| 1 | (a) GTGs: 7K RoutinesDegutting of exhaust compensators & distance Piece, Remove both items. | (a) GTGs: 7K RoutinesDegutting of exhaust compensators & distance Piece, Remove both items. |
| 2 | Degutting and removing of intake diaphragm, Intake top and middle piece. | Degutting and removing of intake diaphragm, Intake top and middle piece. |
| 3 | Degutting of LO systems pipelines and Fuel System. | Degutting of LO systems pipelines and Fuel System. |
| 4 | Fixing of all chain blocks as per drawings provided by user manager. Fix special lifting appliance. | Fixing of all chain blocks as per drawings provided by user manager. Fix special lifting appliance. |
| 5 | Shipping out of turbines, stages and guide vanes. | Shipping out of turbines, stages and guide vanes. |
| 6 | Cleaning of exhaust ducts, turbine bearing housing, first stage guide vane, diffuser, pressure duct drum, stator (top and bottom), turbo compressor rotor and intake (middle and bottom). | Cleaning of exhaust ducts, turbine bearing housing, first stage guide vane, diffuser, pressure duct drum, stator (top and bottom), turbo compressor rotor and intake (middle and bottom). |
| 7 | Non- destructive testing (DPT) of all components. | Non- destructive testing (DPT) of all components. |
| 8 | Shipping in of turbines, stages and guide vanes. | Shipping in of turbines, stages and guide vanes. |
| 9 | Regutting of LO systems pipelines and Fuel System. | Regutting of LO systems pipelines and Fuel System. |
| 10 | Regutting of exhaust compensators & distance Piece, Remove both items. | Regutting of exhaust compensators & distance Piece, Remove both items. |
| 11 | Regutting and installation of intake diaphragm, Intake top and middle piece. | Regutting and installation of intake diaphragm, Intake top and middle piece. |
| 12 | Removal of all chain blocks and lifting appliances installed post boxing up. | Removal of all chain blocks and lifting appliances installed post boxing up. |
| 13 | (b) RGs: 14K RoutinesFixing of all chain blocks as per drawings provided by user manager. Fix special lifting appliance. | (b) RGs: 14K RoutinesFixing of all chain blocks as per drawings provided by user manager. Fix special lifting appliance. |
| 14 | Degutting of LO systems pipelines and Fuel System. | Degutting of LO systems pipelines and Fuel System. |
| 15 | Shipping out of planetary gears. | Shipping out of planetary gears. |
| 16 | Shipping out of 12 in nos. auxillary gears. | Shipping out of 12 in nos. auxillary gears. |
| 17 | Removal of breather pipe, lub oil system pipelines and fuel system pipelines. | Removal of breather pipe, lub oil system pipelines and fuel system pipelines. |
| 18 | Cleaning of top, bottom and middle cover. | Cleaning of top, bottom and middle cover. |
| 19 | Cleaning of all gear components. | Cleaning of all gear components. |
| 20 | Non-destructive testing (DPT) of all components and cleaning of all gear components. | Non-destructive testing (DPT) of all components and cleaning of all gear components. |
| 21 | Shipping in of planetary gears. | Shipping in of planetary gears. |
| 22 | Shipping in of 12 in nos. auxillary gears. | Shipping in of 12 in nos. auxillary gears. |
| 23 | Regutting of LO systems pipelines and Fuel System | Regutting of LO systems pipelines and Fuel System |
| 24 | Removal of all chain blocks and lifting appliances installed post boxing up. | Removal of all chain blocks and lifting appliances installed post boxing up. |