| 1 | Carriage of 33 kv 3x300 sqmm Cable XLPE from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 2 | Carriage of PCC Pole 11 Mtr Long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 3 | Carriage of ST Pole 13 Mtr Long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 4 | Carriage of ACSR Dog Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 5 | Carriage of line material as per site requirement:-33 kv 3x300 sqmm outdoor Jointing Kit- 6 Nos, 33 KV Cross Arm 100x50 MM V-Type-55Nos, 33 kv Pin Insulator Polymeric-86Nos, 33 Kv Polymeric Disc Insulator 70 KN-3Nos, 33 KV Disc Fitting-15Nos, 33 kv Stay Set 16x1800 mm-8Nos, 33 kv Pin Insulator -39 ...etc...from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 6 | Dismanteling of Old & Used Dog Conductor and Safley carriage from work at site of to Store center/JE store loading and unloading both side.(As per Estimate and received back guidelines) |
| 7 | Dismanteling of Damage ST Pole Scrap old & used and Safley carriage from work at site of to Store center/JE store loading and unloading both side.(As per Estimate and received back guidelines) |
| 8 | Dismanteling of MS Steel 33 kv cross arm damaged old & used and Safley carriage from work at site of to Store center/JE store loading and unloading both side.(As per Estimate and received back guidelines) |
| 9 | Erection of PCC Pole 11/13 Mtr Long at various site complete in all respect as per respo Norms. |
| 10 | Providing/Supply Material and making Conreting/Grouting of Pole at various site complete in all respect as per respo Norms. |
| 11 | Supply & Fixing/Erection/Installation and providing proper termination/connection of Connecting Earthing of Pole at various site complete in all respect as per respo Norms. |
| 12 | Fixing/Erection/Filling and Complete Installation of Carriage Line material as per site requirement:-33 kv 3x300 sqmm outdoor Jointing Kit- 6 Nos, 33 KV Cross Arm 100x50 MM V-Type-55Nos, 33 kv Pin Insulator Polymeric-86Nos, 33 Kv Polymeric Disc Insulator 70 KN-3Nos, 33 KV Disc Fitting-15Nos, 33 kv Stay Set 16x1800 mm-8Nos, 33 kv Pin Insulator -39 ...etc at various site complete in all respect as per respo Norms. |
| 13 | Laying, Lifting, sagging, Jumpering and providing proper termination/connection of ACSR Dog Conductor at various site complete in all respect as per respo Norms. |
| 14 | Laying of 33KV, 3x300sqmm, XLPE Cable Digging(Open Cut Method) in tranch with sand & brick (with HDPE pipe use as per Estimate) and loop riser... etc. complete in all respects as per RESPO norms. Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 15 | Cable Laying of 33KV, 3x300sqmm, XLPE Cable with HDD (trenchless) method including cable laying (with HDPE pipe use as per Estimate) and loop riser... etc. complete in all respects as per RESPO norms. (33KV Feeder Govindpuram) Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 16 | After Laying of 3x300 sqmm Cable XLPE Road Restoration Road Restoration (if required Permission shall be concerned authority by contractor) for kacchha and footpath road Charges at work site complete in all respect as per respo Norms.(180 Meter 33KV Govindpuram Feeder and 360 Meter 33KV Rathi Feeder) |
| 17 | After Laying of 3x185 sqmm Cable XLPE, Road Restoration if required (Permission shall be concerned authority by contractor) for Pucca road/Crossing Charges at work site complete in all respect as per respo Norms. (pit area 1.5X1.0 SQ MTR DEPTH=1.5MTR)=03NOS PIT WILL BE CREATED (33KV Feeder Govindpuram) |
| 18 | Supply & Fixing/Erection/Installation GI Pipe 6\\" Dia (use as above requirment as per Estimate) at various site complete in all respect as per respo Norms. |
| 19 | Supply & Fixing/Erection/Installation HDPE Pipe 140 mm (use as above requirment as per Estimate) at various site complete in all respect as per respo Norms.(33KV Feeder Govindpuram) |
| 20 | Supply & Fixing/Erection/Installation HDPE Pipe 160 mm (use as above requirment as per Estimate) at various site complete in all respect as per respo Norms. (33KV Feeder Govindpuram) |
| 21 | Supply & Fixing/Erection/Installation F Bracket for 33KV at various site complete in all respect as per respo Norms. |
| 22 | Supply & Fixing/Erection/Installation Nut & Bolts at various site complete in all respect as per respo Norms. |
| 23 | Supply & Fixing/Erection/Installation Stone Pad at various site complete in all respect as per respo Norms. |
| 24 | Supply & Fixing/Erection/Installation Clamp for 33 kv V type cross arm with bolt and nut at various site complete in all respect as per respo Norms. |
| 25 | Supply & Fixing/Erection/Installation Number plate with clamp and Nut & Bolt at various site complete in all respect as per respo Norms. |
| 26 | Supply & Fixing/Erection/Installation Danger plate with clamp and Nut & Bolt at various site complete in all respect as per respo Norms. |
| 27 | Supply of Aluminium Paint and proper Painting work at various site complete in all respect as per respo Norms. |
| 28 | Supply of Red Oxide Paint proper Painting work at various site complete in all respect as per respo Norms. |
| 29 | Supply & Fixing/Erection/Installation G I barbed wire at various site complete in all respect as per respo Norms. |
| 30 | Supply & Fixing/Erection/Installation Holding Clamp at various site complete in all respect as per respo Norms. |
| 31 | All other remaining works shall be completed and energised the Line by contractor in all respect as per site requirement.(as per Estimate) Please Enable Macros to View BoQ information |