|
| 1 | CONTROLLOGIX POWER SUPPLY |
| 2 | CONTROL LOGIX 5571 CONTROLLER WITH 2MBMEMORY |
| 3 | CONTROLOGIX REDUNDANCY MODULE |
| 4 | ETHERNET DUAL PORT |
| 5 | ETHERNET 10-100M INTERFACE MODULE |
| 6 | 4 SLOT CONTROLLOGIX CHASIS |
| 7 | ControlLogix RM module Fiber Optic cable, 3m (2pcs) |
| 8 | 1715 Adaptor Module |
| 9 | 1715 8 Digital Output |
| 10 | 1715 16 Point Digital Input |
| 11 | 1715 16 Analog Input |
| 12 | 2-slot adapter base unit, 2 Ethernet 10/100 base T-Connectors (1 pc) |
| 13 | 3-slot I/O base unit |
| 14 | Termination Assembly - digital input duplex |
| 15 | Termination Assembly - digital output duplex |
| 16 | Termination Assembly - Analog input duplex |
| 17 | I/O Modules Expansion Cable Note: |
| 18 | Bidder must quote prices for all the above line items. Bidder must quote break-up of price for all the requried material, but the cost in this price format shall be total cost of all the material and the invoice also shall be raised as per the price format. |
| 19 | (a)The bidder must quote freight & insurance charges separately up to ONGC destination. If freight & insurance charges are not quoted in price format, the same will be considered as 'Inclusive'.(b)The freight and insurance charges shall be paid at actuals (based on documentory proof) restricted to the amount quoted above.(c)Material must be insured by supplier for losses, damages, breakages and shortages during transit at Supplier's risk & cost. In case of payment documents negotiated through bank, insurance cover in the name of ONGC is required to be furnished for payment. |
| 20 | The quoted rates must include Govt. duties, taxes, levis, etc. as applicable.Freight must be quoted upto: F.O.R., ONGC-EOA, Logistics Park, Vakalapudi , Kakinada, Andhra Pradesh -533003 |
| 21 | In terms of Notification No.3/2017-GST Legislations dated 28.06.2017 and amended vide Notification No. 08/2022 dated 13.07.2022 and 11/2025-IGST(R) dated 17.09.2025, (as amended from time to time), domestic supply of the items specified in List attached in the Notification No 3/2017 dated 28.06.2017 would attract concessional rate of GST @18%, subject to conditions specified therein. If the standard/ merit-rate of GST on the specified goods itself is 18% or lower, then such lower rate of GST would apply directly i.e. without invoking Notification No. 3/2017-1 IGST(R). |
| 22 | Statutory charges like GST must be indicated, failing which, ONGC will not be liable for payment of such charges. |
| 23 | ONGC reserves the right to place order either on ex-works or F.O.R. destination basis. |
| 24 | No separate discount to be mentioned. Discount, if any, shall be merged in the quoted prices. Total FOR cost should be written both in figures and words in price format. |
| 25 | Delivery Period: Please Enable Macros to View BoQ information |