| 1 | SH:-I- Provision of Electrical work at Nari NiketanWiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit, with piano type switch, phenolic laminated sheet, suitable size M.S. box and earthing the point with 1.5 sq.mm. FRLS/HFFR PVC insulated copper conductor single core cable etc. as required. |
| 2 | Group C |
| 3 | Wiring for circuit/ submain wiring along with earth wire with the following sizes of FRLS/HFFR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. |
| 4 | 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire |
| 5 | 2 X 4 sq. mm + 1 X 4 sq. mm earth wire |
| 6 | Supplying and fixing metal box of 180mm X 100mm X 60mm deep (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 6 pin 5/6 & 15/16 A socket outlet and 15/16 A piano type switch, connections, painting etc. as required. |
| 7 | Supply, Installation, Testing and Commissioning of LED Batten light (System lumen efficacy ≥120 85%, Operating voltage AC 140- 270 Volt, frequency 50/60 hz, Operating temp range -5 0C to 40 0C, internal surge protection of 2.5 KV with Short & Open circuit protection ,THD < 10% , P. F.≥0.95, IP20, CRI >80, Flicker free (flicker should be below 5 %), life time (LED,Driver & electrical circuitry), of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Colour Matching) <3, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard. Manufactures Word Mark/ Name Engraved/Embossing/ Screen printing on housing. complete in all respect i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥120 <135 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not riseabove 90°C). Powder coated die cast /Extruded aluminiumBody (Thickness > 1.20 mm) |
| 8 | 40 watt |
| 9 | Supply, Installation, Testing and Commissioning of LED Flood Light, powder coated pressure die cast aluminium (System lumen efficacy ≥120 and 85%, Input voltage: Input voltage: 140-270 Volt AC, frequency 50/60 hz, Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI >70, under voltage and over voltage protection, EMI-EMC as per CISPR-15, lenses for beam angle 30 deg-120deg as per the application and the project requirement, suitable tilt able fitting, life time (LED, Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Colour Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥120 and <135 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted.. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink ofaluminium housing such that LED junction temperature shall not rise above 90°C). |
| 10 | 100 Watt |
| 11 | Supply, Installation, Testing and Commissioning of ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. metal(Aluminium alloy) blades, 30 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper inding, steel/Al body. Power Factor not less than 0.9, Service Value (CM/M/W) minimum as below, 350 RPM (tolerance as per IS : 374-2019), THD (Total Harmonic Distortion) less than 10%, remote (preferably mobile app based) for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 0C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC supply Ceiling Fan compliant to IS 374:2019 fan i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required. |
| 12 | 1200mm, service value ≥ 6.0 CM/Min/Watt, air delivery 210 CM/Min (Minimum) |
| 13 | Supplying & laying of 3 x 10 Sq.mm XLPE insulated and PVC sheathed Aluminium conductor armoured power cable of 1.1 KV grade conf. to IS 7098 (Part-I) on surface with the help on suitable clamp etc. As required |
| 14 | Supplying, Installation, Testing and Commissioning of 450 mm Sweep fresh air metal body exhaust fan minimum 1400rpm including louvers and shutter, fixing with suitable arrangement, connection with 1.5 sq.mm. FRLS PVC insulated wire complete etc. as reqd. |
| 15 | SH:-II- Providing & Fixing of New Air Conditioner at Child Welfare Communitee-VIISupply , Installation, Testing and Commissioning of Air Cooled Hi Wall split type Air conditioners complete with Indoor unit(IDU), Out door unit (ODU), surface / concealed copper Refrigerant piping with insulation (closed cell elastomeric nitrile rubber tubular pipe section) upto 3 Mtr (IDU to ODU), copper power cable upto 3.5 Mtr (IDU to ODU) i/c drain pipe R-32/R-410/ R- 407 Green Refrigerant, wireless Remote control, suitable for working between 180-260V with low & high voltage cutoff and 50 hz ,1 phase AC supply capable of performing cooling, dehumidification, air circulation of following capacity with Scroll / rotary compressor. The system shall be able to deliver 100% of the rated capacity upto 42 Degree Celsius. Min 5 year Original Equipment Manufacturer (OEM) warranty both compressor and Printed Circuit Board (PCB). Must comply : Electrical cable IS 694 or IS 9968 temperature sensing control IS /International Electro technical Commission (IEC) 60730, hermetic compressor IS 10617, heat exchanger IS 11329, capacitor IS 2993 and motor IS 12615. Complete as per CPWD specification and IS : 1391 Part II 2023. The system shall be able to operate up to 50 0C (out door ambient temperature). |
| 16 | 1.5 TR with 5 Star BEE Rating |
| 17 | Providing and fixing of readymade MS fabricated and duly painted, wall bracket type stands for mounting the Split AC. outdoor unit including grouting on the wall and making good the damages to surface complete with rubber vibration pads on outdoor unit bolts etc. complete as required |
| 18 | SITC of 5 KVA capacity Automatic Line Voltage stablizer copper bound wall mounted having following specifiation with TDR. :-(a) Input Voltage : 170-275 volt(b) Output Voltage : 230 volts (+ 10%) |
| 19 | Supply, Installation, testing and commissioning including vaccumiazation and Nitrogen testing of following nominal sizes of soft/hard drawn copper refrigerant piping for VRV/VRF system, complete with fittings, with suitable adjustable ring type hanger supports, jointing/brazing including accessories, insulated with XPLE Class-O tubular insulation/with Class-O closed cell elastometric nitrile rubber tubular sleeves sections of 19 mm thick insulation as given below for Suction and Liquid lines, all accessories as per specifications etc. as required : |
| 20 | 9.5 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm |
| 21 | 12.7 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm |
| 22 | Supplying & fixing suitable size Gl box wih modular plate and cover in fronton surface or inrecess including oviding and fixing 25 Amodular socket outlet and 25 A modular SP MCB, \\"C\\" curve including connections, painting etc. as required. |
| 23 | Buy Back Credit Dismantle to Contractor |
| 24 | 1.5 TR Split AC Please Enable Macros to View BoQ information |