|
| 1 | PART A (MONTHLY) |
| 2 | Supply of High Skilled Staff for running the Plant (rate inclusive of monthly salary, out station allowance, to and for travelling expenses, bonus, etc. (ANNEXURE II) |
| 3 | (i) Skilled Technician |
| 4 | (ii) Plumber (Semi-Skilled) |
| 5 | (iii) Operator (Semi-Skilled) |
| 6 | Replenishment of filter media in filter units, including supply of quartz sand as per specification & inclusive of labour charges. (ANNEXURE III ) |
| 7 | Estimate of Washing & Cleaning of Aerator (ANNEXURE VII) |
| 8 | Estimate of Washing & Cleaning of Sedimentation Tank (ANNEXURE I) |
| 9 | Monthly inspection charge of the plant & submission of report (with laboratory test result) on the generalhealth of the plant. [ Add 6%(3% + 3%)] (ANNEXURE VIII) |
| 10 | Supply of following chemical per month. |
| 11 | (i) Alum (Non Ferric) |
| 12 | (ii) Bleaching Powder |
| 13 | (iii) Lime |
| 14 | PART B (YEARLY) |
| 15 | Supply and fitting of PVC Float Valve with float (ANNEXURE IV) |
| 16 | Labour charge for dismantling/ repairing of 150mm/200mm valve providing gasket, packing and fitting etc. complete. (ANNEXURE XVII) |
| 17 | Supply of Non-return valve as per IS 5312 (ANNEXURE V) |
| 18 | (a) 150 mm |
| 19 | (b) 200 mm |
| 20 | (c) 250 mm |
| 21 | Supply of Air release valve (ANNEXURE XVIII) 80mm |
| 22 | Washing and cleaning of Overhead Reservoir (Tank wall / Conical slabs / Bottom Dome) in WTP-I and II (ANNEXURE IX) |
| 23 | Cleaning of underground Reservoir (ANNEXURE X) |
| 24 | Supply of CI D/F sluice valve with CAP/WHEEL as per IS 14846/2000 PN 1.0 with ISI marking (ANNEXURE XI) |
| 25 | a) 150 mm |
| 26 | b) 200 mm |
| 27 | (c) 250 mm |
| 28 | Labour charge for carrying, placing in position, fitting and fixing CI sluice valve (with wheel & cap) CI retlex valve complete with supplying bolts and (ANNEXURE XII) |
| 29 | (a) 150mm |
| 30 | (b) 200mm |
| 31 | (c) 250 mm |
| 32 | Supply of GI bend (ANNEXURE XIII), 150mm |
| 33 | Supply of GI threaded flange (ANNEXURE XIV), 150mm |
| 34 | Labour charge for lifting of submersible pump set for repairing and disjointing the suction pipes and stacking the same in proper place for re use as required as directed. (ANNEXURE XV) a) Upto 30.00m Depth |
| 35 | Labour charge for re-installation of submersible pump set after repairing, cleaning, cutting and threading the pipe ends as required including fitting, fixing of saction pipes with jointing materials and commissioning and testing the all complete as required as directed. (ANNEXURE XVI) b) Upto 30.00m Depth |
| 36 | Labour Charge for dewatering, cleaning and washing of Elevated and undergorund service reservoire tank (Yearly) Please Enable Macros to View BoQ information |