| 1 | Details of Works |
| 2 | REPLACEMENT OF DAMAGED/RUSTED LT ABC/LT NAKED WIRE LINE REPAIRING OF 33 KV ISOLATOR AND CHEMICAL EARTHING OF DTs AT DIFFERENT PLACE. |
| 3 | Erection of single support pole 8.5 mtr long PCC for LT line , including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 8.5 m PCC Pole) |
| 4 | laying and stringing of LT ABC (size 3x120+1x95+1x16) sq.mm with Spreading and stringing of 1 wire continuous wesel conductor for neutral including binding of insulator complete in all respect with LT clamp, dead End Clamp, i hook, Suspention Clamp,Piercing Connector ,LT Arms, with nut bolts, LT Shackle Insulator The work includes jumpering/connecting of conductor .(All Material provided by contractor Except ABC Conductor and Weasel Conductor) |
| 5 | Replacement of Damaged LT Line (ABC/Naked Conductor line by New ABC 3x120 sq mm ABC including fixing of as per site requirement as necessary Channels, clamps, angle, channel and LT nsulator,dead End Clamp, i hook, Suspention Clamp,Piercing Connector, Nut & Bolts etc (All materials will be arranged by the conctractor except 11 m ST Pole) including dismantling work of existing LT Line and it relatated work as safe Dismentaling of Existing Utility and after Erection of Line all dismantled Line, Consumer Service Connection (single/Three Phase) as Steet lite and other existing thing Fixed on new Pole and LT Lines . |
| 6 | Errection & Commissioning of 3 Phase LT distribution boxes/kiosk on poles including all clamps & materials required for connections & sealing its connection in between Distribution Box & ABC 1x35/16 sq. mm LT PVC cable with required materials (All require materials ie D.B., clamp, insulator, piercing Connector, 1x35 and 1x16 sq mm cable, nut & bolts etc will be arranged by the conctractor) |
| 7 | Grouting of ST/PCCPole, grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly .(as per RESSPO) All material provied by contractor. |
| 8 | Earthing of support STP/PCC complete with the help of M.S. rod 20 mm dia and 2.54 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. As per Resspo and Electrical safety rules.(All Material Provided by Contractor except earthing road and GI Wire. |
| 9 | Cartage of Dismantaled Conductor/ABC from dump store/work Site to Store to Including loanding and unloading |
| 10 | Painting of all structure and equipment inside the switch yard with two coats of red oxide primer and thereafter two coats of aluminium paint, giving silver white finish, painting is to be done after proper cleaning of the structures. paint, primer, thinner etc. required shall be provided by the contractor himself. |
| 11 | Chemical Earthing of transformer body and neutral ( Separate) by lowering of GI pipe of size 1.50” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp and Nut and Bolts. Including Painting of G.I.Strips with green Colour (All materials will be arranged by the conctractor) |
| 12 | After safely removing busbars, cables, jumpers, PG clamps, insulators, PTs, CTs, L.A.s, channels, etc., as per site requirements, the height of 8 switchyard structures will be increased by 1 meter to enhance the height of the existing bay. This process will utilize 4 channels (Size: 125x65x6 mm; Length: 2240 mm), which will feature perforations as per site requirements and be secured using nuts, bolts, and washers. |
| 13 | Replacement of 33 KV Line/Bus Isolator Set in switch yard as per RESPO drawing. Work also includes Dismentalling of Existing Isolator with Openeing PG Clamps, Jumfer etc. and after re assembling work of Jumffer with New PG Clamps(Panther-Panther) all materials shall be provided by the contractor Except 33 KV Isolators |
| 14 | Erection of complete structure and 33 KV Line/Bus Isolator in switch yard as per RESPO drawing. Work also includes construction of plinth of size 1.0x0.45x0.45 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. Including Jumffering work with Panther-Panther PG ClampsAll materials as like G.I. Structure,33 KV Line/Bus Isolator and others concreting material like cement, ballast, sand labour & T&P etc.shall be provided by the contractor. |
| 15 | Construction of cable trenchs for 33 KV and 11 KV cable in the switchyard as per direction of engineer. trenchs to be 1 Meter wide and 1 Meter deep. work includes digging of trench, concreting of the foundation in the ratio 1:3:6 R.B. wall 9” wide with A class bricks cement mortar 1:4 and plastering inside the trench in the ratio 1:3 and sand filling in the trench with openable CC cover sixe 1x1 sq mm All material will be provided by the contractor. |
| 16 | Suppling and Spreading of 20 mm stone blast in Switch yard work Level and compact earth Surfase all work has been completed as per direction of Site Incharge including labour and material cost. |
| 17 | Construction of Additional 250 KVA T/F with 11 KV Hanging and L.T. Line including loading and unloading of material |
| 18 | Erection of sub station type double pole struucture at 11m long STP with mounting of all accessories like 11 kv fuse set, TPMO, top channel, Dropper Channel , Sub Station Base, Bracing angle Channels,Danger board,barbed wire, nuts & Bolt with clamps etc. (All required material for double pole structure & all grouting material provided by contractor except S.T.Pole, Channels, Fuse set ,TPMO ) as per RESSPO norms. |
| 19 | Eerection of 11 mtr long STP support with fixing of necessary clamps and other accessories. (All material provided by contractor except S.T.Pole ) |
| 20 | Earthing of Pole by MS earthing Rod of 20x2500 mm and 6 SWG earthing wire etc. (All material provided by contractor except earthing Rod and GI wire) |
| 21 | Hanging of single 11 KV 3x70 sq mm XLPE cable with the help of stay wire 7/10swg, Nut and bolts, MS Channel, I hook, and clamp.( All material provided by contractor except 11 KV 3x70 sq mm XPLE Cable and Stay wire ) |
| 22 | Hanging of single 11 KV 3x120 sq mm XLPE cable with the help of stay wire 7/10swg, Nut and bolts, MS Channel, I hook, and clamp.( All material provided by contractor except 11 KV 3x120 sq mm XPLE Cable and Stay wire ) |
| 23 | Fixing of following 11 KV Heat Shrinkable Type Cable Termination kits conforming to VDE-0278/1EEE-48-1975/IS – 13573-1992 and ESI STD. 09-13 all other relevant Standards complete with all accessories for 11 KV, 3x70 sq mm XLPE cable. (Jointing kit will be arranged by the contractor). |
| 24 | Outdoor jointing kit. |
| 25 | STR jointing kit. |
| 26 | Fixing of following 11 KV Heat Shrinkable Type Cable Termination kits conforming to VDE-0278/1EEE-48-1975/IS – 13573-1992 and ESI STD. 09-13 all other relevant Standards complete with all accessories for 11 KV, 3x120 sq mm XLPE cable. (Jointing kit will be arranged by the contractor). |
| 27 | Outdoor jointing kit. |
| 28 | STR jointing kit. |
| 29 | Mounting of 250 KVA T/F on D/P along with HT/LT connection with support of D.D. wire 70 sq mm, 240 SQ MM/400 sq mm long baarrel All Lugs, Cupper Z Clamp Sutaible for 400 KVA T/F, nut and bolts atc.(All materials will be arranged by the conctractor Complete in all respect as per Resspo and Electrical Safety rule,execpt T/F.)) |
| 30 | Earthing of transformer body and neutral by lowering Chemical pipe Earthing of size 2.0” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp. (All materials will be arranged by the conctractor) |
| 31 | Installation of L.T. PVC cubical Box ( 400 amp, 3 phase 4 wire, Aluminium busbar with indicator, and fusing arrangement systme) on double pole ,with the help of channel ,clamp & nut bolt etc. and as per Instruction of Engineer Fixing of Telless Unit 500 A and 300 A with provide a propper rrangement (All materials ie LT Cubical box Clamps,Telless Units, Channels etc will be arranged by the conctractor) as per sample provided by department. |
| 32 | Laying of L.T. cable of size 1x240 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 240 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 33 | Laying of L.T. cable of size 3.5x240/400 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 240/400 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 34 | Laying of L.T. cable of size 1x400 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 400 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 35 | Errection & grouting of stay rod with cement, sand and bricks ballast in ratio 1:4:8 and fasteniong the stay wire with pole and stay rod nozzling (All require materials with Stay rod 16X1800mm, Stay wire7/10 swg, 5 KG, Stay clamp,Loop Insulator Bolt & nut will be arranged by the conctractor except Stay Rod and Stay Wire} |
| 36 | Erection of single support pole 9 mtr long STP for LT line , including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 9 m ST Pole) |
| 37 | Erection of single support pole 9 mtr long PCC for HT/LT line , including fixing of necessary clamps, angle, channel and insulator, Danger board,barbed wire,Nut & Bolts etc (All materials will be arranged by the conctractor except 9 m PCC Pole) |
| 38 | Erection of single support pole 9/8.5 mtr long PCC for LT line , including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 8.5 m PCC Pole) |
| 39 | laying and stringing of LT ABC (size 3x120+1x95+1x16) sq.mm with Spreading and stringing of 1 wire continuous wesel conductor for neutral including binding of insulator complete in all respect with LT clamp, dead End Clamp, i hook, Suspention Clamp,Piercing Connector ,LT Arms, with nut bolts, LT Shackle Insulator The work includes jumpering/connecting of conductor .(All Material provided by contractor Except ABC Conductor and Weasel Conductor) |
| 40 | Errection & Commissioning of 3 Phase LT distribution boxes/kiosk on poles including all clamps & materials required for connections & sealing its connection in between Distribution Box & ABC 1x35/16 sq. mm LT PVC cable with required materials (All require materials ie D.B., clamp, insulator, piercing Connector, 1x35 and 1x16 sq mm cable, nut & bolts etc will be arranged by the conctractor) |
| 41 | Grouting of ST/PCCPole, grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly .(as per RESSPO) All material provied by contractor. |
| 42 | Painting of 11/9 ST Pole with Calmp and Channel 1 coat Red Oxide and 2 coat Alluminium Paint |
| 43 | Disconnection and Reconnection of existing Consumer service cable/line |
| 44 | Single phase |
| 45 | Three phase |
| 46 | CONSTRUCTION AND STRENGHTNING OF 11 KV 3X185 SQ MM UNDERGROUND LINE UNDER DEFFERENT PLACE |
| 47 | Earthing of support (11 m pole) complete with the help of M.S. rod 20 mm dia and 2.54 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. As per Resspo and Electrical safety rules.(All Material Provided by Contractor except earthing road and GI Wire. |
| 48 | Earthing of Existing 11 KV VCB Pannel by lowering Chemical pipe Earthing of size 2.0” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp. (All materials will be arranged by the conctractor) |
| 49 | Laying of cable by machine drill method/Manual with the help of HDPE in all horizontally under the road, minimum1050 mm bellow from the surface for laying of HDPE Pipe and laying of 11 KV 3x185 sq m,m XLPE cable in 6'' dia HDPE Pipe including cartage. (HDPE pipe will be provided by contractor except 11 KV XLPE cable) |
| 50 | Hoisting of 11 KV 3x185 sq mm XLPE cable providing GI pipe of size 4” dia 3 M long on double pole including its jumpering, complete with Channel ,clamps, nut & bolts. (All meterials will be provided by contractor except 11 KV,3X185 sq mm cable) |
| 51 | Fixing of termination of 11 KV cable boxes Boxes will be of Heat Shrink indoor type and outdoor type and STR will be arranged by the contractor |
| 52 | Outdoor jointing kit 3x 185 sq mm |
| 53 | STR Jointing kit 3x 185 sq mm |
| 54 | Supply & Fixing of Rout marking stone for 11 KV U/G Line |
| 55 | EXECUTION OF FOLLOWING WORKS FOR INCREASING CAPACITY OF 250 KVA T/F TO 400 KVA T/F |
| 56 | Dismentalling of all the HT/LT connections & earthing of old 11/.4 KV 250 KVA Transformer along with loading carriage & unloading of same of 250 KVA T/F from site to dump/central store Naini. |
| 57 | Erection of sub station type double pole struucture at 11m long STP with mounting of all accessories like 11 kv fuse set, TPMO, top channel, Dropper Channel , Sub Station Base, Bracing angle Channels, Danger board,Barbed wire,nuts & Bolt with clamps etc. (All required material for double pole structure & all grouting material provided by contractor except S.T.Pole, Channels, Fuse set ,TPMO ) as per RESSPO norms. |
| 58 | Mounting of 400 KVA T/F on D/P /plinth along with HT/LT connection with support of D.D. wire 70 sq mm, 240/400 sq mm long baarrel All Lugs, Cupper Z Clamp Sutaible for 400 KVA T/F, Top Channel for Sub Sation base,Nut and bolts atc.(All materials will be arranged by the conctractor excluding 250 KVA T/F) |
| 59 | Repairing/Making New of fencing with painting of Tanformer Plinth (all require material cement ,A class Briks, cement, Stones, Sand, fenging MS angle Provided by Contrctor) |
| 60 | Construction of new T/F plinth as per RESSPO on new place or place of dammaged T/F plinth as per site requirment after arrangement of supply by mobile trolly T/F (All require material cement, A class Briks, cement, Stones, Sand, fenging, MS angle Provided by Contrctor) |
| 61 | Hanging of single 11 KV 3x120 sqmm XLPE cable with the help of stay wire 7/10 swg, Nut and bolts, MS Channel, I hook, and clamp.( All material provided by contractor except 11 KV 3x120 sq mm XPLE Cable and Stay wire ) |
| 62 | Fixing of following 11 KV Heat Shrinkable Type Cable Termination kits conforming to VDE-0278/1EEE-48-1975/IS – 13573-1992 and ESI STD. 09-13 all other relevant Standards complete with all accessories for 11 KV, 3x120 sq mm XLPE cable. (Jointing kit will be arranged by the contractor). |
| 63 | Outdoor jointing kit. |
| 64 | STR jointing kit. |
| 65 | Earthing of transformer body and neutral by lowering Chemical pipe Earthing of size 2.0” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp. (All materials will be arranged by the conctractor) |
| 66 | Installation/ Replacement of Tailless Unit 500 A/300 A, and copper Bus Bar with the help of channel ,clamp & nut bolt etc. as require (All materials will be arranged by the conctractor) |
| 67 | Installation of L.T. cubical Box on double pole ,with the help of channel ,clamp & nut bolt etc. (All materials will be arranged by the conctractor) |
| 68 | Laying of L.T. cable of size 3.5x400 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 400 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 69 | Laying of L.T. cable of size 1x400sq mm.from LT Cubical to LT Pole and suitably connection with 240sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 70 | Laying of L.T. cable of size 1x240 sq mm.from LT Cubical to LT Pole and suitably connection with 240sq mm long baarrel All Lugs at both ends.Lugs provided by contractor. |
| 71 | Erection of single support pole 9/8.5 mtr long PCC for /HTLT line , including fixing of necessary clamps, angle, channel and insulator,Nut & Bolts etc (All materials will be arranged by the conctractor except 8.5 m PCC Pole) |
| 72 | laying and stringing of LT ABC (size 3x120+1x95+1x16) sq.mm with Spreading and stringing of 1 wire continuous wesel/DOG conductor for neutral including binding of insulator complete in all respect with LT clamp, dead End Clamp, i hook, Suspention Clamp,Piercing Connector ,LT Arms, with nut bolts, LT Shackle Insulator The work includes jumpering/connecting of conductor .(All Material provided by contractor Except ABC Conductor and Weasel/DOG Conductor) |
| 73 | Replacement /Installation of 11 KV TPMO set & making of 11 KV Bus Bar on D/P or four pole.(All require materials will be arranged by the conctractor except 11 KV TPMO) |
| 74 | Errection & Commissioning of 3 Phase LT distribution boxes/kiosk on poles including all clamps & materials required for connections & sealing its connection in between Distribution Box & ABC 1x35/16 sq. mm LT PVC cable with required materials (All require materials ie D.B., clamp, insulator, piercing Connector, 1x35 and 1x16 sq mm cable, nut & bolts etc will be arranged by the conctractor) |
| 75 | Replacement /Installation of D.O. fuse set & making of 11 KV Bus Bar on D/P or four pole.(All require materials will be arranged by the conctractor except 11 KV DO Fuse set) |
| 76 | Earthing of support (11/9 m pole/8.5 M PCC) complete with the help of M.S. rod 20 mm dia and 2.54 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. As per Resspo and Electrical safety rules.(All Material Provided by Contractor except earthing road and GI Wire. |
| 77 | Carriage with loading and unloading of Material from Store Center to Worksites/Dump Stores and vise versa if any material balance after execution |
| 78 | Cartage of 11/9 Mtr STP from Store to dump store/work Site Including loanding and unloading |
| 79 | Cartage of 9/8.5Mtr PCC from Store to dump store/work Site Including loanding and unloading |
| 80 | Cartage of 400 kva Transformer from Store to dump store/work Site Including loanding and unloading |
| 81 | Cartage of 250 kva Transformer from Store to dump store/work Site Including loanding and unloading |
| 82 | Cartage of LT 1x240sqmm from Store to dump store/work Site Including loanding and unloading |
| 83 | Cartage of LT 1x400sqmm from Store to dump store/work Site Including loanding and unloading |
| 84 | Cartage of LT 3.5x240/400 sqmm from Store to dump store/work Site Including loanding and unloading |
| 85 | Cartage of 3X70 SQ MM xlpe 11 KV XPLE CABLE from Store to dump store/work Site Including loanding and unloading |
| 86 | Cartage of 3X120 SQ MM xlpe 11 KV XPLE CABLE from Store to dump store/work Site Including loanding and unloading |
| 87 | Cartage of LT ABC from Store to dump store/work Site Including loanding and unloading |
| 88 | Cartage of 11 KV 3x185 sq mm XPLE cable from Store to dump store/work Site Including loading and unloading. |
| 89 | Cartage of 11 KV TPMO set, 11 KV 3 phase DO Fuse set from Store to dump store/work Site Including loanding and unloading |
| 90 | Cartage of Other Line Material as Stay set, Stay wire, ACSR Weasel/DOG conductor, Earthing Rod, 33 KV Isolators, GI wire etc from Store to dump store/work Site Including loanding and unloading Please Enable Macros to View BoQ information |