| 1 | Providing comprehensive Design and Consultancy Services for for PROVISION OF DEFICIENT STORE HOUSE AT MO (G) buildings, including preparation of all architectural, structural and services drawings, detailed estimates complete in all respects. The building shall be well planned, designed and details as per latest norms, energy efficient, ensuring functionality, safety, economy and modern aesthetics all as per the directions of AGE/GE/CWE/Director E6 of CENM complete all as specified and as directed. |
| 2 | The followings bldgs are included in the project, |
| 3 | (a) Construction of storage accomodation (G+1), including stairs and ramps, storage racks at side walls and lifts with permanent specification based on SSR 2010 for OTM Accn issued vide E-in-C's branch letter No A/83975/PA/OTM Accn /E2W (PPC) dt 04 Dec 12.- 1248 Sqm |
| 4 | (a) Constrution of AC Plant with permanent specification - 130Sqm |
| 5 | (c) Construction of RCC semi UG sump of 40000litrs for fresh water with permanent specifications etc complete |
| 6 | (d) Construction of terrace static tank (10000 Litres) in permanent specification as shown on drgs and as specified. |
| 7 | Planning of underground precast drainage system all as specified. |
| 8 | Note :-The project aims to provide a well-planned, energy-efficient, user-friendly storage accom with a modern architectural appearance and structural stability. The details of buildings and area attached in appx 'A' |
| 9 | PHASE I |
| 10 | 1. Site visit and assessment2. Collection of client requirements3. Preparation of conceptual layouts & planning options4. Approval of concept design |
| 11 | B. Architectural Design & Drawings |
| 12 | 1. Preparation of conceptual and detailed architectural designs for the above building.2. Space planning for all rooms of towers3. Preparation of detailed architectural drawings, including:(a) Site layout plan.(b) Floor plans.(c) Elevations and sections.(d) Toilet, door-window, and finishing schedules.(e) Preparation of a modern front elevation design, with 3D views and renderings for MES approval.4. Compliance with local building bye-laws and statutory norms. 5. Drawings approval will be taken from Dir(Arch)/E6-CENM |
| 13 | C. Preparation of Design Basis Report (DBR) |
| 14 | 1. Preparation of a Design Basis Report 2. Structural analysis and design as per relevant IS codes 3. Preparation of: (a) Foundation drawings (b) RCC framing plans (c) Reinforcement detailing 4. Structural stability certificate 5. Applicable codes and standards (NBC, IS Codes, local bye-laws, Fire Safety, etc.).6. Preliminary concept plans and design philosophy. |
| 15 | D. Structural Design & GFC Drawings |
| 16 | 1. Good for Construction (GFC) drawings 2. Coordination drawings (Architectural + Structural) 3. Structural drawings for foundation, columns, beams, slabs, and staircases.4. Bar bending schedules and reinforcement detailing etc5. Coordination with architectural design to ensure stability and serviceability.6. Soil bearing capacity and load considerations 7. The struc analysis and design to be approved by E2(Design) CENM before proof checking.8. Proof checking & vetting : Vetting from IIT/NIT & submission of all struc drawings as per latest IS codes & peactice. |
| 17 | E. Services Coordination (as applicable) E/M services |
| 18 | 1. Space planning for Electrical, Plumbing, Fire Fighting, lift and External water and Electrical Supply.2. Indicating all openings, shafts, ducts, and chases on architectural and structural drawings. |
| 19 | F. Preparation of Working Drawings |
| 20 | 1. Final working drawings for construction and execution.2. Layouts showing all necessary dimensions and references.3. Schedule of doors, windows, floor finishes, and materials. |
| 21 | G. E/M Items |
| 22 | 1. Electrical |
| 23 | 1.1 Lighting (general & individual)1.2 Night lighting 1.3 Shadow less light 1.4 Light & power sockets 1.5 Call bells1.6 Emergency light1.7 Voltage stablizers1.8 Stand by generators 1.9 Lightning protection1.10 Red-green bulb indicators 1.11 Designing of External Electric Supply system identified Tapping point |
| 24 | 2. Ventilation |
| 25 | 2.1 Ceiling fans 2.2 Pedestal fans 2.3 Exhaust fans |
| 26 | 3. Water Supply |
| 27 | 3. Designing of External water supply & tapping point (checking of water availibility from existing sources or to enhance) |
| 28 | 4. Refrigeration |
| 29 | 4. Water coolers |
| 30 | 5. Air conditioning (Air Cooling & Air heating |
| 31 | 5.1 Air cooling5.2 Air heating5.3 HV/AC System |
| 32 | 6. Traction & communication system |
| 33 | 6. Lifts |
| 34 | 7. Fire Protection System |
| 35 | 1. Safety against fire 2. First aid free equipments 3. Fire alarm4. Fire detector system 5. Fire fighting & Fire suppression system |
| 36 | H. Codes and Standards |
| 37 | The design shall comply with:1. National Building Code (NBC 2026)2. Bureau of Indian Standards (IS Codes)3. Fire Safety Norms for Hospitals4. Local Building Bye-laws and Guidelines |
| 38 | I. BOQ & Costing |
| 39 | 1. Preparation of detailed Bill of Quantities (BOQ) & yardstick for all the buildings as per the approved arch & struc dwgs as per DSR (latest applicable).2. Rate analysis/Market analysis. 3. Abstract cost estimate. 4. Draft tender document.5.Estimates,yardstick,MA & draft tender documents will be duly approved by Der(c)/E8 CENM. |
| 40 | J. Deliverables to the department: |
| 41 | The consultant shall submit:1. Design Basis Report (DBR) – 3 sets (soft & hard copy).2. Conceptual design drawings 8 sets (soft & hard copy).3. Final approved architectural drawings (AutoCAD + PDF) 8 sets hard copy4. Structural design report and drawings (AutoCAD + PDF) 8 sets hard copy6. Working drawings for execution. (8 sets hard copy)7. BOQ - 3 sets (soft & hard copy). |
| 42 | 8. Rate analysis - 3 sets (soft & hard copy).9. Tender documents - 3 sets (soft & hard copy).10. The conceptual drawings shall be submitted in duplicate hard copies for approval of User MO Goa and HQ CE (Navy) Mumbai (secions E2 (plg), E2(des), E4, E6, E3,& E8). Presentation to User/HQ CE and obtaining approval at all stage shall be the responsibility of the consultant. Preparation of complete conceptual plans, architectural drawings (Elevation, Sections and Schedule of finishes), Site Plan including 3D views (interior & exterior). The drawings will cover detailed working drawings to minutest details (including all furnitures, modular kitchen and plumbing,sanitary fittings) with reference to technical, architectural, and functional requirements in soft & hard copy. Space/Area analysis in tabular graphical formats. |
| 43 | PHASE II (After completion of Work) |
| 44 | Providing necessary tech support during construction stage till completion of work, including issue of clarification on drawings/designs, review of contractor queries, coordination with user/MES/ agencies, checking of working drawings and assistance during testing, commencing and handing over. Please Enable Macros to View BoQ information |