|
| 1 | Slips Clearence . |
| 2 | In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 3 | In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m |
| 4 | In soils; mixed with Decomposed Rocks; by blasting or any other means |
| 5 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(Not exceeding 1.5m in width) and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge ,disposed earth is to be leveled and neatly dressed in (All kind of soil) |
| 6 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not xceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil |
| 7 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 10 | Labourers engaged for opening of chocked HP culverts /RCC culverts and clearing of bushes. |
| 11 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non- pressure NP-3 class (Medium duty) R.C.C. pipes |
| 12 | 41000 mm dia. R.C.C. pipe (laying by manual/mechanical means) |
| 13 | 900 mm dia. R.C.C. pipe |
| 14 | 600 mm dia. R.C.C. pipe |
| 15 | 450 mm dia. R.C.C. pipe |
| 16 | Hand-packing stones in wire-crates including the cost of stones & including the cost of crates,( all Complete Job) NSI |
| 17 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 18 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 19 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
| 20 | Beyond 30 cm girth upto and including 60 cm girth. |
| 21 | Beyond 60 cm girth upto and including 120 cm girth. |
| 22 | Beyond 120 cm girth upto and including 240 cm girth. |
| 23 | Above 240 cm girth |
| 24 | Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete Foundations, footings, bases of columns |
| 25 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. |
| 26 | Snow Clearance by Mechanical Means using Snow Plough 4WD 60 BHP (Trucks/JCB) |
| 27 | Snow Clearance by Mechanical Means using Machines as specified or equivalent Snow Plough 180 HP (Ashoka Leyland Stallion- 2009 |
| 28 | Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete. |
| 29 | Sand for an average distance of 150 kms by M.T |
| 30 | Stone aggregate below 40 mm nominal size for an average distance 35 kms by M.T |
| 31 | Stone for an average distance 10 km by M.T |
| 32 | Disposal of Mulba for an an average distance of 1 Km by M.T |
| 33 | Good earth for an average distance of 1 Km by M.T |
| 34 | Providing and laying of any other item other than the items Advertised above as per the site requirements and on the instructions of the Engineer-in-charge to be paid on the allotted rates Please Enable Macros to View BoQ information |