|
| 1 | Dismantling Of old CC or Brick or granolithic floors including base concrete and including stacking of dismantled material as directed by the Engineer -in-charge with in a distance of 60 metre(200 Feet) S.No 697 |
| 2 | Dismantling Brick Work or stone work in lime or cement mortar and including stacking of materials as Directed by the Engineer-in-charge with in a distance of 60 meter(200feet) |
| 3 | Deduction cost of old brick bat (SOR UP PWD Supply SI - 1F) |
| 4 | Deduction cost of old brick (SOR UP PWD Supply SI - 1F) |
| 5 | Disposal of Excavated Soil up to 5.00 KM distance complete with labour T&P ETC at site. (SOR UP PWD SI - 131(A) |
| 6 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 273) |
| 7 | Cement Concrete in proportion of 8:4:1 with 4cm guage approved stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 279) |
| 8 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including suopply of all material labour, T &P etc. required for proper completion of the work. (SOR UP PWD - 305A) |
| 9 | 12 mm thick plaster with cement and approved fine sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. (SOR UP PWD SI - 584) |
| 10 | R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SOR UP PWD SI - 284 A) |
| 11 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape as necessary inclding bending for proper complition of the work and including supply of all steel & wastage, bend, hooks and authorised overlapping hall be measured. (SOR UP PWD - 504) |
| 12 | Plain Cement Concrete with 2c.m.gauge approved slone balliast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD - 279 A) |
| 13 | Cement Concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in ncrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. (UP PWD SOR - New Item -9) |
| 14 | Add 18%GST Please Enable Macros to View BoQ information |