Name of Work:- < Arresting of Leakage and other general maintenance work of Power Transformers at various Substations/Store of KESCo >
Sl. No.
Item Description
1
For 05 MVA Transofrmer:
2
Arresting Oil Leakage of Power Transformer by replacement damaged/old gasket 8 mm or 10 mm thickness and tightening of nut & bolt radiators conservator tank, top cover, drain valve etc.
3
Replacement of damaged HT Rod/HT bushing LT Rod/ LT bushing by draining of T/F oil in drums and after replacement of rod & bushing refilling of T/F oil.
4
Replacment defective radiators valve by draining out of T/F oil in drums and after work refilling T/F oil.
5
Replacment of damaged MOG.
6
Replacment of damaged WTI/OTI.
7
Replacment of damaged Bucholz Relay.
8
Replacment of damaged Silicagel Breather.
9
The above all works shall be carried out with the help of all requied material, accessories, oil drums, craine, T&P and Labour etc at contractor’s cost.
10
For 08/10 MVA Transofrmer
11
Arresting Oil Leakage of Power Transformer by replacement damaged/old gasket 8 mm or 10 mm thickness and tightening of nut & bolt radiators conservator tank, top cover, drain valve etc.
12
Replacement of damaged HT Rod/HT bushing LT Rod/ LT bushing by draining of T/F oil in drums and after replacement of rod & bushing refilling of T/F oil.
13
Replacment defective radiators valve by draining out of T/F oil in drums and after work refilling T/F oil.
14
Replacment of damaged MOG.
15
Replacment of damaged WTI/OTI.
16
Replacment of damaged Bucholz Relay.
17
Replacment of damaged Silicagel Breather.
18
The above all works shall be carried out with the help of all requied material, accessories, oil drums, craine, T&P and Labour etc at contractor’s cost. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.