|
| 1 | Repairs to plaster of thickness 12 mm to 20 mm inpatches of area 2.5 sqm and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground with all leads and lifts including finishing even and smooth and curing complete as per direction of the Engineer in charge:-13.30.1 With cement mortar 1:3 ( 1 cement : 3 fine sand ). |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: |
| 4 | i) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) |
| 5 | iii) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work up to plinth level1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Providing, hoisting and fixing above plinth level up tofloor five level precast reinforced cement concretework in string courses, bands, copings, bed plates,anchor blocks, plain window sills and the like,including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1cement : 1.5 fine sand : 3 graded stone aggregate 20mm nominal size). |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. i) 5.19.4 Thermo-Mechanically Treated bars of grade Fe-500D ormore |
| 9 | Providing structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required. |
| 10 | Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required. |
| 11 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.9.12.1 Hot finished welded type tubes |
| 12 | First class brick work in foundation and plinth including cost of all materials as required complete:-i) In cement mortar 1:6 ( 1 cement : 6 fine sand ). |
| 13 | 6.3 First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-6.3.3 In cement mortar1:4 (1 cement :4 fine sand ). |
| 14 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 15 | 12 mm cement plaster of mixi) In cement mortar 1 : 6 ( 1 cement : 6 fine sand ) |
| 16 | Neat cement punning. |
| 17 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth. |
| 18 | 8.1 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position :8.1.3 Local Teak Wood |
| 19 | Renewing wooden beams in roofs, including making good the holes in wall and painting with oil type wood preservative of approved brand and manufacture asrequired including removal of rubbish to the dumpingground with all leads and lifts complete as per directionof the Engineer in charge:-13.24.1 Not exceeding 4.0 metre in length:-13.24.1.2 Karai wood. |
| 20 | 14.22 Dismantling GS sheet roofing including ridges, hips, valleys, gutters wind ties etc. including ismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc.complete as per direction of the Engineer- in-charge. |
| 21 | Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.11.1.2 0.63mm thick with zinc coating not less than 275gm/m2 |
| 22 | 13.52 Painting with synthetic enamel paint ( one or morecoats ) of required colour of approved brand andmanufacture on old work to give an even shadeincluding preparation of surface as required completeas per direction of the Engineer in charge. |
| 23 | Finishing walls with water proofing cement paint ofrequired shade of approved brand and manufacture onold work ( one or more coats ) including preparation ofsurface as required complete as per direction of theEngineer in charge. |
| 24 | Distempering with oil bound washable distemper ofapproved brand and manufacture and of requiredshade on old work ( one or more coats ), to give aneven shade as required complete as per direction of theEngineer in charge. Please Enable Macros to View BoQ information |