Transformer acording RESHPO Norms |
| 39 | Providing and Fixing Sutabile OTI on Power Transformer acording RESHPO Norms |
| 40 | Work for Replplacement/Instalation of 33KV PT,33 KV CT, 33KV CT/PT Combind Unit & 11 KV Fuse Set in All Respect |
| 41 | Chemical Earthing work as per requirment of Site & RESPO Norms Including all of accessories (All required Decentralized material will be Provided by contractor for Earthing) |
| 42 | Construction/Repairing of Plinth in all respect According RESPO Norms of size 2x2x1.5 m (All required Decentralized material will be Provided by contractor for Construction of Plinth) |
| 43 | According RESPO Norms Wire Mesh Fencing size of 2x2x1.5 for Distributan T/F (All required Decentralized material will be Provided by contractor for Fancing) |
| 44 | Work for Safly open Nut Bolt Of 33 KV Braker from Structure, and Placed 33 KV Braker on Safe Place |
| 45 | Work for Dismental of Damaged Structure of 33KV Braker |
| 46 | Work for Prepare Structure for 33KV Braker ( Grouting of Pole and All Decentralize Material Will Be Provided by Contrector,) |
| 47 | Work for Place of 33 KV Braker on New Structure With RESHPO Norms |
| 48 | Received Back Old/Damaged Material from Site to Store (Including Loading, Unloading, Cartage in all respect) |
| 49 | VCB/Control Penal |
| 50 | 33 KV CT/PT/TPMO Scrap |
| 51 | Bus/Line Isoleter |
| 52 | Damaged Battery Charger |
| 53 | Damaged Battery Set 12 Nos 2 Volts 200AH |
| 54 | STP Pole |
| 55 | Conducter Wire Please Enable Macros to View BoQ information |