| 1 | Earthwork in excavation to the proper level and grade including light dressing and stacking of serviceable stone as directed and removal of spoils upto 30m and all lifted |
| 2 | Loose boulder above one man size or soil mixed with boulder above one man size or soft shale. |
| 3 | Providing 100mm thick soling with approved quality of stones including local carriage of stones including ramming, consolidation and filling the interstices with stone aggregates all complete. |
| 4 | Providing and laying c.c. work in proportion 1:3:6 corresponding M15 with hard stone or river shingles aggregate at 20mm down graded including curing and sand within 200mtrs (excluding shuttering reinforcement) complete. (Materials procured by the Contractor) |
| 5 | Providing and laying cement concrete in prop 1:2:4 corresponding to M15 with very hard stone or river shingles aggregate of 20mm down graded including carriage of stone & sand within a distance of 20mtrs (excluding shuttering and reinforcement) and curing. (Materials procured by the Contractor) |
| 6 | Providing and laying cement concrete in proportion 1:1½:3 corresponding to M20 with very hard stone or river shingles aggregate of 20mm down graded including carriage of stone and sand within 200mtrs (excluding shuttering and reinforcement) and curing complete.(Materials procured by the Contractor) |
| 7 | Supplying, fitting, fixing including binding, cranking to the design Tor Steel reinforcement including supply of tying wire 20g complete as directed. |
| 8 | Providing shuttering with dressed planks not less than 25m thick properly joined including batten props to the proper level and removing the same after the concrete hardens and removing the same after the concrete hardens as directed |
| 9 | Providing cement plaster including clearing the surface and curing complete.12mm thick Prop 1:2 (Materials procured by the Contractor) |
| 10 | Extra carriage of earth, sand, stone aggregates, stone chips and building stones beyond the initial lead of 200m including loading and unloading. |
| 11 | For 1st km or part thereof. 24Km |
| 12 | Subsequent km or part thereof 24Km |
| 13 | Sand filling in trenches and in plinth in 20cm layers each including ramming watering consolidation complete as directed. |
| 14 | Construction of Sluice valve chamber with 25cm thick stone wall in prop 1:4 cement mortar for sluice valve with 6mm thick M.S. Plate cover with hinges and locking arrangement including earthwork in excavation for foundation in prop 1:3:6 and 12mm thick cement plaster inside the chamber in prop 1:3 finished with neat cement all complete as per drawing and direction. For 200mm dia. upto 300mm dia. sluice valve dimension 1.00m x1.00m x 1.00m.(Materials procured by the Contractor.) |
| 15 | Supply and laying in trenches including carriage within 8km of ISI marked centrifugal cast (spun) ductile iron pipe with socket and spigot end conforming to IS 829/2000 in standard length of 4.00m to 6.00m suitable for push on joint (rubber gasket D.Join) complete as directed. (Excluding carriage of materials from manufacturing to Divisional Store) (K-7). |
| 16 | 150mm dia. |
| 17 | 300mm dia. |
| 18 | Add 20% DI Fittings on Item No 12. |
| 19 | Supply, fitting, fixing in position CI D/F sluice valve with top cap and hand wheel upto 10Kg per sq.cm pressure including supplying of nuts, bolts, rubber insertion sheet washer etc. and carriage within a distance of 8km and all other jointing materials etc. complete as directed. |
| 20 | 300mm |
| 21 | 150mm |
| 22 | CI Man hole cover |
| 23 | Providing MS ladder on the inside and outside |
| 24 | Painting Please Enable Macros to View BoQ information |