| Sl. No. | Item Description |
| 1 | General Services & Docking (DECK SIDE DEFECT) |
| 2 | Cost of Dry Dock Charge: NOTE: 1) The firm shall quote the no. of days requiring at Dry Dock for repairs 2) The amount for Dry Dock related charges shall be paid by PPA directly to M/s. Sadhav Offshore. 3) The Dry Dock charges will be considered for financial evaluation purpose only for this tender. 4) If the Firm take more days at dry dock than quoted days then the applicable dry dock charges for the additional days shall be recovered from the firm. |
| 3 | Ship's Hull under water portion, bilge keel to be scrapped the marine growth and to be grit blast the entire under water portion up to main deck make completely rust free and show the bare surface after taking all precautions for inspection of IRS surveyor. |
| 4 | To paint under water area with 6 coats of epoxy paint by airless spray (2 coats primer + 2 coats sealer + 2 coats anti-fouling), paint PPA supply. |
| 5 | The hull portion above water level, main deck to be thoroughly grit blasted & power cleaned to make completely rust free and free of all foreign/loose materials after taking all precautions. |
| 6 | The above water level area to be painted with 4 coats of epoxy paint by airless spray(2 coats primer + 2 coats of finish paint), paint PPA Supply. |
| 7 | Draft marks, L.L. marks and 'TUGS' name to be painted with enamel white paint, paint PPA supply. |
| 8 | Both anchor and chain have to be lowered, scrapped and grit blasted to SA 2.5. All the joining shackles (4 nos. each side) are to be opened and overhauled. The chain to be calibrated and to submit the report for survey by IRS surveyor. Both anchor and chains to be painted with 2 coats of epoxy paint by airless spray. After finishing the paint work, connect the joining shackle and mark with white/red paint and seizing wire. Hoist both anchors in position and secure properly . paint PPA supply. |
| 9 | Both chain lockers to be power cleaned, chipped, scrapped and painted with 4 coats of epoxy paint(2coats primer + 2 coats black epoxy). Paint PPA supply . |
| 10 | Existing zinc anodes (10kgs.) in the underwater area are to be removed and fitted back with new anodes. MAKE SARGAM WITH TEST CERTIFICATE. |
| 11 | Storm valves to be removed, overhauled and shown to the IRS surveyor and fitted back in place. To quote including the cost of SS nuts, bolts and gasket. |
| 12 | 1 No. FPK ballast tank, 04 Nos. fresh water tanks, 01 No void space (forward) & 02 Nos. cofferdams (aft) as per the attached tank list in the tender documents are to be thoroughly cleaned, chipped and painted with 2 coats of epoxy paints by air less spray(1 coat primer + 1 coat finish ). To remove all the manhole covers and fit back with handle, new packing, stainless steel nuts and studs/bolts. paint PPA supply . To quote including cost materials. |
| 13 | To quote for removal and fitting of bottom plugs for various tanks. Plugs are to covered with m-seal after fitting . To quote including cost of materials. |
| 14 | Wooden fender are to removed and fitted back with SS nuts , bolts & 3mm thick washers after blasting & painting of the steel plates with 2 coats of epoxy paint(1 coat primer + 1 coat finish ). Paint PPA supply . To quote including cost materials. |
| 15 | Damaged wooden fenders are to be removed and replaced with properly dressed new good quality equivalent size of seasoned 'SAL' wood (Breadth: 300mm * Height: 300mm) with new GI nuts ,bolts & 3mm thick washer after blasting & painting of the steel plates with 02 coats of epoxy paint (1 coat primer + 1 coat finish paint). Paint PPA supply . To quote including cost of materials. |
| 16 | Ultrasonic thickness gauging of hull/deck plating to be carried out as required by the IRS surveyor through the class approve workshop. |
| 17 | Crew accommodation blower closing and opening spindle to be freed, overhauled and tried out . Water tight rubber packing to be renewed as per sample and shown to the master. To quote including cost of materials. |
| 18 | Accommodation blower trunking bellow to be renewed as per sample. |
| 19 | 02 nos towing hooks (45 T bollard pull) along with pneumatic release system to be opened up and thoroughly overhauled with repairing/built up and machining of all the pins and bore to required clearance and with required spares as directed by master. satisfactory remote/local operation to be shown to the master. To quote including cost of materials. |
| 20 | To renew/replace bath room taps/cock.(3nos in crew bath room and 2nos in galley) (ISI make). To quote including cost of materials. |
| 21 | Wash basin Tap(jaquar make) and connection pipe along with basin drain water pipe damaged to be renewed . Wash basin Tap(ISI make) |
| 22 | Supply and fit latrine commode in Chief engineer & Master cabin and overhaul flushing system. To quote including cost of material. (With combined water storage tank Flush ISI Make). |
| 23 | Masters and chief engineer cabin toilet door, crew toilet door & mess room door handle locks are to be renewed as per sample . To quote including cost of materials. |
| 24 | Cost of steel renewal. Steel platings along with frames, beams, brackets and all the required fittings shall be renewed as required at the following loactions as per IRS Construction Rules(a) Hull plating (under water & above water)(b) Main deck platings.(c) Under Deck Bulk Heads.(d) Sea Chest Platings.(e) Skeg, Bilges and Rudder.(f) Fender Holding Plates.(g) Frames and stiffiners inside(h) 02 nos schuttle covers to be opened & steel renewal to be done as require.(i) Any other steel structure as required by PPA.(j) Engine room floor plates securing angles, stair case, man hole covers etc.(k) Christmas Tree lights baseFirm to Quote above steel renewal including cost of Steel per Ton basis. M.S Plate to be Marine Grade, Steel only with test certificate. (12mm/10mm/8mm/6 mm thickness will be used for renewal of plating and structures IS 2062) IS 2062 E350BR. All supporting documents related to Steel to be submitted in Original before commencement of steel work. IACS approved welding rod to be used for all steel work. MS steel plate test certificate to be provded along with supplied steel (confirming to BIS Standards). |
| 25 | All the oil tanks (F.O tanks 02 nos ,F.O.D.S tanks 02nos, L.O tanks, hydraulic tank, Dirty oil tank and sludge tank) as per the attached tank list in the tender documents are to be thoroughly cleaned, gas freed and to be shown to the IRS surveyor . Total 08nos . After completion of survey work, the manhole cover to be boxed back with new joints, stainless steel studs/nuts/bolts. To quote including cost of materials. |
| 26 | Polishing of wooden furniture are to be carried out with teak polish and sprayed with PU paint (Asian paint/Dulux). To quote including cost of materials. |
| 27 | Wash basin tap, galley sink taps(ISI make) & hose are to be renewed as per sample(ISI make). |
| 28 | Fire hydrant valves (N.B 65 mm) are to be cleaned, overhauled and tested at 5 kg/sq.cm shown to master . Valves are to be painted and fitted back in place with new joints, bolts & nuts . To quote including cost of materials. |
| 29 | Fire line relief valve to be overhauled and relief pr. Adjusted at 10 kg. per Sq. Cm and certificate to issue. |
| 30 | Securing GI U-clamps with nuts of pipelines to be as per sample. |
| 31 | Fire hose box to be supplied and fitted with locking arrangement 600*500*200 mm : FRP (DG/IRS approved) |
| 32 | To repair and overhaul the hand pump of chain locker, void space & cofferdam with renewal of worn out spares, gasket, nut and bolts and trial to be shown to the IRS surveyor. To quote including cost of materials. |
| 33 | A sample of foam chemical from the foam tank is to be laboratory tested for its potency. |
| 34 | To remove old rubber packing of following water tight doors etc, de-rust and clean the packing channel, paint with 2 coats of each primer & finish paint then put the new rubber packing of the following water tight doors, hatches, port holes etc and pressure testing to be carried out & shown to the surveyor. (DG/IRS/ISI) make. |
| 35 | Water tight doors |
| 36 | Emergency booby hatch cover |
| 37 | Rope store booby hatch cover |
| 38 | Engine Room blower cover |
| 39 | Crew accommodation blower cover |
| 40 | Exhaust Blower Cover |
| 41 | Circular Porthole, Dia - 300mm to be removed and repaired with new rubber gasket, To quote including cost of materials. (DG/IRS/ISI) make. |
| 42 | Porthole Deadlight cover |
| 43 | Air vent pipe head to removed and non return valve to overhaul for all the tanks and satisfactory operation of valve to be shown to the master . New flame arrester SS wire mesh to be fitted . To quote including cost of materials. (Materials ISI/IRS approved). |
| 44 | Wheel house, master's cabin, Engineers cabin, crew accommodation, crew mess, officers mess, galley & alleyway Linoleum flooring mats are to be renewed with 3mm thickness linoleum flooring mats. To quote including cost of materials. (Antiskid/ISI make). |
| 45 | To supply And fit old pay loader/ Aeroplane tyres at stern along with holding plates (10mm thick), nuts/bolts, shackle & chains as per sample . To quote including cost of materials. Size:52,R22,36PR |
| 46 | To supply And fit Aero tyres fenders and to be fitted with holding plates (10mm thick), nuts/bolts, shackle & chains as per sample . To quote including cost of materials. Size:26,24-32PR. |
| 47 | Main deck bollards to be fabricated and fitted in place. Height- 550mm, Dia- 300mm, mat- SH 80 pipe, with 16mm thick plate, bollard are to be filled with concrete. To quote including cost of materials. |
| 48 | Main cabin door Godrej locking system with key to renewed with new Godrej locks. To quote including cost of materials. |
| 49 | To supply Following paints From OEM or its Authorised Dealers OF AkzoNobel paints (International brand) |
| 50 | Pen guard Epoxy primer |
| 51 | Intershild 300 Anti corrosive |
| 52 | Safeguard universal ES tie coat |
| 53 | Sea quantum ultra antifouling (Dark Red) |
| 54 | Top coat epoxy Green |
| 55 | Top coat epoxy White |
| 56 | Top coat epoxy Grey |
| 57 | Epoxy thinner |
| 58 | Anti fouling Thinner |
| 59 | Epoxy Black |
| 60 | All the 37 nos. hole type rubber fenders on the stern and both side of bow are to be opened out, inside plate to be checked for any dent or deformation . The entire area to be thoroughly grit blasted and painted with 2 coats of epoxy paint by airless spray. All the fender holding pins are to be thoroughly checked. the bent pins are to be renewed. the fenders are to be fitted back in place. in case of any damage to the fender found, same to be renewed with equivalent type rubber fender (size- 300mm*300mm*100mm key hole type rubber fender). fender area length at stern and bow is 10 Sq. Mtr . Paint PPA supply . To quote including cost of materials. |
| 61 | Both side tug's light name board fitted at the monkey island to renewed as per sample. |
| 62 | Pipe renewal at different places such as main deck, overhead sanitary lines/bilges/tanks for following size and fitted back with new joints, SS nuts & bolts. To quote including cost of materials (ISI make). |
| 63 | Upto 25 mm bore SCH-40 Seamless pipelines |
| 64 | Upto 25 mm bore SCH-80 Seamless pipelines |
| 65 | From 30 mm to 50 mm bore SCH-40 Seamless pipelines |
| 66 | From 30 mm to 50 mm bore SCH-80 Seamless pipelines |
| 67 | From 55 mm to 75 mm bore SCH-40 Seamless pipelines |
| 68 | From 55 mm to 75 mm bore SCH-80 Seamless pipelines |
| 69 | From 80mm to 100 mm bore ScH-40 Seamless pipelines |
| 70 | From 80mm to 100 mm bore ScH-80 Seamless pipelines |
| 71 | From 105mm to 150 mm bore ScH-40 Seamless pipelines |
| 72 | From 105mm to 150 mm bore ScH-80 Seamless pipelines |
| 73 | Following valves in the fire fighting system are to be opened, cleaned, overhauled and tested at pressure 5kg/sq.cm and to be fitted back with new SS nut, bolts & gaskets/ joints To quote including cost of materials (ISI make). |
| 74 | 150 MM NB |
| 75 | 150 MM NB |
| 76 | 080 MM NB |
| 77 | 040 MM NB |
| 78 | To overhaul 1 no. double acting Danton Emergency Hand Pump and shown to the master |
| 79 | Windlass gear box oil to be drained, oil sump to be cleaned and filled up with new gear oil, overhauling 7 load testing . |
| 80 | Capstan on the aft deck to be overhauled . Load Test Certificate to be issued by DGFASLI compliance. |
| 81 | 01 nos. teescopic monotor and 2nos jet monitors of fire fighting system to be overhauled with renewal of seals, o ring, pressure gauges and refitted with new rubber packing and nut, bolts. |
| 82 | Fire monitor system overhauling renewal of seals, o ring, pressure gauges (Jet Direction) |
| 83 | Wheel House Glass (Water Leakage) to be arrested to IRS approval. |
| 84 | Wheel House (Wiper) to be repaired with new wiper blade (3') Class approved (IACS). |
| 85 | Deck Washing and Cleaning (Tap & Pipe Damaged) to be renewed with GI fittings(ISI make). |
| 86 | Pantry renovation with fire proof Laminated Ply (ISI make) |
| 87 | DRY DOCKING DEFECT LIST OF ENGINE OF TUG TARINI (MECHANICAL REPAIRS) |
| 88 | The Vessel has to be supplied with 415Volts , 3-phase A.C. supply, 50 cycle/sec through the vessel’s shore connection box during the entire period of stay in the dry-dock. Initial & final readings are to be taken in presence of Engineer-in-charge. |
| 89 | Sea chest gratings including sea chest filters and housing are to be removed, cleaned thoroughly and painted with 03 coats of epoxy paints and fitted back. Gratings are to be cleaned, painted & fitted back in place with new S.S bolt & nuts. All the bolts are to be lashed with copper/ SS (316 grade wire) wires. New 10 kg Zinc anodes are to be fitted. Zinc anodes and paints PPA supply. Sea chest filters to be assembled back with new appropriate gaskets/ joints of 4mm. Purging cocks (Brass/ stainless steel) to be replaced. To quote lumpsum including the cost of materials and labour. |
| 90 | Sea water auxillary strainers to be removed, cleaned and fitted back. The strainer boxes to be cleaned, scrapped of any rust/ debris and painted with 03 coats of epoxy paints. Purging cocks (Brass/ stainless steel) to be replaced. To be assembled back with new appropriate GP gaskets/ joints of 4mm.To quote lumpsum including the cost of materials and labour. |
| 91 | Both Main Engine expansion tanks are to be cleaned, painted with two coats of epoxy paint. Gauge glasses of both the tanks along with the cocks and the drain valve to be renewed as per sample. Manhole door gaskets to be renewed with 4mm Champion make gasket.To quote lumpsum including the cost of materials and labour. |
| 92 | The following overboard, sea chest & intermediate sea water, foam & other systems, straight & angle valves are to be removed, cleaned, overhauled and pressure Tested at 5 Kg/cm2 and shown to Engineer-in-charge and IRS Surveyor. The valves are to be painted with 2 coats of epoxy paint and fitted back in place with new joints, SS nuts and bolts. Paint PPA supply. To quote lumpsum including the cost of materials and labour. |
| 93 | SDNR valve 250 NB |
| 94 | Butterfly valve 250 NB |
| 95 | Butterfly valve 200 NB |
| 96 | SDNR 150 NB |
| 97 | SDNR & stop valves 125 NB |
| 98 | SDNR & stop valves100 NB |
| 99 | Butterfly 100 NB |
| 100 | SDNR & stop valves 80 NB |
| 101 | SDNR & stop valves 65 NB |
| 102 | SDNR & stop valves 50 NB |
| 103 | SDNR & stop valves 40 NB |
| 104 | SDNR & stop valves 32 NB |
| 105 | SDNR & stop valves 25 NB |
| 106 | Following pipe lines in Engine room are to be renewed with schedule 40 seamless pipes in presence of ship staff. Flanges are to be welded on both sides of pipes. The pipelines are to be painted and fitted back with new joints, stainless steel nuts & bolts, U-clamps & support to be renewed wherever required. To quote lumpsum including the cost of materials and labour. |
| 107 | 105 to 150 mm bore |
| 108 | 80 to 100 mm bore |
| 109 | 55 to 75 mm bore |
| 110 | 30 to 50 mm bore |
| 111 | 17 to 25 mm bore |
| 112 | Upto 15 mm bore |
| 113 | 150 mm bore tapered short piece with flange, distance between the flanges approximately 150-200mm to be renewed for plate cooler. |
| 114 | 100 mm bore tapered short piece with flange, distance between the flanges approximately 150-200mm to be renewed for plate cooler. |
| 115 | 150 mm bore short piece with flange, distance between the flanges approximately 150-200 mm to be renewed for fire pump discharge line. |
| 116 | To replace the existing mild steel pipeline for both STBD & PORT SRP coolers with 25 NB schedule 40, seamless stainless steel (304) pipeline. with SS flanges (approx 50nos.) & SS nuts and bolts. To quote lumpsum including the cost of materials and labour. |
| 117 | Quick closing valves, 32 NB - 4 nos & 40 NB - 3 Nos, Total 7 Nos are to be removed, overhauled, pressure tested and shown to the Engineer-in charge & the Surveyor. Then valves are to be painted with 02 coats of epoxy paints before fitting back with new joints, SS Nuts and Bolts. To quote lumpsum including the cost of materials and labour. |
| 118 | The engine room floor plates, casing, bulkhead, bilges, frames, beams & girders, engine body and foundations of other machineries are to be thoroughly cleaned, scrapped, de-rusted & painted with one coat of primer & one coat of enamel /epoxy paints by airless spray. Drain holes of bilge frame are to be cleared for easy passage of bilge water into bilge well. Floor plates are to be removed from place to yard and sand blasted & secured with counter sunk screws. PAINT PPA SUPPLY |
| 119 | The combined Alarm Monitoring Panel for both the Main Engines are to be repaired/ replacedType- MEACOS 3000, SL.NO-1850/01/19158 MAKE- MARINE ELECTRICAL PVT.LTD, YEAR OF MANUFACTURE-2010Safety devices along with their display units & alarm system for both the Main Engines are to be made operatoinal through authorised service providers of either ComAp, Marine Electricals Pvt. Ltd or any other renowned firms.The enlisted components needs to be renewed/ replaced to make the display units & alarm system operational.1. IM 1010M 1 pc2. PLC Extension for IM-1010M 1 pc3. Modbus Client for IM 1010 1 pc4. Inteli AIN-8 9 pcs5. Inteli IO-8-8 3 pcs6. EMBIO8 2 pcs7. IV-1050 Marine 1 pc8. Vertical Chanel for I/O Card 1 Lot9. Single Change Over Relay (Slim Type) 18 pcs10. Oring Diode 30 + 30 Amp 1 pc11. SMPS 20 Amp 1 pc12. Terminal (Double Dacker) 1 Lot 13. MCB DP 7 pcs14. Fuse 1 Lot15. Fuse 1 pc16. Filter 2 pcs17. Light AC-230V 1 pc18. Wire 1 Lot |
| 120 | STEP-UP GEAR BOX coupled to Port Main Engine Make - Kumera AS, NorwayType - Norgear 2F GC - 2265Sl.No - N94810Gear oil to be drained & inside to be cleaned thoroughly. All pressure gauges & temperature gauges to be renewed as per sample. Oil sump to be flushed & filled with fresh gear oil. Flexible hoses to be renewed as per sample. L.O to be supplied by PPA. To quote lumpsum including the cost of materials and labour. |
| 121 | MAIN ENGINESMake: Wartsila NSD, Type: 8L20, Capacity: 1600 kw, RPM-1000. All units of both the Main Engines (i.e; 16 nos) along with their attachments shall be dismantled completely for decarbonization after removing all the necessary connections & sensors. All cylinder heads along with its mountings are to be overhauled & cylinder head to be pressure tested to 5 kgf/cm2. All pistons, connecting rods & other parts are to be removed, cleaned, calibrated and presented for survey. After completion of survey engine to be boxed back to the satisfaction of IRS surveyor & Engineer-in-charge and trials to be shown. All safety devices to be checked for correct functioning. List of attachments for dismounting, cleaning, overhauling & pressure testing.(i) Charge air cooler - 01 no (ii) Lub Oil Coolers - 01 no(iii) Plate cooler - 01 no(iv) Fuel injectors - 08 nos (v) Centrifuge filters - 01 no (vi) Cooling Sea water pumps - 01 no(vii) Cooling fresh water pumps - 01 no(viii) Governors - 01 no (oil to be renewed) (ix) Fuel oil cooler - 01no (x) Engine mounted fuel oil pump - 01 no (xi) Lube oil primming pump - 01no(a) Main bearings of one unit of each engine are to be removed for inspection and survey.(b) Cylinder liner of one unit of both engines are to be removed & cleaned. Cooling water space to be cleaned throughly & pressented to the surveyor, thereafter to be fitted back. (c) Lub oil filter to be dismounted, dismantalled cleaned and filter cartridge to be renewed. (d) Sump oil to be drained, cleaned and shown to the Engineer-in-charge and replenished with fresh oil @ 600 ltrs in each Main Engine. Oil to be supplied by PPA. Spare parts to be supplied by PPA.Lube oil and spares to be supplied by PPA. The entire work on the Main Engines to be carried out by reputed Marine Worshop (Experience in above /similar type engine overhauling jobs) Quote Lumpsum including Service Engineer's charges and labour cost. |
| 122 | ABB Turbocharger for Main Engines: Model TPS57- F32Turbochargers along with their attachments shall be dismantled completely for decarbonization and overhaul after removing all the necessary connections & sensors. Turbocharger rotor to be dynamically balanced and turbocharger to be fitted back on the Engines & trails to be shown to the Engineer-in-charge. The entire work of the Turbocharger is to be carried out under the supervision of Authorised Service Engineer of OEM. Spares to be supplied by PPA. Quote Lumpsum including Service Engineer's charges and labour cost. |
| 123 | Shore supply box to be renewed with a fibreglass box of existing dimension of 660mm x 550mm x 280mm & fitted in place. To quote lumpsum including the cost of materials and labour. |
| 124 | Auxillary Engine - for Power Generation Make-Kirloskar oil engine Ltd. Type- 6R1080T, Rating-93Kw, RPM-1500 Application No-6H3511All 03 Generators to be completely overhaulled with original Kirloskar spares to be procured from Authorised service provider. Attachments as enlisted below are to be dismantalled, cleaned, overhaulled & pressure tested and shown to Engineer-in-charge and the IRS Surveyor. After completion of survey engines are to be boxed back and satisfactory trials to be shown including trail of safety cut-outs. Fuel pumps, Governors, injectors shall have to be serviced through OEM authorised workshop/ dealers All safety devices to be made operatoinal along with their display units & alarm system. Following attachments are to be dismantled, cleaned and overhauled, (a) Sea water pump (b) Heat Exchanger/ cooler (c) Fresh water pump (d) Radiator unit (e) Turbocharger (f) Fuel oil pump (g) All the belts to be renewed (h) Fuel oil filter box to be cleaned & filters renewed. (i) Lub oil from sump to be drained, Lube oil filters to be renewed and fresh oil to be filled up. Lube oil to be supplied by PPA. To quote lumpsum including the cost of materials and labour. |
| 125 | Auxillary Engine: Make-Kirloskar Oil Engine Ltd. Type- 6R1080T, Rating-93Kw, RPM-1500Safety devices along with their display units & alarm system for all the 03 (three) Generators to be made operatoinal. Following components that needs to be made functional are enlisted below in order to make the display units & alarm system operational.1. KG645 Controller unit (SP-3 Hardware 12v)2. Connector assembly for control panel with KG645 unit.3. Relay board 2 & 1/2, 12 v DC4. Selector switch5. Emergency push stop button6. Lube oil pressure sensor7. Load lamp8. Engine wiring harness SF KG545 unit with electronic governor and 4-20 MA LOP transmitter9. Panel assessories10. C T Coil11. Control panel assembly for 6K Electronic Governor with KG 645 control panel board.To quote lumpsum including the cost of materials and labour. |
| 126 | The Main Air Compressor as detailed below to be removed from place and replaced with equivalent Main Air Compressor of similar rating along with the new starting panels. The Main air compressor should be IR Class approved for Marine use of make such as Elgi, Atlas Copco et al.Main Air Compressor as fitted on-board Tug Tarini now,Make: Sperre Industri AS N-6057, ELLINGSOY NORWAY,Capacity: 25 m3 at 30 bar, POWER-6.2 KWThe new Main Air Compressors have to be fitted in place and made operational along with what ever necessary modifications required such as foundation. valves, pipelines, brackets, U-clamps and any other connections and trails to be shown to the Engineer-in-charge.To quote lumpsum including the cost of materials and labour. |
| 127 | Drinking water & sanitary Hydrophore tanks (capacity: 250 litres)Inspection covers are to be opened, internal surfaces to be cleaned thoroughly and painted with two coats of Epoxy paint. Gauge glasses and the cocks (inlet/ outlet and drain) are to be renewed with brass cocks as per the sample.New pressure switch of Danfoss make to be supplied and Auto Cot-off and Cut-in pressure to be readjusted. Manhole door gaskets to be renewed with 4mm Champion make gasket.Relief valves and blow-off valves are to be overhauled & opening pressure to be checked & readjusted. All the tests & trails to be shown to the Engineer-in charge.To quote lumpsum including the cost of materials and labour. |
| 128 | Manhole doors of 3 nos air receivers (Two Main Air Receivers and 01 Sevice Air Receiver) are to be opened, cleaned & inspected and shown to Engineer-in-charge, same to be boxed back with proper taflon seat/ gaskets/ joints to the satisfaction of Engineer-in-charge. All the mountings such as valves and safety devices are to be overhauled and safety valves to be pressure tested at 10% more than working pressure in the presence of Engineer-in-charge and certificate to be issued. Drain valves of approved quality to be fitted in the air receiver where it is missing or not in good condition.i) Main Air Receiver, Capacity-250 Ltrs at 30 kg/sq.cmii) Service Air Receiver, Capacity- 125 Ltrs at 20 kg/sq.cmTo quote lumpsum including the cost of materials and labour. |
| 129 | Following pressure gauges, thermometers & meters are to be calibrated from the Authorised NABL Laboratory & certificates to be issued. Incase of any defective one found, same to be replaced with new ones along with the certificate. Pressure gauges copper pipng wherever damged/ defective is required to be renewed with new pipes and fittings. To quote including cost of materials. Supply new pressure gauges with test certificate. |
| 130 | PRESSURE GAUGES are to be renewed with Test Certificates |
| 131 | 0-70 kg/cm2 |
| 132 | 0-7kg/cm2 (oil filled) |
| 133 | 0-7kg/cm2 |
| 134 | 0-4.2kg/cm2 (Oil filled gauge) |
| 135 | 0-10.6 kg/cm2 |
| 136 | 0-25 kg/cm2 (Oil filled gauge)100 mm dial |
| 137 | 0-42 kg/cm2 (Oil filled gauge) |
| 138 | TEMPERATURE GAUGES are to be renewed with Test Certificates |
| 139 | 0 - 200 deg C |
| 140 | 0 - 600 deg C |
| 141 | Temperature gauge 40-120 deg C (for oil system) |
| 142 | METERS Renewed with digital meters with test certificates. |
| 143 | Ammeter 0-30A |
| 144 | Voltmeter 0-50V |
| 145 | DC Ammeter 0-50A |
| 146 | THERMOMETERS TO BE RENEWED AS PER THE SAMPLE SUPPORTED BY CERTIFICATE |
| 147 | 0-130C |
| 148 | 0-100C |
| 149 | Following instruments & sensors are to be checked & calibrated from authorized agent for their accuracy & certificate to be issued. |
| 150 | Volt Meter: to be renewed with digital meters |
| 151 | Ranges: 0-50v |
| 152 | Ammeter |
| 153 | Ranges: 0-200 Amps |
| 154 | Kilowatt Meter: |
| 155 | Ranges: 0-120 kw |
| 156 | The following tanks manhole doors covers to be opened, gas freed, contents to be transferred, internally clean the tanks and shown to Engineer-in-charge and fit back after survey with new gaskets (GP gaskets 4 mm thickness) and renewal of damaged nuts and studs with stainless steel ones. Fuel oil storage tank, 27.86 cu mtr, 02 nos Fuel oil daily service tank, 2.45 cu mtr, 02 nos Dirty oil tank, 0.89 cu mtr, 01 no Leak off tank along with drain pipe from Main Engine, 0.5 cu mtr, 01 no Foam tank 5.98 cu mtr, 01 noHyd.oil tank 0.73 cu mtr, 01 noLub oil tank 5.98 cu mtr, 01 noTo quote lumpsum including the cost of materials and labour. |
| 157 | The following pumps are to be removed from its foundation & dismantled. All the parts to be cleaned and calibrated, overhauled with new bearings (SKF/ FAG/ NSK / NTN) to be assembled back and fitted in place and trials to be shown to Engineer-in-charge. To quote lumpsum including the cost of materials and labour.Bilge pump & G. S. Pump, 2-stage centrifugal pump, Make-BE pump, Capacity-30 cu.mtr /hr.Model-A7-130-kk-TE-3, RPM-1450. |
| 158 | Drinking & Sanitary Hyrophore Pump, Centrifugal type, Make: BE pumps, Capacity: 3 cu.m/hr |
| 159 | ME Standby Cooling Pump, centrifugal pump, Make- AZCUE, Type-LN50-125, Capacity-71 cu.m/hrs |
| 160 | M/E (P) driven fire Pump & Engine driven pump, Make- Allie Centrifugal Pump , Model -150 DF, Capacity-500 cu. m/hr @150 mwc @1800 RPM. Pump cover to be opened, all the parts to be cleaned, calibrated, overhauled with new bearing/sleeves (SKF/ FAG/ NSK / NTN) and presented for inspection and survey. After completion of survey, pump covers to be boxed back with new gaskets, gland packings, SS nuts & bolts and satisfactory trial to be shown to the Engineer-in-charge.To quote lumpsum including the cost of materials and labour. |
| 161 | To supply and fit the following AC's at their appropriate places,One no. 1.0 Ton split AC for Chief Engineer’s cabin,One no. 1.0 Ton AC for Master's cabin, Make: Daikin, Hitachi, O-General to be installed with new copper pipes in place of the existing one.To quote lumpsum including the cost of materials and labour. |
| 162 | To supply and fit the following AC's at their appropriate places,One no. 1.5 Ton AC for ECR,Two nos 1.5 Ton ACs for the Wheel House,Make: Daikin, Hitachi, O-General to be installed with new copper pipes in place of the existing one.To quote lumpsum including the cost of materials and labour. |
| 163 | Windlass & CapstanGear box oil is to be drained and the covers are to be opened. Gears, bearings, seals & brake shoe lining/ brake drum/ brake shaft, limit switches conditions are to be checked. Bearings, brake shoe lining & seals are to be replaced with good quality ones. Limit switches to be renewed, if malfunctioning. System to be flushed & fresh oil to be filled upto the mark. Oil sight glass to be cleaned. Lube oil to be supplied by PPA. Trails such as hoisting, lowering motions & fucntioning of the limit switches to be shown to the Engineer-in-charge.To quote lumpsum including the cost of materials and labour. |
| 164 | PROPULSION UNIT: Make- Schottel, Type – SRP1012 FPa) For both PORT & STBD SRP units, gear oil to be drained completely from the gear box. Both Port and Stbd SRP units to be dismantled completely including the clutches and slip- on pumps. All components are to be cleaned, overhauled and shown to the Engineer-in-charge and the IRS surveyor. Propellers to be cleaned, de-scaled throughly and polished and NDT test to be carried out at the root and tip of the blades and results to be shown to IRS surveyor. Propellers to be coated with PU clear paint of 02 coats or 02 coats of varnish. After completion of survey the Port & Stbd SRP unit to be boxed with new seals, bearings and other required spare parts. Fresh oil to be filled up after completion of job. Trails to be shown in the presence of Authorised Service Engineer.b) Hydraulic oil cooler to be removed, cleaned and fitted back. c) All the electrical fittings, solenoid valves & sensors are to be checked, cleaned & calibrated. d) Hydraulic pump pressure of steering system at points M1, M2, M3, M4 & M5 for both the system are to be measured & recorded. e) SRP carden shaft from M/E flywheel to clutch assembly, all the plumber block bearings top covers for both sides to be opened, bearing to be checked, greased and boxed back. Clearance to be checked properly for tightness. f) Power pack driven belts to be checked and renewed if required. g) Port & Stbd power pack hydraulic oil and filters are to be renewed. All the above works shall be carried out under the supervision of Schottel Authorised Service Engineer. Service Engineer's charges shall be paid by PPA.All tools & tackles to be supplied by the firm. Only spares and oils shall be supplied by PPA. The firm shall quote for the labour charges and consumables. |
| 165 | DRY DOCKING DEFECT LIST OF ENGINE OF TUG TARINI (ELECTRICAL REPAIRS) |
| 166 | E/R blower (Port & Stbd)Motor rating 415 volts, 03 phase, 11 HPThe motors along with fan blades are to be dismantled. Motors to be overhauled with renewal of bearings (SKF/FAG/NSK from authorised dealer). The fan blades to be scrapped cleaned and polished. Insulation of motors to be improved to minimum 50 Mohm. Blower housing & casing are to be scrapped cleaned & painted. The blowers to be assembled back and fitted in place and trails to be shown to the Engineer-in-charge. .To quote lumpsum including the cost of materials and labour. |
| 167 | To supply and fit Main Circuit Breakers for all three Diesel Generators as per sample. Make- Schneider Electrical, LV431120, Specification-NSX250A B TM250D,250A AP., 440V, 4-poles, 250A . After fitting trails to be shown to the Engineer-in-charge. To quote lumpsum including the cost of materials and labour. |
| 168 | Navigation Lighting Panel: Total number of Light 230v A.C/ 24v D.C =12 eachNavigational Panel is to be checked for proper functioning of all the lights, and if any fault found, same to be rectified. Also the alarms system to be checked for its proper functioning i.e; incase of failure of power supply or blowing- off of the bulb, alarm should sound. After fitting trails to be shown to the Engineer-in-charge. To quote lumpsum including the cost of materials and labour. |
| 169 | Insulation strength to be checked & recorded for all wirings, junction boxes, breakers and starters of the following items. All these junction boxes to be cleaned internally. If insulation strength found low same to be improved up to minimum 1.5 mega ohms. Report of test to be submitted of the following items to the Engineer-in-charge. To quote in L.S. for the following jobs. Main switch board (220v & 440v) -02 no 240V Distribution board L1 & L2 -02 nos230V, 24V Distribution Board, LPS-1 -01 no24v DC Distribution board L.PS-2, - 02 nos andOther small terminal boxes for few indiviual machineriesControl panel of Windlass & Capstan - 02 nosEmergency battery charger, 3 KW -01 noPower Distribution section, 415V, 3-phase, 50Hz - 02 nosShore supply connection box - 01 noTo quote lumpsum including the cost of materials and labour. |
| 170 | All the three alternators to be removed from place, dismantled completely, bearings (SKF/ FAG/NSK only) to be renewed, cleaned & improve the insulation strength to 50 Mega ohms & fit back in place and satisfactory trials are to be shown to Engineer-in-chargeTo quote in L.S. for the following jobs.Alternator No. 1 Capacity: 100 KVA, 415v, 3-phase, 50Hz Make: Crompton GreavesAlternator No. 2Capacity 100 KVA, 415 V, 3-Phase, 50 Hz Make- Crompton Greaves Alternator No. 3Capacity 100 KVA, 415 V ,3-Phase, 50 Hz Make- Crompton Greaves To quote lumpsum including the cost of materials and labour. |
| 171 | The following motors to be opened from foundation , dismantled, overhauled. All the bearings are to be renewed with new bearings of either SKF/FAG/NSK make procured from authorised dealer. Motor windings to be varnished & insulation strength to be improved to minimun 50 Mohm. Insulation values before and after improvement to be recorded and shown to the Engineer-in-charge.To quote lumpsum including the cost of materials and labour for the following jobs.(Without rewinding) |
| 172 | Air compressor motor 7.5kw @1500 RPM, 415V, 50Hz, Make - ABB, |
| 173 | G.S pump, Bilge Pump, fire pump motor, 11kw @ 1500 RPMMake - Crompton greaves |
| 174 | Fuel oil transfer motor 2.2kw @ 1430 RPM, 4.16 Amps 415vMake - Crompon Greaves. |
| 175 | Standby Lub oil Primming pump motor, - M2AA090, Capacity -11 kwMake - WEG, Type |
| 176 | Domestic Hydropfore F.W P/P motor & Sanitary S.W pump motor, 1.5 kwMake -Crompton Greaves |
| 177 | Windlass motor 7.5kwMake- Bhavani Engineering Ltd. |
| 178 | Capstan drive motor 15kw/20HP @ 1540RPM, Type-MA16L473,. MAKE- BHARAT BIJLEE LTD. |
| 179 | Lub oil priming pump motor, Rating- 2.2 kw, Rating-415 V, 4.6 Amps |
| 180 | Accommodation supply of fan motor-1 Hp, 415v |
| 181 | Galley exhaust / Blower Motor, 0.5 HP, 415v |
| 182 | Crew toilet exhaust fan Motor, 0.5HP, 415v @1440 RPM |
| 183 | HT Cooling Pump Motor, 4 kw, Make-WEG, Rating-400v, 708 amps, 2875 RPM |
| 184 | ME Standby Cooling pump motor, 7.5 kw, 2900RPM, 3-Phase, 14.2Amps |
| 185 | LT Cooling Pump motor, 5.5 kw, Make - WEG, Rating-400v, 2910, RPM,PF-0.87 |
| 186 | In the E/R, tube light fittings of four feet twin tube lights to be replaced with new 30 watt IP 66 grade led floodlights with weather proof cover. Make: bajaj, CG, Phillips, Havells or Surya. The new fittings of LED lights to be fitted as per EIC instruction.To quote lumpsum including the cost of materials and labour. |
| 187 | In the E/R, tube light fittings of four feet twin tube lights to be replaced with new 50 watt IP 66 grade led floodlights with weather proof cover. Make: bajaj, CG, Phillips, Havells or Surya. The new fittings of LED lights to be fitted as per EIC instruction.To quote lumpsum including the cost of materials and labour. |
| 188 | In the ECR, Chief Engineer's Cabin, Galley, Master's cabin tube light fittings of two feet tube lights to be replaced with ceiling LED lights, 30 watt. Make: Ajmera, CG, Phillips, Havells or equivalent brands. The new fittings of LED tubelights to be done at the existing positions only & the open space left to be covered with ply alongwith sunmica.To quote lumpsum including the cost of materials and labour. |
| 189 | Supply and fit LED Type Flood Light fitting in Upper Deck, IP66 gradeMake - HALONIX/Havells/OsramInput Supply - 230V AC, Wattage – 200 WattsTo quote lumpsum including the cost of materials and labour. |
| 190 | To overhaul and repair the defective Control Panel for 3 KW, Main Battery Charger for emergency battery supply. 6 nos thyrister (IRKD 26/16) to be supplied as per sample and fitted. To quote lumpsum including the cost of materials and labour. |
| 191 | To supply & fit galley exhaust fan 12\\" diameter, 220V as per sample, Make: CG, Havells, Usha, Cinni, Almonard. To quote lumpsum including the cost of materials and labour. |
| 192 | To supply & fit wall (bulkhead) mounted fans 16\\" size, 220 V with necessary modifications of brackets if required, Make: Havells, CG, Bajaj, Cinni, Usha, Almonard. To quote lumpsum including the cost of materials and labour. |
| 193 | To supply and fit Globe glass and metallic protective covers as per sample (Vertically hanging down type) on deck lights, 220v AC (Compatible with sea weather), Make: CG, Phillips, Havells or surya. After fitting trails to be shown to the Engineer-in-charge.To quote lumpsum including the cost of materials and labour. |
| 194 | To supply and fit Globe glass and metallic protective covers as per sample (Vertically hanging down type) on deck lights, 24v DC (Compatible with sea weather), Make: CG, Phillips, Havells or surya. After fitting trails to be shown to the Engineer-in-charge.To quote lumpsum including the cost of materials and labour. |
| 195 | The existing talk back telecomunication system to be either made operational or replace with a conventional telephone system with 06 nos Beetel basic phone units or equivalent make between the Bridge, Engine Roon, Chief Engineer, Master cabin, officer mess room & crew rest room (Total 06 numbers) alongwith any modifications if required.To quote lumpsum including the cost of materials and labour. |
| 196 | To supply & install power unit (MCB) for ME (Stbd), Type: S202, C4, Make: ABB/ Schneider or equivalent. To quote lumpsum including the cost of materials and labour. |
| 197 | STORE & SPARE SUPPLY ITEMS (The firm shall supply the following stores, spares, tools etc. Quotations shall include all kinds of taxes, handling & transport charges). |
| 198 | To supply as per sample stainless steel pipe of dimension 200 mm length & 40 mm bore, threaded at one end (for DG cooler outlet and sea water pump outlet ) |
| 199 | To quote for supply of LED Bulbs (Self balasted) for Deck, 9W Make: SYSKA, Havells, Bajaj & CG, Surya, Phillips.(Pin Type) |
| 200 | To for supply Analog Wall clock (for Chief Engineer's cabin, crew Mess Room & ECR) Make: Ajanta, Oreva or equivalent.12 \\" Dia |
| 201 | To quote for supply of Pedastal Fan (Heavy Duty) with metal fan blade, 220V, 24\\" Make: Havells, CG, Bajaj, Cinni, Usha, Almonard, Hindware |
| 202 | To quote for supply of Spider coupling for Fresh water Hydrophore pumps as per sample. |
| 203 | To quote for supply of Spider coupling for ME Lub oil priming pump as per sample |
| 204 | To quote for supply of Fresh water Hydrophore tank pressure switch as per sample Make: Danfoss, operating range 0- 8 kg/ cm2 |
| 205 | To quote for supply of Spare mini paint roller brush cartridge, 100mm size |
| 206 | To supply Painting roller brush with handle -100 mm |
| 207 | To quote for supply of 1\\" flat brush |
| 208 | To quote for supply of 2\\" flat brush |
| 209 | To quote for supply of 1/2\\" flat brush |
| 210 | To quote for supply of Coir brush with handle for plate cooler cleaning |
| 211 | To quote for supply of Wire brush with handle |
| 212 | To quote for supply of Angle painting brush, 1\\" |
| 213 | To quote for supply of Electrical Panel board turn lock to be replaced as per sample |
| 214 | To quote for supply as per sample, Poly Carbonate shore supply connector, 5-pin type, 450v, 63 A, 3-phase,, 4-poles, Make- Schneider/ ABB/ Legrand / Havells. |
| 215 | To quote for supply of shore supply cable as per sample, 4 core, 6 sq mm c/sectional area. |
| 216 | To quote for supply of Heater coil for distil water plant (2000w, 220v, 16A) as per sample |
| 217 | To quote for supply of 12 Volt Exide Battery of 150 AH for D/G No -1,2, 3, VHF & Fire Engine |
| 218 | To quote for supply of Fibre gauge glass tube (Bosilicate Glass) for ME Expansion tanks as per sample. Thickness 2 mm, outer diameter: 12mm, inner diameter: 8 mm |
| 219 | To quote for supply of 150 mm bore tapered short piece with flanges at both the ends, distance between the flanges approximately 150-200mm as per sample. |
| 220 | To quote for supply of 100 mm bore tapered short piece with flanges at both the ends, distance between the flanges approximately 150-200mm as per sample. |
| 221 | To fabricate and supply perforated sea water line filters as per sample. Approx dia: 200mm & height: 300mm, plate thickness: 3mm, Material: stainless steel grade 316. To quote including cost of material. |
| 222 | To fabricate and supply perforated sea chest filters as per sample. Approx Dia: 400mm & Height: 700mm, Hole size: 6 mm, plate thickness: 4mm, Material: stainless steel grade 316. To quote including cost of material. |
| 223 | To quote for supply of Supply LED Flood Light fitting for Deck, IP66 grade, Make - HALONIX/Phillips/Havells/Osram Input Supply - 230V AC, Wattage – 200 Watts, Beam angle- 90 degrees |
| 224 | To quote for supply of Self starter for Kirloskar D/G, Make: Lucas 7M14-24V, Direction: Clockwise, (Part. No. 260 25 201A), as per sample |
| 225 | To quote for supply of V-belt for Kirloskar D/G. V-Belt No A61/ 1585 of either Fenner/ Dunlop/ Continental/ Mitsuboshi as per sample |
| 226 | To quote for supply of V-belt for Kirloskar D/G. V-Belt cogged No BX-48 Fenner/ Dunlop/ Continental/ Mitsuboshi as per sample |
| 227 | To quote for supply of V-belt for Kirloskar D/G. V-Belt cogged No XPA-1250 Fenner/ Dunlop/ Continental/ Mitsuboshi as per sample |
| 228 | To quote for supply of C-series, 1 Ton, 3 mtrs Chain Block of ISI marked brand such as Hecules Hoist, Indef, Bemco etc. Material should accompany with the test & waranty certficate. |
| 229 | To quote for supply of 2 Ton Chain Block of ISI marked brand such as Hecules Hoist, Indef, Bemco etc. Material should accompany with the test & waranty certficate. |
| 230 | To quote for supply of Wire rope for quick closing valves, Stainless steel, grade 304 |
| 231 | To quote for supply of self-primming mono block pump set, single phase, 0.75 kw, 50 hz, 230 v. Make: Usha, Kisrloskar or Crompton Greaves, Havells |
| 232 | To quote for supply of Kent RO Water Purifier, 10 ltrs capacity |
| 233 | To quote for supply of Automatic battery Charger for DG set make (ELAK) AC-04 model of rating 24 Volt/12 Volts DC and 10 Amp current charging capacity foe 180AH batteries. |
| 234 | To quote for supply of Navigation light bulb AC (220v, 65w) & DC (24v, 65w), 20 nos each as per sample |
| 235 | To quote for supply of 16 Amps, 2-pole, 220v MCB Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail