|
| 1 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and inany floor including removing rubbish within alead of 75m as directed. |
| 2 | Dismantling all types of masonry excepting cementconcrete plain or reinforced, stacking serviceablematerials at site and removing rubbish as directedwithin a lead of 75 ma) In any floor including roof.. |
| 3 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steelbars. in any floor including roof2ndfloor. |
| 4 | Hire and labour charges for shuttering with centering and necessary stagingupto 4 m using approved stout props and thick hard wood planks of approvedthickness .....(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge. |
| 5 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond thecompound, in conformity with the Municipal /Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 6 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) inany floor. |
| 7 | Labour for Chipping of concrete /plaster surface before taking up Plastering/putty work. |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,scaffolding/staging where necessary (in gf floor).With 1:6 cement mortar(a) 20 mm thick plaster any floor |
| 9 | Supplying, fitting & fixing granite slabs 15mm to 18 mm. thickwith uniform texture & without decorative veins in columns,wall, facia,rise etc. with 15 mm thick [avg] cement mortar(1:2) including making suitable arrangements to hold thestones properly by brass / copper hooks including pointing incement mortar (1:2) (1 white cement : 2 marble dust) withadmixture of pigment matching the stone shades all completeas per direction of the Engineer-in-charge including cost of allmaterials, labours, scaffolding, staging, curing androughening of concrete surface complete.[Using cement slurry at back side of granite @ 4.4 kg/sq.m &white cement slurry for joint filling @ 1.8 kg/sq.m]Inanyfloor(a) Area of each Granite slab 0.6 to 1.0 Square meter. |
| 10 | (b) Area of each Granite slab above 1.00 Square meter. |
| 11 | Removing loose scales, blisters etc. from old painted surface andthoroughly smoothening the surface to make the same suitable for receiving fresh coat of paint. |
| 12 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparingthe surface throughly, complete as per manufacturer's specification andas per direction of the EIC. (In Ground Floor) (a) One Coati) Water based interior grade Acrylic Primer |
| 13 | Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) :(Two coats)ii) Luxury Quality |
| 14 | M.S. works in brackets made from flats, angles, tees etc. to sizesspecialy bent, twisted, forged; making holes drilled and fitted torafter of trusses with necessary bolts, nuts, washer or screws etc.(length of straight not less than 230 mm)(Add extra @1% for each additional floor upto 4th floor. @1.25%for each additional floor above 4th floor). |
| 15 | Labour for hoisting and placing in proper position (up to 1st floorlevel) departmental R.S. joists, channels, angles. Tees, plates etc.including fitting and fixing same with bolts and nuts, if necessary(but excluding cost of such bolts and nuts) |
| 16 | (a) Add extra for each additional floor over 1st floor. |
| 17 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominalsize) excluding shuttering and reinforcement,if any, in gound floor as perrelevant IS codes Pakur variety. |
| 18 | Add: GST @ 18 % Please Enable Macros to View BoQ information |