| 1 | Installation of 150 mm dia size DTW by Rotary of 100 m Depth. |
| 2 | Supplying , Installation, testing and commissioning raw water- solar submerssible pump set. |
| 3 | Supplying , fitting, fixing, testing and commissioning raw water pumping main. |
| 4 | Construction of piped water supply scheme. |
| 5 | Site Development at Head Works. |
| 6 | Supplying Installation testing and commissioning of solar clear water pump set 2 HP (1+1). |
| 7 | Clear water pumping mains. |
| 8 | Supplying Installation testing of electricity operated chemical dosing pump. |
| 9 | Supplying fitting fixing, testing and commissioning of Distribution system of length. i) 63 mm dia HDPE |
| 10 | Supplying fitting fixing, testing and commissioning of Distribution system of length. ii) 75 mm dia HDPE |
| 11 | Supplying fitting fixing, testing and commissioning of Distribution system of length. iii) 90 mm dia HDPE |
| 12 | Supplying fitting fixing, testing and commissioning of Distribution system of length. iii) 90 mm dia HDPE |
| 13 | Construction of brick masonry sluice valve chamber (750 mm x 750 mm x 1250 mm) A) for 80 mm dia sluice valve against 90 mm/ 75 mm dia distribution pipe line. |
| 14 | Construction of brick masonry sluice valve chamber (750 mm x 750 mm x 1250 mm) A) for 100 mm dia sluice valve against 110 mm dia distribution pipe line. |
| 15 | Labour charge for making bore hole horizontally across road or embankment for crossing distribution pipe line. i) 80 mm boring for 65 mm dia pipe. |
| 16 | ii) 100 mm boring for 80 mm dia pipe. |
| 17 | iii) 125 mm boring for 100 mm dia pipe. |
| 18 | Supplying fitting & fixing of Bulk Flow Meter conforming to ISO:4064/1 |
| 19 | Supplying fitting fixing, testing and commissioning of functional household tap connection. |
| 20 | Construction of brick boundary wall including necessary earthwork in excavation for foundation. |
| 21 | Supplying fitting & fixing double leaf heavy duty iron Gate, frame made from 50 mm x 6 mm MS flat iron. |
| 22 | Cost of Internal Electrification to pump house & campus lighting. |
| 23 | Single phase electrical connection. |
| 24 | Solar Panel. |
| 25 | Estimate for soil survey along with soil testing for construction of ESR at Pipe Water Supply Scheme. |
| 26 | Supplying fitting & fixing including writing of signboard. |
| 27 | Providing flat brick soling in foundation and under floor with stone etc., |
| 28 | Supplying including installation testing and commissioning of solar street light. |
| 29 | Constuction of low cost sanitary toilet block of size 1.2 m x 1.2 m, complete as directed by the Deptt. |
| 30 | Construction of subgrade and earthen shoulder with approved material obtained from borrow pit with all lead and lift, complete as directed by the Deptt. |
| 31 | Providing drain with brick work in cement mortar in prop 1:5 with half brick thick side walls and 100 mm thick CC 1:3:6 complete as directed by the Deptt. |
| 32 | Repairing of Koupati Bagichakah PWSS : i) Distribution ofPipe line |
| 33 | ii)Repairing of Panel Board |
| 34 | iii)Repairing of FHTC (32 Nos) |
| 35 | iv)Recharging of filter media |
| 36 | v)Sluice Valve |
| 37 | Repairing of No.2 Khajuabil, Jakuapara point 1 PWSS : i) Distribution of Pipe line |
| 38 | ii)Functional household connection |
| 39 | iii)Recharging of filter media |
| 40 | iv)Sluice Valve Please Enable Macros to View BoQ information |