| 1 | PART-I (Erection of 3Ph 3W 11KV Line with 80sqmm covered conductor= 0.280 ckm & 4Nos. guarding)WPB 160x152 (30.44KG/Mtr.),11 mtr- with base plate 300x300x12 |
| 2 | MS 11 KV 'V' Cross Arm (10.2Kg Each) |
| 3 | MS 'F' Clamp (Pole top Bracket) (2.9Kg each) |
| 4 | G.I. Back Clamp for 'V' Cross Arm (11KV) (0.85Kg Each) |
| 5 | 100X50X6 mm, G.I. Channel St Cross arm 1.45Mtr @ 9.2Kg/mtr (6Nos) including top piece |
| 6 | Galvanisation of all RS and MS materials |
| 7 | 11 KV Disc Insulator (T & C) 45 KN Polymer |
| 8 | Tension Assembly Wedge Type with Anchoring Clamp for 11 kV 80 Sqmm covered conductor |
| 9 | 11 KV Pin Insulator (polymer) |
| 10 | H.T. Stay set complete |
| 11 | H.T. Stay Insulator |
| 12 | H.T. Stay Clamp (1.9Kg/pair) |
| 13 | 7/10 SWG G.I. Wire (Grade-2) |
| 14 | Earthing Support (Coil Type) |
| 15 | No.8 GI wire(dia-4.6mm) 0.131Kg/Mtr, 2Mtr for connecting pole with coil earthing |
| 16 | 11KV XLPE COVERED CONDUCTOR 80 SQMM,AAA |
| 17 | IPC for Covered-Covered Conductor 11 KV 80 Sqmm |
| 18 | Non metallic ties for 11 kv covered conductor |
| 19 | Fish Plate 50x6mm, 2.36Kg/Mtr, each 0.280Mtr Length |
| 20 | Danger Plate |
| 21 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 22 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 23 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 24 | GI Bolts, Nuts & Washers of assorted size |
| 25 | 75X40X6 mm, GI Channel St Cross arm 1.5Mtr @ 6.8Kg/mtr (4Nos) for road cross guarding |
| 26 | No-6 GI Wire for road cross Guarding |
| 27 | G.I pipe Earthing 40 mm dia medium gauge(3.25mm thick ness) 3 mtr long |
| 28 | 50x6mm GI Flat for earthing |
| 29 | Black Paint |
| 30 | Yellow colour paint for back ground |
| 31 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 32 | PART-II (Erection of 3Ph 6W LT Line with 4x95+1x95+1x16= 0.540 KM)9Mtr long 300Kg PSC Pole |
| 33 | RCC Base plate |
| 34 | 1.1KV LT AB Cable 4X95+1X95+1X16 |
| 35 | CAP CABLE END FOR ABC 95 SQMM |
| 36 | LT Stay Set (Complete) |
| 37 | LT Stay Insulator |
| 38 | LT Stay Clamp |
| 39 | 7/12 SWG GI stay wire |
| 40 | Suspension clamp with Eye hook |
| 41 | Dead End Clamp suitable for bare messenger XLPE Aerial bunched cable |
| 42 | EYE hook for XLPE Aerial bunched Cable |
| 43 | Pole clamp for Eye Hook (For AB Cable) |
| 44 | Piercing Connector |
| 45 | Neutral Connector |
| 46 | Earthing Support (Coil Type) |
| 47 | No-8 GI wire (Dia 4.6mm) 0.131KG/Mtr - 2Mtr. For connecting pole with coil earthing |
| 48 | Danger Plate |
| 49 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 50 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 51 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 52 | G.I. Nuts and Bolts |
| 53 | Black Paint |
| 54 | Yellow colour paint for back ground |
| 55 | Sunderies |
| 56 | CIVIL PARTStay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500=0.2X6500 =Rs.1300 |
| 57 | Concreting of 11Mtr WPB Poles in ratio 1:1.5:3 = 0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 58 | Concreting of 9Mtr/8Mtr PSC Poles in ratio 1:1.5:3 = 0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 59 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 60 | Material for earthing including masonary work for earth pit, and cement plate cover with salt, charcoal etc. |
| 61 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 62 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 63 | PART-II (DISMENTALING)Dismantling of ACSR/AAAC 80/100 mm2 from overhead line, recoiling, loading, transportation, unloading and staking at a proper place in safe position/site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 64 | Dismantling of RSJ/WPB pole(116x100mm) |
| 65 | Dismantling of all accesseries(Disc,pin insulator, v cross arm, danger board, steel structure of cut point from Single pole structure at 9/10/11/13 Mtr and transportation and stacking the materials at a proper place in safe position within 10km /site store and as per instruction of EIC.%_1 |
| 66 | Dismantling of PSC pole (9mtr)& return |
| 67 | Dismantling of varous size of LT AB Cable from over head line, recoiling, loading,transportation, unloading and staking at a proper place in safe position/BA site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 68 | (Dig 2)PART-I (Erection of 3Ph 3W 11KV Line with 80sqmm cover conductor= 0.210 ckm)WPB 160x152 (30.44KG/Mtr.),11 mtr- with base plate 300x300x12 |
| 69 | MS 11 KV 'V' Cross Arm (10.2Kg Each) |
| 70 | MS 'F' Clamp (Pole top Bracket) (2.9Kg each) |
| 71 | G.I. Back Clamp for 'V' Cross Arm (11KV) (0.85Kg Each) |
| 72 | 100x50x6 mm, G.I. Channel St Cross arm 1.45Mtr @ 9.2Kg/mtr (4Nos) including top piece |
| 73 | Galvanisation of all RS and MS materials |
| 74 | 11 KV Disc Insulator (T & C) 45 KN Polymer |
| 75 | Tension Assembly Wedge Type with Anchoring Clamp for 11 kV 80 Sqmm covered conductor |
| 76 | 11 KV Pin Insulator (polymer) |
| 77 | H.T. Stay set complete |
| 78 | H.T. Stay Insulator |
| 79 | H.T. Stay Clamp (1.9Kg/pair) |
| 80 | 7/10 SWG G.I. Wire (Grade-2) |
| 81 | Earthing Support (Coil Type) |
| 82 | No.8 GI wire(dia-4.6mm) 0.131Kg/Mtr, 2Mtr for connecting pole with coil earthing |
| 83 | 11KV XLPE COVERED CONDUCTOR 80 SQMM,AAA |
| 84 | IPC for Covered-Covered Conductor 11KV 80 Sqmm |
| 85 | Non-metallic ties for 11KV covered conductor |
| 86 | Fish Plate 50x6mm, 2.36Kg/Mtr, each 0.280Mtr Length |
| 87 | Danger Plate |
| 88 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 89 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 90 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 91 | GI Bolts, Nuts & Washers of assorted size |
| 92 | 75X40X6 mm, GI Channel St Cross arm 1.5Mtr @ 6.8Kg/mtr (4Nos) for road cross guarding |
| 93 | No-6 GI Wire for road cross Guarding |
| 94 | G.I pipe Earthing 40 mm dia medium gauge (3.25mm thick ness) 3 mtr long |
| 95 | 50x6mm GI Flat for earthing |
| 96 | Black Paint |
| 97 | Yellow colour paint for back ground |
| 98 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 99 | PART-II (Erection of 3Ph 6W LT Line with 4x95+1x95+1x16= 0.260 KM)1.1KV LT AB Cable 4x95+1x95+1x16 |
| 100 | CAP CABLE END FOR ABC 95 SQMM |
| 101 | Suspension clamp with Eye hook |
| 102 | Dead End Clamp suitable for bare messenger XLPE Aerial bunched cable |
| 103 | EYE hook for XLPE Aerial bunched Cable |
| 104 | Pole clamp for Eye Hook (For AB Cable) |
| 105 | Piercing Connector |
| 106 | Neutral Connector |
| 107 | G.I. Nuts and Bolts |
| 108 | Sunderies |
| 109 | CIVIL PARTStay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500=0.2X6500 =Rs.1300 |
| 110 | Concreting of 11Mtr WPB Poles in ratio 1:1.5:3 = 0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 111 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85= 0.1125x6648.85 =Rs.748.00 |
| 112 | Material for earthing including masonary work for earth pit, and cement plate cover with salt, charcoal etc. |
| 113 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 114 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 115 | PART-II (DISMENTALING)Dismantling of ACSR/AAAC 80/100 mm2 from overhead line, recoiling, loading, transportation, unloading and staking at a proper place in safe position/site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 116 | Dismantling of RSJ/WPB pole (116x100mm) |
| 117 | Dismantling of all accesseries(Disc,pin insulator, v cross arm, danger board, steel structure of cut point from Single pole structure at 9/10/11/13 Mtr and transportation and stacking the materials at a proper place in safe position within 10km /site store and as per instruction of EIC.%_1 |
| 118 | Dismantling of PSC pole (9mtr)& return |
| 119 | Dismantling of varous size of LT AB Cable from over head line, recoiling, loading,transportation, unloading and staking at a proper place in safe position/BA site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 120 | (Dig 3)PART-I (Erection of 3Ph 3W 11KV Line with 80sqmm cover conductor= 0.07 ckm)WPB 160x152 (30.44KG/Mtr.),11 mtr- with base plate 300x300x12 |
| 121 | MS 11 KV 'V' Cross Arm (10.2Kg Each) |
| 122 | MS 'F' Clamp (Pole top Bracket) (2.9Kg each) |
| 123 | G.I. Back Clamp for 'V' Cross Arm (11KV) (0.85Kg Each) |
| 124 | 100X50X6 mm, G.I. Channel St Cross arm 1.45Mtr @ 9.2Kg/mtr (2Nos) including top piece |
| 125 | Galvanisation of all RS and MS materials |
| 126 | 11 KV Disc Insulator (T & C) 45 KN Polymer |
| 127 | Tension Assembly Wedge Type with Anchoring Clamp for 11 kV 80 Sqmm covered conductor |
| 128 | 11 KV Pin Insulator (polymer) |
| 129 | H.T. Stay set complete |
| 130 | H.T. Stay Insulator |
| 131 | H.T. Stay Clamp (1.9Kg/pair) |
| 132 | 7/10 SWG G.I. Wire (Grade-2) |
| 133 | Earthing Support (Coil Type) |
| 134 | No.8 GI wire(dia-4.6mm) 0.131Kg/Mtr, 2Mtr for connecting pole with coil earthing |
| 135 | 11KV XLPE COVERED CONDUCTOR 80 SQMM,AAA |
| 136 | IPC for Covered-Covered Conductor 11 KV 80 Sqmm |
| 137 | Non metallic ties for 11 kv covered conductor |
| 138 | Fish Plate 50x6mm, 2.36Kg/Mtr, each 0.280Mtr Length |
| 139 | Danger Plate |
| 140 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 141 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 142 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 143 | GI Bolts, Nuts & Washers of assorted size |
| 144 | 75X40X6 mm, GI Channel St Cross arm 1.5Mtr @ 6.8Kg/mtr (4Nos) for road cross guarding |
| 145 | No-6 GI Wire for road cross Guarding |
| 146 | G.I pipe Earthing 40 mm dia medium gauge(3.25mm thick ness) 3 mtr long |
| 147 | 50x6mm GI Flat for earthing |
| 148 | Black Paint |
| 149 | Yellow colour paint for back ground |
| 150 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 151 | PART-II (Erection of 3Ph 6W LT Line with 4x95+1x95+1x16= 0.070 KM)1.1KV LT AB Cable 4X95+1X95+1X16 |
| 152 | CAP CABLE END FOR ABC 95 SQMM |
| 153 | Suspension clamp with Eye hook |
| 154 | Dead End Clamp suitable for bare messenger XLPE Aerial bunched cable |
| 155 | EYE hook for XLPE Aerial bunched Cable |
| 156 | Pole clamp for Eye Hook (For AB Cable) |
| 157 | Piercing Connector |
| 158 | Neutral Connector |
| 159 | G.I. Nuts and Bolts |
| 160 | Sunderies |
| 161 | CIVIL PARTStay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500=0.2X6500 =Rs.1300 |
| 162 | Concreting of 11Mtr WPB Poles in ratio 1:1.5:3 = 0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 163 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 164 | Material for earthing including masonary work for earth pit, and cement plate cover with salt, charcoal etc. |
| 165 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 166 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 167 | PART-III (DISMENTALING)Dismantling of ACSR/AAAC 80/100 mm2 from overhead line, recoiling, loading, transportation, unloading and staking at a proper place in safe position/site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 168 | Dismantling of RSJ/WPB pole(116x100mm) |
| 169 | Dismantling of all accesseries(Disc,pin insulator, v cross arm, danger board, steel structure of cut point from Single pole structure at 9/10/11/13 Mtr and transportation and stacking the materials at a proper place in safe position within 10km /site store and as per instruction of EIC.%_1 |
| 170 | Dismantling of PSC pole (9mtr)& return |
| 171 | Dismantling of varous size of LT AB Cable from over head line, recoiling, loading,transportation, unloading and staking at a proper place in safe position/BA site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 172 | (Dig 4)PART-I (Erection of 3Ph 3W 11KV Line with 80sqmm cover conductor= 0.140 ckm)WPB 160x152 (30.44KG/Mtr.),11 mtr- with base plate 300x300x12 |
| 173 | WPB 160x152 (30.44KG/Mtr.),11 mtr- with base plate 300x300x12 (For Stud) |
| 174 | MS 11 KV 'V' Cross Arm (10.2Kg Each) |
| 175 | MS 'F' Clamp (Pole top Bracket) (2.9Kg each) |
| 176 | G.I. Back Clamp for 'V' Cross Arm (11KV) (0.85Kg Each) |
| 177 | 100X50X6 mm, G.I. Channel St Cross arm 1.45Mtr @ 9.2Kg/mtr (6 Nos) including top piece |
| 178 | Galvanisation of all RS and MS materials |
| 179 | 11 KV Disc Insulator (T & C) 45 KN Polymer |
| 180 | Tension Assembly Wedge Type with Anchoring Clamp for 11 kV 80 Sqmm covered conductor |
| 181 | 11 KV Pin Insulator (polymer) |
| 182 | H.T. Stay set complete |
| 183 | H.T. Stay Insulator |
| 184 | H.T. Stay Clamp (1.9Kg/pair) |
| 185 | 7/10 SWG G.I. Wire (Grade-2) |
| 186 | Earthing Support (Coil Type) |
| 187 | No.8 GI wire(dia-4.6mm) 0.131Kg/Mtr, 2Mtr for connecting pole with coil earthing |
| 188 | 11KV XLPE COVERED CONDUCTOR 80 SQMM,AAA |
| 189 | IPC for Covered-Covered Conductor 11 KV 80 Sqmm |
| 190 | Non metallic ties for 11 kv covered conductor |
| 191 | Fish Plate 50x6mm, 2.36Kg/Mtr, each 0.280Mtr Length |
| 192 | Danger Plate |
| 193 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 194 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 195 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 196 | GI Bolts, Nuts & Washers of assorted size |
| 197 | 75X40X6 mm, GI Channel St Cross arm 1.5Mtr @ 6.8Kg/mtr (4Nos) for road cross guarding |
| 198 | No-6 GI Wire for road cross Guarding |
| 199 | G.I pipe Earthing 40 mm dia medium gauge(3.25mm thick ness) 3 mtr long |
| 200 | 50x6mm GI Flat for earthing |
| 201 | Black Paint |
| 202 | Yellow colour paint for back ground |
| 203 | Sunderies (Al Binding tape,Insulation tape, etc.) |
| 204 | PART-II (Erection of 3Ph 6W LT Line with 4x95+1x95+1x16= 0.220 KM)9Mtr long 300Kg PSC Pole |
| 205 | RCC Base plate |
| 206 | 1.1KV LT AB Cable 4X95+1X95+1X16 |
| 207 | CAP CABLE END FOR ABC 95 SQMM |
| 208 | LT Stay Set (Complete) |
| 209 | LT Stay Insulator |
| 210 | LT Stay Clamp |
| 211 | 7/12 SWG GI stay wire |
| 212 | Suspension clamp with Eye hook |
| 213 | Dead End Clamp suitable for bare messenger XLPE Aerial bunched cable |
| 214 | EYE hook for XLPE Aerial bunched Cable |
| 215 | Pole clamp for Eye Hook (For AB Cable) |
| 216 | Piercing Connector |
| 217 | Neutral Connector |
| 218 | Earthing Support (Coil Type) |
| 219 | No-8 GI wire (Dia 4.6mm) 0.131KG/Mtr - 2Mtr. For connecting pole with coil earthing |
| 220 | Danger Plate |
| 221 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 222 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 223 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 224 | G.I. Nuts and Bolts |
| 225 | Black Paint |
| 226 | Yellow colour paint for back ground |
| 227 | Sunderies |
| 228 | CIVIL PARTStay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500=0.2X6500 =Rs.1300 |
| 229 | Concreting of 11Mtr WPB Poles in ratio 1:1.5:3 = 0.450Cum. @ 6648.85 =0.450 x 6648.85 =Rs.2991.98 |
| 230 | Concreting of 9Mtr/8Mtr PSC Poles in ratio 1:1.5:3 = 0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 231 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85= 0.1125x 6648.85 =Rs.748.00 |
| 232 | Material for earthing including masonary work for earth pit, and cement plate cover with salt, charcoal etc. |
| 233 | Survey of incremental/delta network and assets changes of 11 kV network and updation in GESW databas |
| 234 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 235 | PART-II (DISMENTALING)Dismantling of ACSR/AAAC 80/100 mm2 from overhead line, recoiling, loading, transportation, unloading and staking at a proper place in safe position/site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 236 | Dismantling of PSC pole (9mtr)& return |
| 237 | Dismantling of all accesseries(Disc,pin insulator, v cross arm, danger board, steel structure of cut point from Single pole structure at 9/10/11/13 Mtr and transportation and stacking the materials at a proper place in safe position within 10km /site store and as per instruction of EIC.%_1 |
| 238 | Dismantling of PSC pole (9mtr)& return |
| 239 | Dismantling of varous size of LT AB Cable from over head line, recoiling, loading,transportation, unloading and staking at a proper place in safe position/BA site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 240 | (Dig 5)PART-I (Erection of 3Ph 6W LT Line with 4x95+1x95+1x16= 0.210 KM9Mtr long 300Kg PSC Pole |
| 241 | RCC Base plate |
| 242 | 1.1KV LT AB Cable 4X95+1X95+1X16 |
| 243 | CAP CABLE END FOR ABC 95 SQMM |
| 244 | LT Stay Set (Complete) |
| 245 | LT Stay Insulator |
| 246 | LT Stay Clamp |
| 247 | 7/12 SWG GI stay wire |
| 248 | Suspension clamp with Eye hook |
| 249 | Dead End Clamp suitable for bare messenger XLPE Aerial bunched cable |
| 250 | EYE hook for XLPE Aerial bunched Cable |
| 251 | Pole clamp for Eye Hook (For AB Cable) |
| 252 | Piercing Connector |
| 253 | Neutral Connector |
| 254 | Earthing Support (Coil Type) |
| 255 | No-8 GI wire (Dia 4.6mm) 0.131KG/Mtr - 2Mtr. For connecting pole with coil earthing |
| 256 | Danger Plate |
| 257 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 258 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 259 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 260 | G.I. Nuts and Bolts |
| 261 | Black Paint |
| 262 | Yellow colour paint for back ground |
| 263 | Sunderies |
| 264 | CIVIL PARTStay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500=0.2X6500 =Rs.1300 |
| 265 | Concreting of 9Mtr/8Mtr PSC Poles in ratio 1:1.5:3 = 0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 266 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 267 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 268 | PART-II (DISMENTALING)Dismantling of varous size of LT AB Cable from over head line, recoiling, loading,transportation, unloading and staking at a proper place in safe position/BA site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 269 | Dismantling of PSC pole (8mtr)& return |
| 270 | (Dig 6)PART-I (Erection of 3Ph 6W LT Line with 4x95+1x95+1x16= 0.350 KM)9Mtr long 300Kg PSC Pole |
| 271 | RCC Base plate |
| 272 | 1.1KV LT AB Cable 4X95+1X95+1X16 |
| 273 | CAP CABLE END FOR ABC 95 SQMM |
| 274 | LT Stay Set (Complete) |
| 275 | LT Stay Insulator |
| 276 | LT Stay Clamp |
| 277 | 7/12 SWG GI stay wire |
| 278 | Suspension clamp with Eye hook |
| 279 | Dead End Clamp suitable for bare messenger XLPE Aerial bunched cable |
| 280 | EYE hook for XLPE Aerial bunched Cable |
| 281 | Pole clamp for Eye Hook (For AB Cable) |
| 282 | Piercing Connector |
| 283 | Neutral Connector |
| 284 | Earthing Support (Coil Type) |
| 285 | No-8 GI wire (Dia 4.6mm) 0.131KG/Mtr - 2Mtr. For connecting pole with coil earthing |
| 286 | Danger Plate |
| 287 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 288 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 289 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 290 | G.I. Nuts and Bolts |
| 291 | Black Paint |
| 292 | Yellow colour paint for back ground |
| 293 | Sunderies |
| 294 | CIVIL PARTStay concreting in ratio 1:2:4 as per TPSODL specification and drawing = 0.2CUM @ 6500=0.2X6500 =Rs.1300 |
| 295 | Concreting of 9Mtr/8Mtr PSC Poles in ratio 1:1.5:3 = 0.375Cum. @ 6648.85 =0.375 x 6648.85 =Rs.2493.32 |
| 296 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85=0.1125x6648.85 =Rs.748.00 |
| 297 | Survey of incremental/delta network and assets changes of LT network and updation in GESW databas |
| 298 | PART-II (DISMENTALING)Dismantling of varous size of LT AB Cable from over head line, recoiling, loading,transportation, unloading and staking at a proper place in safe position/BA site store. Transportation with adequete vehicle load/capacity shall be only paid seperately%_1 |
| 299 | Dismantling of PSC pole (8mtr)& return |
| 300 | (Dig 7)PART-I (Erection of 33kV 13Mtr WPB Pole= 1 No)WPB 160x152 (30.44KG/Mtr.),13 mtr- with base plate 300x300x12 |
| 301 | 33KV \\"V\\" cross arm(22Kg),GI |
| 302 | 33KV F Clamp |
| 303 | GI Back Clamp for \\"V\\" cross arm(33KV)(1.7 kg each) |
| 304 | 33 KV Pin Insulator (polymer) |
| 305 | Earthing Support (Coil Type) |
| 306 | No.8 GI wire(dia-4.6mm) 0.131Kg/Mtr, 2Mtr for connecting pole with coil earthing |
| 307 | 75X40X6 mm, GI Channel St Cross arm 2Mtr @ 6.8Kg/mtr (4Nos) for road cross guarding |
| 308 | No-6 GI Wire for road cross Guarding |
| 309 | G.I pipe Earthing 40 mm dia medium gauge(3.25mm thick ness) 3 mtr long |
| 310 | 50x6mm GI Flat for earthing |
| 311 | Danger Plate |
| 312 | Back clamp for danger plate 25x3mm flat, 0.59Kg/Mtr flat of 0.510mtr 1No |
| 313 | GI 2Ply, 2.5mm dia barberd wire for anticlimbing device |
| 314 | Back clamp for barbed wire anticlimbing device 25x3mm flat, 0.59Kg/Mtr flat of 0.510 mtr length 4Nos/pole |
| 315 | GI Bolts, Nuts & Washers of assorted size |
| 316 | Black Paint |
| 317 | Yellow colour paint for back ground |
| 318 | Sunderies |
| 319 | CIVIL PARTMaterial for earthing including masonary work for earth pit, and cement plate cover with salt, charcoal etc. |
| 320 | Concreting of 13Mtr WPB Poles in ratio 1:1.5:3 = 0.550Cum. @ 6648.85 =0.550 x 6648.85 =Rs.3656.87 |
| 321 | Couping of Poles in ratio 1:1.5:3 =0.1125Cum. @ 6648.85= 0.1125x6648.85=Rs.748.00 |
| 322 | PART-II (DISMENTALING)Dismantling of 10 Mtr. PSC (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km /site store and refilling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC.%_1 |
| 323 | Dismantling of all accesseries(Disc,pin insulator, v cross arm, danger board, steel structure of cut point from Single pole structure at 9/10/11/13 Mtr and transportation and stacking the materials at a proper place in safe position within 10km /site store and as per instruction of EIC Please Enable Macros to View BoQ information |