| 1 | Providing and replacing of defective parts of three phase control panel of capacity 30 HP to 40 HP electric submersibles pump set, complete as per direction of Engineer-in-Charge. 70 amp 3 pole power contactor L&T or BCH make. |
| 2 | Providing and replacing of defective parts of three phase control panel of capacity upto 20HP electric submersibles pump set, complete as per direction of Engineer-in-Charge. 40 amp 3 pole power contactor L&T or BCH make. |
| 3 | Providing and replacing of defective parts of three phase control panel of capacity 10HP to 12 HP electric submersibles pump set, complete as per direction of Engineer-in-Charge. 25 amp 3 pole power contactor L&T or BCH make. |
| 4 | Providing and replacing of defective parts of three phase control panel of capacity 2.5 HP to 40 HP electric submersibles pump set, complete as per direction of Engineer-in-Charge. 5 A 400 V AC Single Phasing Preventer |
| 5 | Providing and replacing of defective parts of three phase control panel of capacity 20HP to 40 HP electric submersibles pump set, complete as per direction of Engineer-in-Charge. Relay 20-32 amp L&T or BCH make. |
| 6 | Providing and replacing of defective parts of three phase control panel of capacity 2.5 HP to 10 HP electric submersibles pump set, complete as per direction of Engineer-in-Charge. Relay 9-14 amp L&T or BCH make. |
| 7 | Rewinding/ repairinig/ servicing and over hauling of drainage de-watering submersible pump set 2.5 to 3 HP three Phase AC supply including replacement of mechanical seal, ball bearing, O ring set, Oil, nut bolt packing etc complete including credit for dismantled copper wire complete. |
| 8 | Rewinding/ repairinig/ servicing and over hauling of drainage de-watering submersible pump set 10-12 HP three Phase AC supply including replacement of mechanical seal, ball bearing, O ring set, Oil, nut bolt packing etc complete including credit for dismantled copper wire complete. |
| 9 | Rewinding/ repairinig/ servicing and over hauling of drainage de-watering submersible pump set 20-30 HP three Phase AC supply including replacement of mechanical seal, ball bearing, O ring set, Oil, nut bolt packing etc complete including credit for dismantled copper wire complete. |
| 10 | Rewinding/ repairinig/ servicing and over hauling of drainage de-watering submersible pump set 40-50 HP three Phase AC supply including replacement of mechanical seal, ball bearing, O ring set, Oil, nut bolt packing etc complete including credit for dismantled copper wire complete. |
| 11 | Lifting and taking out up to 3HP submersible pump set from the existing sump underground tunnel service corridor with the help of chain pulley and tripod stand including disconnection of suction and delivery pipeline and eclectic connection etc. as required at site and as per direction and to the entire satisfaction of engineer in charge . |
| 12 | Installation lowering of sewerage submersible dewatering pump upto 3HP pump set capacity in the existing sump in underground tunnel with the help of chain pulley, tripod stand , Electric cable of outgoing and incoming cable testing etc. complete in all respect as per direction entire satisfaction of engineer-in –charge. |
| 13 | Lifting and taking out 10-12HP submersible pump set from the existing sump underground tunnel service corridor with the help of chain pulley and tripod stand including disconnection of suction and delivery pipeline and eclectic connection etc. as required at site and as per direction and to the entire satisfaction of engineer in charge . |
| 14 | Installation lowering of sewerage submersible dewatering pump 10-12 HP pump set capacity in the existing sump in underground tunnel with the help of chain pulley, tripod stand, Electric cable of outgoing and incoming cable testing etc. complete in all respect as per direction entire satisfaction of engineer-in –charge |
| 15 | Lifting and taking out 20HP to 30 HP submersible pump set from the existing sump underground tunnel service corridor with the help of chain pulley and tripod stand including disconnection of suction and delivery pipeline and eclectic connection etc. as required at site and as per direction and to the entire satisfaction of engineer in charge. |
| 16 | Installation lowering of sewerage submersible dewatering pump 20 HP to 30 HP pump set capacity in the existing sump in underground tunnel with the help of chain pulley, tripod stand, Electric cable of outgoing and incoming cable testing etc. complete in all respect as per direction entire satisfaction of engineer-in –charge. |
| 17 | Lifting and taking out 40HP to 50HP submersible pump set from the existing sump underground tunnel service corridor with the help of chain pulley and tripod stand including disconnection of suction and delivery pipeline and eclectic connection etc. as required at site and as per direction and to the entire satisfaction of engineer in charge . |
| 18 | Installation lowering of sewerage submersible dewatering pump 40HP to 50HP pump set capacity in the existing sump in underground tunnel with the help of chain pulley, tripod stand, Electric cable of outgoing and incoming cable testing etc. complete in all respect as per direction entire satisfaction of engineer-in –charge. |
| 19 | Supplying, Installing, Testing & Commissioning (SITC) of 3 HP Sewage Submersible Pump, 3-Phase, 415V, 50Hz, with non-clog impeller, CI body, with minimum discharge 400 litre per minute at 14 meter head, suitable for sewage application, complete with SS shaft, mechanical seal, cable, guide rail system, and all associated works as required as per entire satisfaction of engineer in charge. |
| 20 | Supply ,installation ,testing and commissioning of fully automatic control panel / three phase controler of contactor rating 3.8-6A premium quality with Auto and Manual Operation suitable for up to 3 HP electrics dewatering submersibles pump set with features of auto control ,reverse phase protection , with standard accessories power contractor ,over load relay, MCB/MCCB, A/M, U/M, indicating lamps, voltage selector, fuses, etc. all complete up to entire satisfaction of engineer-in-charge. ( The old unserviceable Panel is the property of agency) |
| 21 | Providing and fixing MCCB type DN2-250D thermal release range 200-250 Ampere, 4 pole to regulate the main supply to panel board complete as per direction of Engineer-in-charge. MCCB 200-250A, 4 pole L&T or equivalent make |
| 22 | Hiring of 250 KVA or higher capacity Diesel engine generator set of make Kirloskar/ Shaktiman/ Jakson Cummins/ Luminous or equivalent mounted on M. S. base frame wheel trolley with suitable towing arrangements etc. complete as per direction, instruction and entire satisfaction of engineer-in-charge. (The rate shall include the cost of Diesel, Mobil oil/ engine oil & lubricants for running of D. G. set). |
| 23 | Engaging of one no. Generator operator cum electrician/pump operator for controlling & operation for submersible pump set, diesel de-watering pump & 250 KVA Generator set at required site / position including laying of cotton delivery pipes in required position for safe disposal of rainy water including all etc. complete as per direction & satisfaction of Engineer-in-charge. (a) Operator / Electrician |
| 24 | Transportation charges (to & fro) for 250 KVA or higher capacity Diesel engine generator set at site of work etc. all complete as per direction, instruction and entire satisfaction of Engineer-in-charge. |
| 25 | Providing and fixing 4 core 6 sq mm pvc insulated copper wire for dewatering pump panel box of reputed brand, all complete as per the direction and entire satisfaction of Engineer-in-charge. |
| 26 | Providing and fixing of cast iron double flanged Non Returned valve of 200 mm dia make of reputed make for 30-50 HP drainage dewatering submersible pump set including labour charges. Cartage etc. complete as per the direction of Engineer-in-charge. |
| 27 | Service and overhauling of cast iron double flanged Non Returned valve of 100-200 mm dia make of Kirloskar for 20 HP to 40 HP drainage dewatering submersible pump set including valve, Cartage etc. complete as per the driection of Engineer-in-charge. Please Enable Macros to View BoQ information |