| 1 | Safe loading, Carriage and Unloading of following Store Material with Proper Stacking from ESC RZ/SZ/LESA to JE's Dump Store/Store to work Site. |
| 2 | 33 KV Bus Isolator |
| 3 | Post Insulator |
| 4 | 33 KV Lightening Arrester |
| 5 | 33 KV VCB 800 Amp., 750 MVA |
| 6 | 33 KV CT 200/100/1 Amp. |
| 7 | 33 KV Single T/F Control Pannel |
| 8 | 600/300/5 AMP, 350 MVA Incoming |
| 9 | 200/100/5 AMP, 350 MVA Outgoing |
| 10 | 33 KV 3x300 SQ MM XLPE |
| 11 | 11 KV 3x300 SQ MM XLPE |
| 12 | 11 KV 3x185 SQ MM XLPE |
| 13 | MS Channel 125x65, 3.2Mtr. Long 1,2,3,4 No Pieces for Top channel. 13.10 Kg/Mtr.+wastage. |
| 14 | MS Angles 50x50x6mm for bracing type members of T.G./B.G./Trench |
| 15 | MS Angles 75x75x8, 2.6mtr long, total 5.2 @ 8.9 Kg/Mtr. |
| 16 | MS Angles 75x75x6mm (6.8 Kg/Mtr.) for Neutral/Cable Stand |
| 17 | ACSR Panther Conductor |
| 18 | 33 KV Polymeric Pin Insulator With Nut & Washer |
| 19 | PCC Pole 8.5m long. |
| 20 | Rail Pcs of 90 Lbs 3.46M long 2 No. Pcs 6.92M @ 44.61 Kg./M |
| 21 | MS Channel 100x50 mm (9.6 Kg/Mtr.) for Cable Stand |
| 22 | MS Channel 100x50x2028 mm (Dropper for Fuse Set) |
| 23 | MS Channel 100x50x2240m Top Channel |
| 24 | MS Angle 40x40x5 mm (3.0 Kg/Mtr) |
| 25 | 11 KV Polymeric Disc Insulator T & C type 4500 Kg. |
| 26 | 11 KV Disc fitting T & C type 4500 Kg. |
| 27 | 11 KV Polymeric Pin Insulator |
| 28 | MS Channel 100x50x2028m |
| 29 | Earthing of pole by MS Earthing rod 20x2500 mm & 6 SWG earthing wire etc Complete |
| 30 | MS Angle 65x65x6mm 2240 mm Mtr long for cable hoisting support |
| 31 | Stay Complete with all accessories |
| 32 | 33 KV 3x300 SQ MM XLPE Cable Outdoor |
| 33 | 11 KV 3x300 SQ MM XLPE Cable Outdoor |
| 34 | 11 KV 3x300 SQ MM XLPE Cable Indoor |
| 35 | 11 KV 3x185 SQ MM XLPE Cable Outdoor |
| 36 | 11 KV 3x185 SQ MM XLPE Cable Indoor |
| 37 | Dismantling & safe shifting of existing & working 33/11 KV 05 MVA T/F from plinth to suitable storage place after opening jumper and cable connections as per instruction of Site Engineer. |
| 38 | Extemsion and Repairing of Power Transformer Plinth for 10 MVA T/F. |
| 39 | Plinth of 5MVA 33/11KV T/F: Construction of plinth of size 3.46 x4.46 Mtr. For 5MVA T/F having 0.4 Mtr. above ground level. The work includes excavation of foundation, base concretion of CC 1:4:8 ratio (cement, fine sand & brick ballast) first class brick work in cement morter of rtio1:4 foundation CC in 1:4:8 ratio(cement, find sand & brick ballast) and RCC work in ratio 1:2:4 (cement, coarse sand and stone grit of 20mm gauge using MS bar of 10mm dia(tor) in reinforcement including its cutting, bending & binding in required shape. The work also includes laying of 2 No. 3.46 mtr. long rail pieces complete with cutting, welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/ finished on top and sides of the plinth as per norms of UPPCL. |
| 40 | Lightening Arrestor, P.I. & CT Structure : Fabrication of Lightening Arrestor, P.I. & CT Structure 3.5 mtr. in height as per Drg. digging of two no pits of size 1.075x0.9x0.3 mtr. providing stone pad at the bottom of the pit and grouting of two legs of the Structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the structure shall be properly finished with smoothing of edges. |
| 41 | Isolator Structure: Fabrication of Isolator Structure 3.5 mtr in height as per Drg. digging of two no. pits of size 1.075x0.9x0.3 mtr. providing Stone Pad at the bottom of the pit and grouting of two legs of the isolator structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the isolator structure shall be properly finished with smoothing of edges. |
| 42 | Erection and installation of 33/11KV 05 MVA T/F in a levelled position of the plinth. The work includes shifting of T/F to the site & installation within the S/S premises, assembling, fixing and fitting of all accessories and filling of T/F oil to the desired level and ensuring that there is no leakage. All jumpering & connection are included in the scope of work. |
| 43 | Boring Type Earthing : Earthing for power T/F by way of boring and lowering of 40mm dia, 2.9 mm thick GI Pipe B class from ground upto the water level (minimum 60 feet deep) as per standard practice as per RESPO/REC Drg to ensure below 01 ohm resistance with making of earth pit of 300x300 mm & 1 feet deep with Cover.(All materials to be provided by Contractor). |
| 44 | Chemical Type Earthing : Earthing for power T/F by way of boring and lowering of 40mm dia, 2.9 mm thick GI Pipe B class from ground upto the water level (minimum 10 feet deep) and Connected To Chemical Bag as per standard practice as per RESPO/REC Drg to ensure below 01 ohm resistance with making of earth pit of 300x300 mm & 1 feet deep with Cover.(All materials to be provided by Contractor). |
| 45 | Neutral Stand : Fabrication and grouting (1:4:8) of MS Angle 75x75x6mm in L Shape & in proper size and alignment to provide support through GI earthing strips (50x6)mm size for power transformer neutral including supply & fixing of flexible copper bonds for neutral earthing as per RESPO Drg.(All decentralized/consumable materials to be provided by Contractor). |
| 46 | Cable Stand : Fabrication and erection of cable support made of two pieces of MS channel 100x50mm, 3.0 mtr. long joined to each other by means of 5 no. MS Flat 50x6mm pieces of size 150mm long each by welding at equal intervals as per drawing and grouting in block of size 300x300x700mm (1:4:8) complete. This includes providing of required MS Clamp made of MS Flat holding the cable including nuts & bolts and fixing of XLPE cable. |
| 47 | Stringing, Jumpering and Connections : Stringing and Stranthing of Existing 33KV Bus Bar using of ACSR Panther Conductor and making vertical/Horizontal jumper connection and connecting all the equipments with each other through PG clamps/connectors. Work includes all the jump ring from terminal gantry to Bus Bar and from Bus Bar to Transformer (1no. T/f bay's)(All decentralized/consumable materials to be provided by Contractor). |
| 48 | Installation of Switchgears in Control Room: Shifting carefully & safely 11KV Incoming and Outgoing switchgears from outside of the switchgear room, including grouting the two no. 100x50x6mm channel pieces (each 800 mm long including cutting to size) and foundation bolts in 1:2:4 CC(including cutting of CC of the floor and finishing of floor) as per direction of Engineer incharge, placing and fixing of switchgear on foundation providing G.I. Nuts & of proper size in proper position and alignment and checking, complete work with mounting of P.T. incoming S/G with proper testing & commissioning of switchgear. |
| 49 | Fixing and making Bus Bar connections in between all switchgears after cleaning and tapping with H.T. Tape, empire tape and PVC tape properly, providing and fixing of 6 mm thick Bakelite separators and plugging of all opening & holes with plastic compound complete work as per satisfaction of site incharge. |
| 50 | Shifting carefully and installation of 33KV Single Transformer Control Panel in Control Room including fixing, bolting & grouting of above as per site requirment including commisioning and testing work complete as per norms of UPPCL. |
| 51 | Installation of Isolators: Assembling and installation of line/ bus isolator on the isolator structure adjusting of opening mechanics in proper alignment so as to ensure smooth operation of the same. In case of line isolator proper operation of earth links shall also be ensured. The work includes fabrication & proper connection with earthmat by G.I. erth strip 50x6mm for proper earthing of as per norms of UPPCL flexing if required. |
| 52 | Installation of P.I. : Assembling, installation & mounting of 3 No.(1set) L.A. & Post insulator on the L.A & P.I. Structure/complete with making earth connections (separate) and line connections. The work includes of febrication, fixing and earthing work as per norms of UPPCL. |
| 53 | Installation of CT: Installation of 3 No.(1 set) CT on the CT Structure along with CT Junction Box. The work includes fabrication for proper fixing of C.T. If required and proper commissioning & testing in complete respect as per norms of UPPCL. (CT Junction Box to be provided by Contractor). |
| 54 | Installation of VCB: Installation of 33KV VCB complete work including commissioning, testing & earthing. |
| 55 | Construction of Plinth for 33 KV VCB O/D |
| 56 | Installation of Lightening Arrestors : Assembling, installation & mounting of 3 No.(1set) L.A.on the L.A Structure/complete with making earth connections (separate) with GI Strip 50x6mm. The work includes fabrication for fixing if required.(All decentralized/consumable materials to be provided by Contractor). |
| 57 | Painting of all structures and equipments with good quality ISI Mark one coat of red oxide primer & two coats of Aluminium Paint after scrubbing with wire brush/emery paper.(All materials to be provided by Contractor). |
| 58 | HT Cable Laying : Laying & dressing of 33 KV /11KV 3x300 Sq.mm XLPE cable from 10MVA T/F to 11KV incoming Switchgear by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable.(All decentralized/consumable materials to be provided by Contractor). |
| 59 | Layng & dressing of 11KV 3x185 Sq.mm XLPE cable from 11 KV outgoing Switchgear to 11 KV outgoing feeder double pole by excavation of earth in the trench 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab. The work includes supplying of fine sand, bricks and stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. |
| 60 | Hoisting of 11KV Cable with 100 mm dia 3.5Mtr. long GI Pipe on the feeder cable before mounting the cable on the double pole, lifting, mounting and clamping of 11KV feeder cable boxes on the feeder double pole structure and making connection including supply of cable mounting clamps. The work includes the sealing of GI Pipes, lower end of the pipe is to be buried into the earth by about one foot. (GI Pipe, necessary clamp, nut & bolts etc to be provided by contractor.) |
| 61 | Hoisting of 11KV XLPE Cable for 11 KV switchgears & 33/11KV T/F of requried size. |
| 62 | (a) Excavation of foundation pit in mix soil/normal soil, soft & hard rack and its back filling and levelling etc. The size of the pit will be 800x900 mm and having a depth of 1/6 of the full length of the support. Erection of supports by providing stone pad, fixing all clamps and other accessories such as No. Plate, Danger Board, Barbed Wire (2Kg.), Painting etc. as per relevant RESPO/ RES. drawing . This includes any fabrication, if required.(b) Grouting of above supports with cement, concrete (CC will be of cement coarse sand & brick ballast) Grouting will be done with the help of wooden/steel formers in a block of size 450 mm x 450 mm x 1/6 of the full length of the support in the CC 1:4:8 ratio as per RESPO/ RES. drawing including back filling and proper ramming.(c) Making of plinth of STP 300 mm, dia & 300 mm above ground level in CC of 1:4:8 & plastering of the same with 12 mm thick plaster of cement & sand in 1:4 ratio.(d) Earthing of supports with Earth Electrode 2.5 mtr. length including excavation of pit and driving M.S. Rod upto proper depth and connecting the earth electrode with the help of 8 SWG G.I. Wire and earthing lugs. RESPO/ RES. drawing. |
| 63 | For Outgoing Feeder Double Support on 8.5 Mtr. PCC |
| 64 | (a) Grouting of stay rods 1800x16 mm including all works of excavation grouting by , cement concrete in size 0.60x0.60x0.3 mtr. with ratio 1:4:8 as per relevant drawing including back filling of earth and proper ramming.(b) Fixing, tightening & nuzzling of stay with the poles and required tension as per RESPO/ RES. drawing. |
| 65 | Construction of Cable trench of size 300x300mm including brick work 1:4 in wall of the trench, brick ballast work in 1:5:10 on foundation plaster 12mm thick with coarse sand 1:4 and surface finishing with cement, providing MS Strip at an interval of 0.5 Mt. and MS Angle (25x25x5mm) running on both the edges of trench. |
| 66 | Construction of welded frame type control cable trench cover 0.5 Mt. long suitable for trench including cost of MS/Tor Bar. |
| 67 | Supply and laying of following size Good Quality Armoured Copper Control Cable as per norms of UPPCL through underground/cable trench interlinking through proper termination between all equipment such as T/F Control panel/protection panel/Battery and Battery Charger/VCB/CTs junction box with the help of proper size cable gland/lug and ferrules including proper dressing with the help of proper size of cable tie. (All decentralized/consumable materials to be provided by Contractor). |
| 68 | 4x2.5 Sq.mm |
| 69 | 6x2.5 Sq.mm |
| 70 | 2x2.5 Sq. mm |
| 71 | Control Cable Tray |
| 72 | Providing and Fixing of Single Core PVC Cable, 1x240/400/630 sq.mm. & fixing between Transformer incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing. |
| 73 | Attending of Oil Leakage and Replacement of Defective HT/LT Bushing/ Breather/terminal box/Silicagel/WTI & OTI/ Arcing Horn/Buchholz etc. if required as per site condition. |
| 74 | Supply and fixing of Rubber mat 8/10mm, 2x4mtr. |
| 75 | Supply and Installation of 24 Volt Battery and it charger with connections to existing control circuit complete in all respects. . (Exide/Amaron/Luminous Standard Quality.) |
| 76 | Painting of 5 MVA Power T/F by way of remaining of dust, Oil, Grease by scrubbing the transformer body with the help of emery paper, wire brush and apply two coat red oxide prime and spray painting with good quality paint as per direction of site incharge. |
| 77 | Misc. Work/Civil Work as per site requirment if required as per site incharge. |
| 78 | Centrifusing of Power Transformer oil until getting desire value of BDV as per norms of UPPCL including carriage of oil drum from store (RZ/SZ/LESA) site as per site requirment all man mertrial and centrifusing machine/megger will be provided by Contractor. Please Enable Macros to View BoQ information |