| 1 | Supply of good earth work banking excavated earth in layers not exceeding 20 cm in depth breaking clods watering rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads flood banks marginal banks and guide banks or filling up ground depressions all lead as per (a.r.) for all kind of soils |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Based on SOR UP PWD 2020) |
| 3 | Dismentling 60/80mm thick factory made cement concrete interlocking paver block of isi marked made by block making machine with strong vibratory compaction of approved size |
| 4 | Re-laying 80 mm thick factory made cement concrete Interlocking paver block(ISI Marked) made by block making machine with strong vibratory compaction of approved size design, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming |
| 5 | Providing and laving 60 mm thick factory made cement concrete Interlocking paver block(ISI Marked) made by block making machine with strong vibratory compaction of approved size design, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming (UP PWD SOR 2020) (New SOR Based DAR 16.68) |
| 6 | Providing and laying in position cement concrete with 4 cm gauge approved stone ballast c sand and cement in pro of 8:4:1 including supply of all material labour tools and plants etc req for proper comp of work |
| 7 | M-150 brick work in 1:6 cement & fine sand 1.25f.M mortar in foundation and plinth including supply of all materials labour complection of the work compiation of work (1:4:8) |
| 8 | 12mm Cement Plaster of mix 1:6 (1 cement : 6 coarse sand) |
| 9 | Cement Concrete with 4cm gauge approved stone ballast corse sand and cement in the propertion of 4:2:1 including supply of all material labour tools and plants etc required for proper completion of the work. Same as above item no.279 but with 2cm gauge stone grit in stend of 4cm gauge stone lallast. UP PWD SOR-2020/DAR-18/279a |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note:- Cement content considered in this item is @330 kg/cum.Excess/less cement used as per design mix is payable/recoverableAll work up to Plinth level. UPPWD/SOR/DAR/5.33.1 |
| 11 | Centering and shuttring including strutting ptopping etc suspended floors roofs landing balconies and access platform |
| 12 | Reinforcement for RCC work all complete upto plinth level mild steel and medium tensile steel bar |
| 13 | Dry Brick on Edge flooring in required pattern wirh bricks of class designation 150 on bed of earth including filling compressed woth M-150 Brick Please Enable Macros to View BoQ information |