|
| 1 | Excavation in trenches n.exc. 1.5 M wide and n.exc. 1.5 M in depth for foundation, man holes,wells etc and getting out in Hard / dense soil complete all as specified and as directed. |
| 2 | All as per item No. 1.00 above but in soft/disintegrated rock complete all as specified and as directed. |
| 3 | All as per item No. 1.00 above but in hard rock complete all as specified and as directed. |
| 4 | Excavating in post holes (or similar holes) Each on hard/ dense soil n exc 0.5 cu.m, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm post complete all as specified and as directed. |
| 5 | Removing excavated hard/ dense soil material exceeding 1.50 Km but not exceeding 5 km above and depositing complete all as specified and as directed. |
| 6 | Material and labour cement concrete type B-0,1:2:4 (using 20mm graded stone aggregate) as in coping, ramp including slightly rounded or chamfered angles and throating complete all as specified and directed |
| 7 | Material and labour for providing precast cement concrete in window or door cills, lintels, bressumers, steps, quoin blocks (for use with masonry), string courses, copings. kneelers, apex stones, pier caps, columns, posts, boundary pillars, bed plates, pintle blocks, ancho-rage blocks, bonders (for stone wallin). corbels, brackets, etc. (of any section indicated), with plain fair faces, including chamfers, weatherings, throat- ing etc. and setting in mortar complete with joints to match set in cement mortor CM 1:4 Type B1 1:2:4 (using 20mm Graded Stone Aggregate ), complete all as specified and directed |
| 8 | Material and labour PCC 1:2:4 type B2 (using 40mm graded stone aggregate) as in foundation, filling & Mass complete all as specified and directed. |
| 9 | Material and labour for Walling of Random Rubble,Uncoursed,Well Bounded, Beddedand solidly hearted, built in Cement mortar 1:4 and brought up to course level complete all as specified and directed |
| 10 | Labour for Hammer Dressing with maximum depression on face from straight edge held against the dressed surfsce n.exc to lime or sand stone wall facing and dressing of face beds and joints, as specified of Random rubble walling, uncoursed or brought upto course, complete all as specified and directed. Please Enable Macros to View BoQ information |
| 11 | Labour for Hammer Dressing with maximum depression on face from straight edge held against the dressed surfsce n.exc to lime or sand stone wall facing and dressing of face beds and joints, as specified of Random rubble walling, uncoursed or brought upto course, complete all as specified and directed. Please Enable Macros to View BoQ information |