| 1 | Safe loading carriage including unloading & proper stacking of following store materials from any Electy.Store of Sitapur/ Raebareli /LESA Zone to work site. |
| 2 | Cost of 33 KV Line Isolator |
| 3 | Cost of 33 KV CT 400/200/1 Amp. |
| 4 | Cost of 33 KV VCB 800 Amp., 750 MVA |
| 5 | ST Pole 11 Mt Long-SP-55 |
| 6 | ST Pole 13 Mt Long-SP-70 |
| 7 | V-type cross arm 100x50x6 mm, MS Channel 9.6 Kg./mtr |
| 8 | Polymeric 11 KV Disc Insulator B&S. Type 70 KN. |
| 9 | Disc Fittings Dog/ Racoon 70 KN. |
| 10 | Polymeric 33KV Pin Insulator |
| 11 | GI wire 6 SWG for guarding along the line |
| 12 | GI wire 8 SWG for guarding a cross the line |
| 13 | Earthing complete |
| 14 | Single core PVC Cable 1x200 Sq.mm. |
| 15 | Complete Stay (GI Stay rod 20x1800 mm, Stay 7/8 SWG 10 Kg.) |
| 16 | M.S. Angle Iron 65x65x6mm, 4300 mm long 2/6/8 no. Bracing, with 4/12/16 clamps (5.8 kg./m) |
| 17 | M.S. Angle Iron 65x65x6, 3200mm long, 5.8 Kg/Mtr. for cable with clamp |
| 18 | Top channel 125X65mm, 3200 mm long (13.10 Kg./m) with clamp |
| 19 | MS. Channel 100X50 mm (9.6 Kg/mtr.) for Cable Stand |
| 20 | MS Angle 75x75x6mm (6.8 KG/mtr) for Cable Stand |
| 21 | Guarding Angle 75x75x6mm (3500/2200 mm long) |
| 22 | MS Chanel 125x65 mm (13.1Kg./Mtr.) (3.5Mtr. Long x 2 No. = 7M) |
| 23 | MS Angle 75x75x8mm (8.9 Kg./Mt) for Top of Structure (LA, CT,PT, FS) (2.6Mtr. Long x 2 No. = 5.2) |
| 24 | Feeder Contol Pannel |
| 25 | ACSR Dog Conductor |
| 26 | 33 KV XLPE Cable 3x300 sq.mm. |
| 27 | 33 KV XLPE 3X300 sq.mmm C/J/Kit (Outdoor) |
| 28 | 33 KV XLPE 3X300 sq.mmm C/J/Kit (S/Th.) |
| 29 | Providing & Laying ,welding of G.I. strip 50x6mm size with Cable Stand structure. |
| 30 | Isolator Structure: Fabrication of Isolator Structure 3.5 mtr in height as per Drg. digging of two no. pits of size 1.075x0.9x0.3 mtr. providing Stone Pad at the bottom of the pit and grouting of two legs of the isolator structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the isolator structure shall be properly finished with smoothing of edges.(All decentralised materials to be provided by Contractor). |
| 31 | Lightening Arrestor, Post Insulator,Fuse Set & CT Structure : Fabrication of Lightening Arrestor, P.I. & CT Structure 3.5 mtr. in height as per Drg. digging of two no pits of size 1.075x0.9x0.3 mtr. providing stone pad at the bottom of the pit and grouting of two legs of the Structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the structure shall be properly finished with smoothing of edges. (All decentralised materials to be provided by Contractor). |
| 32 | Plinth of VCB : Construction of Plinth of size 2.0 mtrx1.5mtrx0.9mtr. suitable for erection of upper structure of 33KV VCB including grouting of anchor bolts in proper alignment and level. Scope of work includes excavation of foundation base and concreting in CC 1:3:6 (cement, find sand & stone grit) 1st class brick work in cement mortor ratio 1:4:8.(All decentralised materials to be provided by Contractor). |
| 33 | Installation of Isolators: Assembling and installation of line/ bus isolator on the isolator structure adjusting of opening mechanis in proper alignment so as to ensure smooth operation of the same. In case of line isolator proper operation of earth links shall also be ensured. The work includes fabrication & proper connection with earthmat/earthing by G.I. earth strip 50x6mm proper fixing if required (All decentralised materials to be provided by Contractor). |
| 34 | Installation of CT: Installation of 3 No.(1 set) CT on the CT Structure along with CT Junction Box. The work includes fabrication, proper fixing of C.T. with making earth connections(Earth Mat/earthing) with GI Strip 50x6mm and control wiring connection, proper commissioning & testing.(All decentralised materials to be provided by Contractor). |
| 35 | Installation of VCB: Installation of 33KV VCB complete work with making earth connections(Earth Mat/earthing) with GI Strip 50x6mm including control wiring, commissioning & testing (All decentralised materials to be provided by Contractor). |
| 36 | Shifting carefully and installation of 33KV Single Feeder Control Panel in Control Room including fixing, bolting & grouting of above as per required and testing, commisioning complete work as per required. |
| 37 | Supply and laying of following size Good Quality Armoured Copper Control Cable as per norms of UPPCL through underground/cable trench interlinking through proper termination between all equipment such as T/F Control panel/protection panel/Battery and Battery Charger/VCB/CTs junction box with the help of proper size cable gland/lug and ferrules including proper dressing with the help of proper size of cable tie. (All decentralized/consumable materials to be provided by Contractor). |
| 38 | 2x2.5 Sq.mm |
| 39 | 4x2.5 Sq.mm |
| 40 | 6x2.5 Sq.mm |
| 41 | Supply and fixing of Control Cable Trey |
| 42 | Construction of Cable trench of size 300x300mm including brick work 1:4 in wall of the trench, brick ballast work in 1:5:10 on foundation plaster 12mm thick with coarse sand 1:4 and surface finishing with cement, providing MS Strip at an interval of 0.5 Mt. and MS Angle (25x25x5mm) running on both the edges of trench. |
| 43 | Construction of welded frame type control cable trench cover 0.5 Mt. long suitable for trench including cost of MS/Tor Bar. |
| 44 | Fabrication and erection of cable support made of two pieces of MS channel 100x50mm, 3.0 mtr. long joined to each other by means of 5 no. MS Flat 50x6mm pieces of size 150mm long each by welding at equal intervals as per drawing and grouting in block of size 300x300x700mm (1:4:8) complete. This includes providing of required MS Clamp made of MS Flat holding the cable including nuts & bolts and fixing of XLPE cable. |
| 45 | Erection of the following support including cutting, making holes, fixing of all types of accessories digging pits complete in all respect as per RESSPO drawing. All type of clamps nut & bolt, washer to be provided by contractor as per Resspo/UPPCL Norms. |
| 46 | 33 KV Single support of ST Pole 11mtr long.with X Arm, Pin insulator & other all accessories |
| 47 | 33 KV Single support of ST Pole 13 mtr long.with X Arm, Pin insulator & other all accessories |
| 48 | 33 KV Double pole structure on S.T. Pole 13 mtr long complete with Top Channel,bracing.& other all acessories |
| 49 | 33 KV Cable Expouser Double pole structure on S.T. Pole 11mtr long complete with Top Channel,bracing.& other all acessories |
| 50 | Tri Pole structure on ST Pole13 mtr long complete with Top Channel,bracing.& other all acessories |
| 51 | Tri Pole structure on ST Pole 11mtr long complete with Top Channel,bracing.& other all acessories |
| 52 | 33 KV End type double pole support on ST Pole 11 mtr. Long |
| 53 | 33 KV End type double pole support on ST Pole 13 mtr. Long |
| 54 | Erection/fixing for 33 KV Stay set with stay wire 7/8 SWG and clamp as per RESSPO drawing including binding, clambing, clamping, tightening, and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 of cement, Corase, Concrete and sand before back filling of the pits as per RESSPO schedule all clamps, nuts & bolts, cement, brick, concrete blast and etc would be provided by contractor.(Stay Set , Stay wire to be provided by Dept.) |
| 55 | Concreting of supports in 1:4:8 ratio and plinthing of supports upto 300mm above ground level by using cement ,Concrete ,Corase ,and sand in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing.All matrial would be provided by the contractor. |
| 56 | Laying Stinging and sagging of 3 phase ACSR Dog conductor from Double pole upto gantry at 132 KV substation / 33KV substation including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc. in all respect. |
| 57 | Earthing of STP/PCC supports with Earth Electrode 2.5 mtr. length including excavation of pit and driving M.S. Rod upto proper depth and connecting the earth electrode with the help of 6 SWG G.I. Wire and earthing lugs. RESPO/ RES. drawing.Earthing of each section pole is also to be done. All type of nut & bot would be given by the contractor. |
| 58 | Cradle type Guarding of HT/LT/Telephone line/ road/river crossing etc. by providing GI wire No. 6/8 and making net with difference of 1.00 Mtr. Completely including fixing of channel/angle etc. with proper locking at each support. All type of nut bolt ,clamp to be provied by the contractor. |
| 59 | Painting of following supports with one coat of red oxide primer and two coats of aluminum white paint of ISI mark and top danger portion of each support must be painted by providing two coat of Post Office Red Paint (1.5mtr upper portion of support.) Paint and material would be given by contractor to complete of job as per Resspo/UPPCL Norms. |
| 60 | 33 KV Single support of ST Pole 11mtr long.with X Arm, Pin insulator & other all accessories |
| 61 | 33 KV Single support of ST Pole 13 mtr long.with X Arm, Pin insulator & other all accessories |
| 62 | 33 KV Double pole structure on S.T. Pole 13 mtr long complete with Top Channel,bracing.& other all acessories |
| 63 | 33 KV Cable Expouser Double pole structure on S.T. Pole 11mtr long complete with Top Channel,bracing.& other all acessories |
| 64 | Tri Pole structure on ST Pole13 mtr long complete with Top Channel,bracing.& other all acessories |
| 65 | Tri Pole structure on ST Pole 11mtr long complete with Top Channel,bracing.& other all acessories |
| 66 | 33 KV End type double pole support on ST Pole 11 mtr. Long |
| 67 | 33 KV End type double pole support on ST Pole 13 mtr. Long |
| 68 | Providing & Fixing of 33 KV SMC Danger board ( as per GTP)with Clamp & Nut Bolt |
| 69 | Providing & Fixing of 33 KV SMC Number Plate ( as per GTP) with Clamp & Nut Bolt |
| 70 | Providing & Fixing of G.I. Barbed wire (2 Kg./pole) as per Resspo/UPPCL Norms. |
| 71 | Providing & Fixing of Stone Pad (300x300x75 mm) |
| 72 | Drilling /Digging and Laying of 3x300 Sqmm 33 KV, XLPE insulated U/G Cable in HDPE Pipe size of 160 mm dia (Pipe to be laid by Drilling /Digging method ,Whatever is required according to the site) Single circuit below minimum 1.5 mtr. Depth from ground level.(HDPE.Pipe to be provided by contractor) as per Resspo/UPPCL Norms. |
| 73 | Laying of 33 KV, 3x300 Sqmm XLPE Cable (single circuit) by HDD method / Laying In HDPE Pipe /GI Pipe/RCC Pipe in Open Trench / Existing NHAI Trench/ Whatever is required according to the site and depth minimum .9 mtr. Below ground level. as per Resspo/UPPCL Norms. |
| 74 | Laying of 33 KV, 3x300 Sqmm XLPE Cable (single circuit) by digging method depth minimum 0.9 mtr. Below ground level and 750 mm wide by excavation of earth. The work include fine sand, bricks, stone slab, refilling and ramming of the left out soil and levelling etc along with supply and laying of waring tap (yellow colour) having thickness 300 micron, Width 15mm minmum and writing hindi and english as below minmum width of 15mm (Colour Red & Black). DANGER-33 KV CABLE BELOW खतरा- नीचे 33 केवी विद्युत केबल है। |
| 75 | Drilling /Digging and Laying of 3x300 Sqmm 33 KV, XLPE insulated U/G Cable in HDPE Pipe size of 160 mm dia (Pipe to be laid by Drilling /Digging method ,Whatever is required according to the site) Double circuit below minimum 1.2 mtr. Depth from ground level.(HDPE.Pipe to be provided by contractor).Laying two Seprate cables in Seprate HDPE Pipe at a single location through the HDD method at Railway Track Crossing and NHAI Road Crossing as per Resspo/UPPCL Norms. |
| 76 | Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole including G.I. pipe of size 6\\" dia 3 M long and its jumpering complete with clamps, nuts and bolts. (GI Pipe,clamps ,PG Clamps, nut bolt etc to be provided by contractor,) |
| 77 | Providing & Fixing of Cable Route Marker as per Resspo/UPPCL Norms. |
| 78 | Providing & Fixing of Feeder Name Plate as per Resspo/UPPCL Norms. |
| 79 | Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation completely as per direction of Incharge. (About 2 KM.) |
| 80 | Electrical safety Department NOC charges documentation & approval fees etc |
| 81 | High Pressure Testing |
| 82 | Mediation Charges and documentation & Drawaing for NHAI/for Forest /irrigation/ PWD NOC & ROW Issue . |
| 83 | Returning OF Empty 33 kv XLPE 3x300 Sq. mm Cable Drum and other associated materials From Site To Store |
| 84 | Mediation charges (Liaisoning ) For Railway Track Crossing NOC From Indian Railway Department .(Preparation of Drawing, Documenation ,Registration Fees, Wayleave Signing Charges Paid By the Contractor) .The BG and Final Detailed Estimate For Waylevae Charges To be Paid By Department To Indian Railway) Please Enable Macros to View BoQ information |