|
| 1 | Carriage of LT XLPE Cable 1x400 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 2 | Carriage of LT XLPE Cable 1x240 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 3 | Carriage of 250 kva 11/0.4kv New Transformer from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 4 | Carriage of 100 kva 11/0.4kv New Transformer from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 5 | Carriage of LT XLPE Cable 3.5x70/35 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 6 | Carriage of LT ABC different size from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 7 | Carriage of PCC Pole 8.5 MTR LONG from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 8 | Carriage of line material as:-11 kv Fuse Set D/O - 7 No, 11 KV TPMO - 7 Nos, Distribution Box 3 Phase- 54 Nos from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 9 | Dismantling of 63 kva 11/0.4kv old Transformer old & used and Safley carriage from work at site of to Store center/JE store loading and unloading both side.(As per Estimate and received back guidelines) |
| 10 | Dismantling of 100 kva 11/0.4kv old Transformer old & used and Safley carriage from work at site of to Store center/JE store loading and unloading both side.(As per Estimate and received back guidelines) |
| 11 | Providing/Supply Material and making Complete Plinth of Transformer Size 2x2x1.5m with Material(Standard Size) at various site with all accessories complete in all respect as per respo Norms. |
| 12 | Providing/Supply Material and making Complete Wiremesh T/F Fencing 2.5 Mtr (26 R.M.T with MS Angle 35x35x5 MM) with MS agnle(Standard Size) at various site with all accessories complete in all respect as per respo Norms. |
| 13 | Safely placing of 100/250 kva 11/0.4 new T/F on the plinth/DP by the help of Crane/Chain Cuppie complete in all respect as per Respo Norms at various site. |
| 14 | Supply/Providing and Complete Errection Chemical Earthing(Standard Quality) of suitable for 100/250 KVA T/F at various site with all accessories complete in all respect as per respo Norms. (Chemical earthing Quality/sample will be provided to SE-EUDC-I, GZB for acceptance then GTP process and inspection.) |
| 15 | Erection of PCC Pole 8.5 Mtr Long at various site complete in all respect as per respo Norms. |
| 16 | Providing/Supply Material and making Conreting/Grouting of Pole at various site complete in all respect as per respo Norms. |
| 17 | Laying, Lifting, sagging and providing proper termination/connection of LT XLPE AL Cable 1x240 sqmm at various site complete in all respect as per respo Norms. |
| 18 | Laying, Lifting, sagging and providing proper termination/connection of LT XLPE Cable 1x400 sqmm at various site complete in all respect as per respo Norms. |
| 19 | Laying, Lifting, sagging and providing proper termination/connection of LT XLPE Cable 3.5x70/35 sqmm or Different Size(as per Estimate) at various site complete in all respect as per respo Norms. |
| 20 | Laying, Lifting, sagging of LT ABC in different size(as per Estimate) at various site complete in all respect as per respo Norms. |
| 21 | Fixing/Erection/Installation of 11 kv Fuse Set D/O at various site complete in all respect as per respo Norms. |
| 22 | Fixing/Erection/Installation of 11 KV TPMO at various site complete in all respect as per respo Norms. |
| 23 | Fixing/Erection/Installation of Distribution Box 3 Phase at various site complete in all respect as per respo Norms. |
| 24 | Supply & Fixing/Erection/Installation M.S Channel 100x50 mm for TF Base at various site complete in all respect as per respo Norms. |
| 25 | Supply & Fixing/Erection/Installation Nut and Bolt With Washer Off Size at various site complete in all respect as per respo Norms. |
| 26 | Supply & Fixing/Erection/Installation Nut and Bolt at various site complete in all respect as per respo Norms. |
| 27 | Supply & Fixing/Erection/Installation All Lug 250sqmm at various site complete in all respect as per respo Norms. |
| 28 | Supply and Fixing/complete Erection of LT Tailless Unit 300/500/1000 Amp Complete Sturcture(Tailles Drawing will be provided by SE-EUDC-I, GZB) with AL. Bus Bar (2 /3Tailless Unit for each 100/250 KVA Transformer) including supply and errection with all accessories at various site complete in all respect as per RESPO norm. (Tailless Unit Drawing/Quality approved by SE- EUDC-1, GZB.) |
| 29 | Supply & Fixing/Erection/Installation Danger Board Barbed wire including Jumper at various site complete in all respect as per respo Norms. |
| 30 | Supply &Fixing/Erection/Installation Stone Pad 300x300x75 at various site complete in all respect as per respo Norms. |
| 31 | Supply & Fixing/Erection/Installation LT Pole Clamp with nuts & bolts for PCC at various site complete in all respect as per respo Norms. |
| 32 | Supply &Fixing/Erection/Installation Suspension Clamp at various site complete in all respect as per respo Norms. |
| 33 | Supply & Fixing/Erection/Installation J Hook at various site complete in all respect as per respo Norms. |
| 34 | Supply & Fixing/Erection/Installation I Hook at various site complete in all respect as per respo Norms. |
| 35 | Supply & Fixing/Erection/Installation Dead End Clamp at various site complete in all respect as per respo Norms. |
| 36 | Supply & Fixing/Erection/Installation LT Pearcing Clamp at various site complete in all respect as per respo Norms. |
| 37 | Supply & Fixing/Erection/Installation LT Pearcing Connnector 95 sqmm at various site complete in all respect as per respo Norms. |
| 38 | Supply & Fixing/Erection/Installation Pearcing Connnector at various site complete in all respect as per respo Norms. |
| 39 | Supply & Fixing/Erection/Installation P G Clamp at various site complete in all respect as per respo Norms. |
| 40 | Supply & Fixing/Erection/Installation Distribution Box Holding Clamp at various site complete in all respect as per respo Norms. |
| 41 | Supply & Fixing/Erection/Installation Distribution Box connectind Lead at various site complete in all respect as per respo Norms. |
| 42 | Supply & Fixing/Erection/Installation and providing proper termination/connection of Connecting Lead 1x16 sqmm at various site complete in all respect as per respo Norms. |
| 43 | All other Remainings works Shall have to complete in all respect as per site requirement. (as per Estimate) Please Enable Macros to View BoQ information |