Name of Work:- Revetment of Tower No.44 (A+0) of 132 KV Sandila-Mallawan Line under ETD-Hardoi
Sl. No.
Item Description
1
Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth.
2
0.2 Meter concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:4:8 in foundation under floor. Including the supply of all material /labour and tools etc. required for completion of work satisfactory including the cost of cement.
3
First class brick work for construction of retaining wall in 1:4 mix ratio, Cement and sand including the cost of all material, Labour and T&P etc. required for completion of work.
4
0.1-Meter-thick concrete in plinth with 20mm stone ballast, coarse sand Cement mortar in ratio of 1:2:4 on the top platform of the foundation including all material, labour and T&P etc. required for proper completion of work.
5
12mm thick plaster work on wall (Outer Surface) with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work.
6
Earth filling under in area revetment of the towers including the cost of earth to be obtained from outside including watering ramming in 200 mm. layers and dressing of earth etc. complete including the cost of earth royalty, taxes, Fright, skilled labour and T&P.
7
Brick work on edge floor laid including preparation of base to proper slope in required pattern with bricks of class designation 7.5 on a bed of 12mm mud mortar with filling of joints including supply of all material, labour and T&P etc. required for proper completion of work. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.