|
| 1 | Annual Comprehensive Maintenance of following capacity of RO Water purifier i/c replacement of all defective parts / wournout spare parts including Filter, Cartridge, SMPS, valve, divertor valve, polypropylene micron filter, pre carbon filter, post carbon filter etc. and Periodically servicing, breakdown visit during the contract period complete etc as required at site. (excluding replacement of pump, water level sensor and membrane) | Annual Comprehensive Maintenance of following capacity of RO Water purifier i/c replacement of all defective parts / wournout spare parts including Filter, Cartridge, SMPS, valve, divertor valve, polypropylene micron filter, pre carbon filter, post carbon filter etc. and Periodically servicing, breakdown visit during the contract period complete etc as required at site. (excluding replacement of pump, water level sensor and membrane) |
| 2 | 15 Lph RO Water purifier | 15 Lph RO Water purifier |
| 3 | 25 Lph RO Water purifier | 25 Lph RO Water purifier |
| 4 | 50 Lph RO Water purifier | 50 Lph RO Water purifier |
| 5 | 100 Lph RO Water purifier (industrial & commercial) | 100 Lph RO Water purifier (industrial & commercial) |
| 6 | Supply and replacement of following capacity of RO water purifier Booster pump complete as required at site and directed by Engineer-in-charge. | Supply and replacement of following capacity of RO water purifier Booster pump complete as required at site and directed by Engineer-in-charge. |
| 7 | 24-48 V,100 GPD (Gallon per day) for 15 Lph RO system. | 24-48 V,100 GPD (Gallon per day) for 15 Lph RO system. |
| 8 | 24-48 V, 150 GPD (Gallon per day) for 25 Lph RO system. | 24-48 V, 150 GPD (Gallon per day) for 25 Lph RO system. |
| 9 | 24-48 V, 300 GPD (Gallon per day) for 50 Lph RO system. | 24-48 V, 300 GPD (Gallon per day) for 50 Lph RO system. |
| 10 | 0.5 HP for 100 Lph RO system. | 0.5 HP for 100 Lph RO system. |
| 11 | 1.5 HP for 100 Lph RO system. | 1.5 HP for 100 Lph RO system. |
| 12 | Supply and replacement of membrane in existing installed following capacity of RO water purifier complete as required at site and directed by Engineer-in-charge. | Supply and replacement of membrane in existing installed following capacity of RO water purifier complete as required at site and directed by Engineer-in-charge. |
| 13 | 80 GPD for 15 Lph RO system. | 80 GPD for 15 Lph RO system. |
| 14 | 100 GPD for 25 Lph & 50 Lph RO system. | 100 GPD for 25 Lph & 50 Lph RO system. |
| 15 | 300 GPD for commercial 100 Lph RO system. | 300 GPD for commercial 100 Lph RO system. |
| 16 | Providing and fixing of float switch/water level sensor in 25, 50 & 100 Lph RO system complete as required at site and directed by Engineer-in-charge. | Providing and fixing of float switch/water level sensor in 25, 50 & 100 Lph RO system complete as required at site and directed by Engineer-in-charge. |
| 17 | Removing, repairing, finishing & refixing of wall mounted Iron frame RO stands with all accessories as required. | Removing, repairing, finishing & refixing of wall mounted Iron frame RO stands with all accessories as required. |
| 18 | Annual Comprehensive maintanance of Drinking water cooler of following capacity i/c replacement of all defective / wournout spare parts including filter capillary, relay, refrigerant gas, thermostate, overload protector, float valve set, tank cleaning, tightining of tray tap & Outer body (stainless steel), cooling tank On/Off switch, controlling PC inlet / outlet pipe etc with new parts during the periodical servicing and breakdown visits during the service contract period complete etc as required at site.(excluding tap, drip tray, compressor, condensor coil, fan motor.) | Annual Comprehensive maintanance of Drinking water cooler of following capacity i/c replacement of all defective / wournout spare parts including filter capillary, relay, refrigerant gas, thermostate, overload protector, float valve set, tank cleaning, tightining of tray tap & Outer body (stainless steel), cooling tank On/Off switch, controlling PC inlet / outlet pipe etc with new parts during the periodical servicing and breakdown visits during the service contract period complete etc as required at site.(excluding tap, drip tray, compressor, condensor coil, fan motor.) |
| 19 | 150 (cooling)/150 (Storage) litre | 150 (cooling)/150 (Storage) litre |
| 20 | 40 (cooling)/80 (Storage) litre | 40 (cooling)/80 (Storage) litre |
| 21 | 60 (cooling)/120 (Storage) litre | 60 (cooling)/120 (Storage) litre |
| 22 | Supply and Replacement of tap Brass Push Bib Cock with wall flange complete as required at site and directed by Engineer-in-charge. | Supply and Replacement of tap Brass Push Bib Cock with wall flange complete as required at site and directed by Engineer-in-charge. |
| 23 | Supply and Replacement of drip tray assembly of watercooler complete as required at site and directed by Engineer-in-charge. | Supply and Replacement of drip tray assembly of watercooler complete as required at site and directed by Engineer-in-charge. |
| 24 | Supply and Replacement of condensor coil assembly for following capacity of Water cooler complete as required at site and directed by Engineer-in-charge. | Supply and Replacement of condensor coil assembly for following capacity of Water cooler complete as required at site and directed by Engineer-in-charge. |
| 25 | 40 (cooling)/80 (Storage) litre | 40 (cooling)/80 (Storage) litre |
| 26 | 60 (cooling)/120 (Storage) litre | 60 (cooling)/120 (Storage) litre |
| 27 | 150 (cooling)/150 (Storage) litre | 150 (cooling)/150 (Storage) litre |
| 28 | Supply and Replacement of Compressor for Water cooler complete as required at site and directed by Engineer-in-charge. | Supply and Replacement of Compressor for Water cooler complete as required at site and directed by Engineer-in-charge. |
| 29 | 40 (cooling)/80 (Storage) litre | 40 (cooling)/80 (Storage) litre |
| 30 | 60 (cooling)/120 (Storage) litre | 60 (cooling)/120 (Storage) litre |
| 31 | 150 (cooling)/150 (Storage) litre | 150 (cooling)/150 (Storage) litre |
| 32 | Supply and Replacement of Fan Motor FHP (fractional-horsepower) for following capacity of Water cooler complete as required at site and directed by Engineer-in-charge. | Supply and Replacement of Fan Motor FHP (fractional-horsepower) for following capacity of Water cooler complete as required at site and directed by Engineer-in-charge. |
| 33 | 40 (cooling)/80 (Storage) litre | 40 (cooling)/80 (Storage) litre |
| 34 | 60 (cooling)/120 (Storage) litre | 60 (cooling)/120 (Storage) litre |
| 35 | 150 (cooling)/150 (Storage) litre | 150 (cooling)/150 (Storage) litre |