| 1 | Tower Material Supply (A) HT |
| 2 | (B) MS |
| 3 | Hot dip galvanised, hexagon,Round hexagon head transmission towers bolts ,nuts &washers for above structure as per BOM. |
| 4 | Tower Accessories (A) Number plate |
| 5 | (B) Danger Plate |
| 6 | (C) Phase plate in sets of red, blue, and yellow |
| 7 | (D) Circuit Plate (Set of 2) |
| 8 | (E) Anti-Climbing Device |
| 9 | (F) Bird guard for towers |
| 10 | (G) Pipe Type Earthing Material |
| 11 | Composite Sillicon Rubber Insulator String. 160 KN suitable for 220 KV Tension Fitting |
| 12 | OPGW And Accessories :- (A) OPGW(48F) |
| 13 | (B) Supply Of Hardware Set for 48F (DWSM) OPGW |
| 14 | (C) Joint Box(48F) |
| 15 | Conductor (A) HTLS Conductor (equivalent to ACSR Zebra) |
| 16 | Hardware and Insulators. (A) Single Tension fitting of HTLS eq to Zebra conductor |
| 17 | (B) Double Tension fitting of HTLS eq to Zebra conductor |
| 18 | Accessories for Conductor. (A) Vibration Damper |
| 19 | (B) Mid Span Compression Joint |
| 20 | (C) Repair Sleeve |
| 21 | (D) PA Rod |
| 22 | Erection :- Survey including preparation of schedule of materials, marking of locations, (Route Length), GPS Survey of line with co-ordinates of each tower |
| 23 | Check survey & final peg marking |
| 24 | Soil Investigation |
| 25 | Dismantling and De-stringing works. (A) De-Stringing of old conductor (D/C Line)(From Location No. 45 to Location 46) |
| 26 | (B) De-Stringing of old OPGW, Rerolling on Empty drums and transportation to UPPTCL Stores(From Location No. 45 to Location 46) |
| 27 | (C) Dismantling of Tower (ABT A+0), Stacking of Tower parts and related works |
| 28 | Cost of Excavation of 220 KV foundation pits including all earthwork, backfilling & levelling etc. |
| 29 | Stub Setting. Setting of stubs including all foundation work but excluding the cost of concerting & excavation for following 220 KV Towers. (A) 220 KV NBMC (C+0) |
| 30 | (B) 220 KV NBDC (B+9) |
| 31 | Concreting :- Cost of Concreting for following 220 KV Tower Foundation including cost of cement, Dewatering, Shoring & shuttering, Forming and curing but excluding cost of reinforcement bars.(M-20)(1:1.5:3) |
| 32 | Cost of Concreting for following 220 KV Tower Foundation including cost of cement, Dewatering, Shoring & shuttering, Forming and curing but excluding cost of reinforcement bars.(M-10)(1:3:6) |
| 33 | Installation of steel reinforcement bars in RCC foundation including cost of steel reinfocement bars with cutting, placing them in foundation pits. |
| 34 | Tower Erection Work :- Erection of Super structure of 220 KV DC tower and their extension where ever requide incl. all works G.L exl. Fitting of danger, number, phase plates, bird guards and fixing and punching. |
| 35 | Erection of Super structure of 220 KV MC tower and their extension where ever requide incl. all works G.L exl. Fitting of danger, number, phase plates, bird guards and fixing and punching. |
| 36 | Tack welding |
| 37 | HTLS Stringing Works :- Laying, Stringing, Tensioning, Clamping, Jointing etc of ACSR HTLS of all 3 Phases FOR PALI-SEC 129 NOIDA LINE |
| 38 | Laying, Stringing, Tensioning, Clamping, Jointing etc of ACSR HTLS of all 3 Phases FOR 400KC SEC 148 NOIDA-220KP-5 LINE |
| 39 | OPGW and Accessories Works :- Installation, Laying, Testing and Commissioning of Links of 48F(DWSM)OPGW Fibre along with all necessary hardware sets excluding the Joint Box |
| 40 | Splicing and Installation of Joint Box(48F) |
| 41 | Earthing Works :- Grounding work including earth work for pipe type grounding including cost of coke and salt Please Enable Macros to View BoQ information |