| 1 | Earth work execavation of foundation trench in hard soil including dressing and levelling the bed with initial lead of 50m. And 1.5 m. initial lift including all cost of labour materials required for the work etc. complete as per direction of Enginner-in charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royality , taxes of all materials, labour and T& P required for the work etc.complete as per direction of Enginner-in charge. |
| 3 | Cement concrete (1:3:6) with 4cm. Hnad broken hard granite metal including laying in layer in layer not exceeding 300 mm in depth,ramming, compacting to proper thickness , watering ,curing for even days with cost conveyance, royality , taxes of all materials, labour and T& P required for the work etc.complete as per direction of Enginner-in charge. |
| 4 | Brick work with Fly ash . Brick in F & P cement mortar (1:6) having crushing strength not less than 75.00 kg/cm2 immering the bricks in water not less than six hour cost conveyance , royality royality , taxes of all materials, labour and T& P required for the work etc.complete as per direction of Enginner-in charge. |
| 5 | Brick work with Fly ash . Brick in Superstructure in cement mortar (1:6) having crushing strength not less than 75.00 kg/cm2 immering the bricks in water not less than six hour cost conveyance , royality royality , taxes of all materials, labour and T& P required for the work etc.complete as per direction of Enginner-in charge. |
| 6 | Reinforcement cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position comacting to specified design section curing for prper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc etc.complete and as per direction of Enginner-in Charge. |
| 7 | Column Footing |
| 8 | Plinth Band |
| 9 | Column & Beam |
| 10 | Lintel |
| 11 | Roof Slab |
| 12 | Labour Charges for cutting , bending , binding and trying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of TATA TICSCON /SAIL/JINDAL steel rod and as per dwaing , design and direction of Engineer -in-charges. |
| 13 | Supplying, fitting, fixing up window (Slide type) make up aluminium section 9778, as window frame section no. 4095,4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour T & P including cost of glass etc. |
| 14 | Providing fitting, fixing of AL door with OEL anodized AL door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member with frame section as 9221 with tapered dip No 4660 and the frame to be completed by mean of joining angle no 1855 including cost of labour, T & P hire charges of drilling machine, labour charges etc complete. |
| 15 | Supplying, fitting and fixing vetrified tile in floor of size 600mmx 600mm approved make conforming make conferming to IS :13755 laid on 20mm thick cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials , labour T & P etc required for the work. |
| 16 | Fixing the tile in dados skirting riser of step on 12mm thick C.PC (1:3) joint with neat cement slurry mixed with pigment to matches the shade of the tile including rubbing and polishing complete. |
| 17 | 12mm thick cement plaster (1:6) on brick work including watering and curing with all cost ,conveyance, royality etc complete. |
| 18 | 16mm thick cement plaster (1:6) over brick or stone masonary including watering and curing with all cost .conveyence, riyality etc complete. |
| 19 | Supplying and Priming coat one coat with any approved primer including all cost etc. |
| 20 | Providing finishing wall surface of wall Acrylic Wall putty of approved make and including cost of conveyance of materials including cost of putty with all taxes and cvost of Labour Etc. |
| 21 | Finishing wall two coat with Plastic Emulsion paint over a coat of oil bound cement primer , Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. |
| 22 | Finishing wall two coat with weather coat over a coat of oil bound cement primer , Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |