| 2 | Survey, Soil investigation, Design, Construction and commissioning of Sewerage System in NAGAR PALIKA PARISHAD BETUL area including.1. Providing, laying, jointing, testing and commissioning of sewerage pipeline including construction of manholes and sewer appurtenances with road restoration works complete2. Providing house sewer chambers and laterals for connecting sewer to consumer sewer lines. 3. Providing House Sewer Connection for approximately 17655 Nos including construction of collecting chamber, Public toilets, and institutions etc.4. Design, construction, testing and commissioning of 3 Nos Intermediate Sewage Pumping station IPS-1 of capacity of 4.97 MLD, IPS-2- 5.38 MLD and IPS-3 - 4.03 MLD with pumping systems including all necessary civil, electromechanical and instrumentation works complete for successful completion of the project.5. Design, construction, testing and commissioning of 1 no. Sewage Treatment Plant (STP) of capacity 16.0 MLD with main pumping station (MPS) including all necessary civil, electromechanical and instrumentation works complete for successful completion of the project.6. Supply installation testing commissioning of complete Electromechanical system. which includes but not limited to suitable rating of Transformer, DG Set, substation, HT & LT transmission line, All pump motor set, all HT (VCB Panel), LT panels, all VFD’s & starter panels, APFC panels, EOT & mechanical cranes, all pipes and fittings, all valves (mechanical and motorized), earthing, cable tray arrangement etc. in line with CPHEEO requirement, complete in all respect. for intermediate pumping station and Sewage treatment plants.7. Preparation of maps of proposed sewerage network and property connection to be laid under the contract with GIS mapping.8. Supply installation testing and commissioning of PLC- SCADA and OCEMS for monitoring and controlling of sewerage system as per requirement of NGT guideline and PCB norms.9. Supply installation testing commissioning of complete instrumentation system applicable for STP area and IPS area as per CPHEEO manual and system requirement. 10. Operation and Maintenance of the scheme for 5 years and 5 years defect liability after successful commissioning of scope of complete works. Please Enable Macros to View BoQ information |