| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: SE EDC, Chandauli, PuVVNL, Varanasi. Name of Work : Work regarding the capacity augmentation of 11/0.4 kV distribution transformers of various capacities under the \\"Business Plan 2026-27,\\" within the jurisdiction of the EDD-Ist, Chandauli. (on Semi Turn-key basis). Tender No.: 11/EDC(C)/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Details Item Code / Make Qty. Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder (Including GST) Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (Including GST) Rs. P TOTAL AMOUNT(Including GST) Rs. P. (col.4 X col.13) TOTAL AMOUNT (Including GST)In Words |
| 2 | Centralised Materials- A |
| 3 | PCC Pole 8.5 mtr long |
| 4 | LT AB Cable (3X50+1x35+1x16) SQMM |
| 5 | LT AB Cable (3X120+1X95+1X16) SQMM |
| 6 | LT XLPE Caable 3.5X70 sqmm |
| 7 | LT XLPE Cable 1X400 sqmm |
| 8 | ACSR Weasel Conductor |
| 9 | MS Dropper Angle 100X50X2028 mm |
| 10 | MS Top Channel |
| 11 | SS Base Angle |
| 12 | 11KV V-Type Cross Arm |
| 13 | MS T-Off Channel |
| 14 | Stay Set Complete |
| 15 | Stay Wire |
| 16 | Earthing Complete |
| 17 | GI Wire 4MM 8SWG (for Earthing) |
| 18 | 11 KV Pin Insulator Polymer with Nut |
| 19 | 11 KV Disc Insulator with fitting |
| 20 | 3 Phase Distribution Box |
| 21 | 11/0.4 KV T/F 25 KVA |
| 22 | 11/0.4 KV T/F 250 KVA |
| 23 | Decentralized Materials- B |
| 24 | Stone Pad |
| 25 | Al Lug 35 SQMM for HT |
| 26 | Al Lug 40 SQMM for HT |
| 27 | Al Lug 50 SQMM for HT |
| 28 | Al Lug 70 SQMM |
| 29 | Al Lug 1X400 SQMM |
| 30 | Copper L-Piece 62X225X12 |
| 31 | PG Clamp |
| 32 | LT Protection Fuse Unit |
| 33 | Holding Clamp for TOP Channel TPMO & Fuse Set etc. |
| 34 | Clamp for T/F DP/T-Off |
| 35 | Clamp for Stay |
| 36 | LT Clamp |
| 37 | F-Bracket 11 KV |
| 38 | Suspension Clamp with I-Hook |
| 39 | Dead End Clamp |
| 40 | Eye Hook |
| 41 | J-Hook |
| 42 | Clamp for Channel |
| 43 | Cross Arm Holding Clamp |
| 44 | 3 Phase Distribution Box Clamp |
| 45 | LT Pearcing Connector |
| 46 | 11KV Danger Board |
| 47 | Nut & Bolt |
| 48 | Tailless Unit for LT Protection Double Cirtuit |
| 49 | Labour & Maintainance charges - C |
| 50 | Work of Carriage of 8.5 mtr. PCC pole with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 51 | Work of Erection of Single Pole / Double Pole with 8.5 mtr. PCC with digging & Fitting of fixtures with accessories (Droper Angle, Top Channel, T-Off , V-Cross, Base, Stone Pad, Holding Clamp, F-Bracket, Nut & Bolts, Danger Board etc.) as per RESSPO standard. |
| 52 | Work of Carriage & Erection of ACSR Weasel Conductor Conductor with all accessories (Disc Insulator, Pin Insulator, Lug, PG Clamp etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 53 | Work of Carriage & Erection of Earthing Complete with loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 54 | Work of Carriage & Erection of Stay Complete with loading & unloading as per RESSPO standard. |
| 55 | Work of Carriage & Erection of LT AB Cable (3x50+1x35+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box with Clamp, Dead End Clamp with I/J-Hook, LT Pearcing Connector, DB Clamp, Nuts & Bolts etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 56 | Work of Carriage & Erection of LT AB Cable (3x120+1x95+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box with Clamp, Dead End Clamp with I/J-Hook, LT Pearcing Connector, DB Clamp, Nuts & Bolts etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 57 | Work of Carriage & Laying by Open air method of LT XLPE Cable 3.5x70 sqmm (with Crimping Lug, Connecting Lead, LT Fuse Set) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 58 | Work of Carriage & Laying by Open air method of LT XLPE Cable 1x400 sqmm (with Crimping Lug) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 59 | Work of Carriage & Mounting of 25 KVA transformer from store centre Sahupuri/Rajatalab to work site and Energizing after installation as per RESSPO standard. |
| 60 | Work of Carriage & installation on Plinth of 250 KVA transformer from store centre Sahupuri/Rajatalab to work site and Energizing with all Accessories (Z Clamp, Copper L-Piece) as per RESSPO standard. |
| 61 | Work of Construction of Wire mesh fencing with 1 door for distribution T/F including Grounting of foot & Proper fixingg as per RESSPO standard (fencing size-8x7x6) of T/f of supply of material. |
| 62 | Special Earthing of 250 KVA T/F Nutural and Body Seperately Chemical Pipe, 30Feet Deep & connection with GI Strip of size 30x5mm including cost of material all required material shall be supplied by the contractor. |
| 63 | Work of Construction of Plinth of 250 KVA TF (2X2X1.5M) including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 64 | Work of Erection of Henley Type Tailless Fuse Unit 300 Amp, 650 Volt (Two Circuit) (Complete set as per technical specification & drawing) Suitable up to 250 KVA / 400KVA Distribution Transformer as per RESSPO standard. |
| 65 | Work of Stay Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 66 | Work of Pole Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 67 | Work of Dismantling & Carriage Charges of old & used 10 KVA T/F form Site to store centre Sahupuri/Rajatalab. |
| 68 | Work of Dismantling & Carriage Charges of old & used 16 KVA T/F form Site to store centre Sahupuri/Rajatalab. |
| 69 | Work of Dismantling & Carriage Charges of old & used 100 KVA T/F form Site to store centre Sahupuri/Rajatalab. Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |