|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 3 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
| 5 | Reinforcement for reinforced cncrete works in all sorts structures including distributin bars stirrups binders initial straightening and remval f loose rust (if necessary ), cutting t requisite length , hking and bending t crrect shape placing in prper psitin & binding with 16 gauge black annealed wire at every intersectin, cmplete as per drawing & directin. (a) For works in foundation and upto roof of ground floor/upto 4 m |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hardwood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straightincluding fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm shuttering withoutstaging in foundation |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar, (c) 15 mm thick plaster |
| 8 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. |
| 9 | Earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm. includingwateringand rammingetc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. |
| 10 | TOTAL FROM SL NO. 1 TO 9 |
| 11 | Add GST @18% |
| 12 | Add CESS @1% Please Enable Macros to View BoQ information |