|
| 1 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . |
| 2 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. |
| 3 | Metal concrete (1:3:8) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. |
| 4 | C. C (1:2:4) using 12mm size CBG chips chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete excluding centering and shuttering. |
| 5 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor. |
| 6 | Labour for laying sub base in layers not exceeding 100 mm thick including watering,compacting to the required density in OMC with PRR including all cost of material ,labour T& P etc. complete. |
| 7 | Supplying & fixing of 80mm thick cement concrete interlocking paver blocks of M40 grade of approved make ,design,colour & size made by block making machine with proper compaction laid in required pattern etc.complete in all respect confirming to IRC SP-63:2018. |
| 8 | Cleaning the existing surface including removal of binding materials and other foreign materials with wire brushes and small picks sweeping with brooms or soft brushes and finally dusting with old gunny bags and or compressed air to receive bituminous. (Data for 5889 M2) |
| 9 | Providing, laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stagesto proper grade and camber applying and brooming requisite type of screening / binding materials to fill up the interstices of course agrregate watering and compacting to the required density as per clause 404 of MoSRT&H specificaton for Road & Bridge works. (Data for 360.00 Cum) |
| 10 | Providing and applying tack coat with bitumen on prepared surface including cleaning of road surface and spraying bitumen at the rate of 0.20Kg/M2 using mechanical means as per clause 502 of MoSRT&H specification for road & bridge work (4th revision) (Data for 3500M2) AR2006,p-168,item 44 |
| 11 | Providind and laying \\"BITUMINOUS MACADAM\\" with hot mix plant using crushed aggregates of specified grading premixed with Bituminous binder of 60/70 penetration grade of bitumen transportred to site laid over a previously prepared surface with a hydrostatic paver finisher with mechanical control to the required grade level and alignment and rolling with smooth wheeled vibrating and tandem rollers to achieve the desired compaction as per clause 504 of MoSRT&H specification for Road & Bridge works. Data for 205 Cum (450 Tonne) |
| 12 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen transporting the hot mix to work site laying with a hydro static paver finisher with mechanical control to the required grade, level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for road & bridge work. (Data for 195 Cum (450T) |
| 13 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including rafleat rising glass beads @ 250gms per sqmt area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC-35. The finished surface to be level, uniform and free from streaks and holes etc complete. |
| 14 | Towards Photograph of project, display board etc & other unforseen items Please Enable Macros to View BoQ information |