|
| 1 | Scarping old paints with scraper, sand paper and washing with soap water or soda including scafolding charges to any height with all cost of scrapers, sand papers, soap and soda including all taxes, cess of materials, labour, T & P etc. complete as per direction of the Engineer-in-Charge. |
| 2 | 12mm thick Cement Plaster in cement mortar (1:4) over brick work to the smooth surface including watering, curing with cost,carriage royality, cess, taxes of all materials with all labour, T & P etc all complete as per direction of the Engineer-in-Charge. |
| 3 | Finishing wall with two coats good quality weather coat paint of approved shade on new work to give an even shade including cost of weather coat, carriage, taxes, cess of all materials and labour, T & P etc. complete as per direction of Engineer-in-Charge. |
| 4 | Wall painting two coats with plastic emulsion paint of approved shade on old works to give an even shade including cost, carriage, taxes of all materials with cost of paint, labour, T&P etc. all complete as per direction of the Engineer-in-Charge. |
| 5 | Painting two coats with approved enamel paint on new work including cost, carriage, taxes, cess of all materials with cost of paint, labour, T&P, etc. all complete as per direction of the Engineer-in-Charge. |
| 6 | Quarrying, collecting, supplying hard granite stone boulder of size not less than 0.0025 cum from approved quarry free from weathered skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in the river embankment to required profiles in all heights and depths including filling the interstices with small stones , wedging and hammering etc including cost, conveyance, labour, T and P required for the work, royalty, taxes, cess, hire and running charges and transportation of all materials of approved quality with uniform colour and texture with all leads, lifts, delifts handling with uniform colour and texture with all leads, lifts and delifts handling and rehandling etc including all other incidental charges required to complete the works as per specification and direction of the Engineer-in-charge. |
| 7 | Supplying and fixing of tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) joint with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing with all cost, cariage, royalty, taxes, cess of all materials, labour and T & P etc. complete as per the direction of the Engineer-in-Charge. |
| 8 | Earthwork in excavation of foundation in all kinds of soil with all leads, lifts & delifts including rough dressing and leveling the bed and depositing the excavated materials clear away from work site and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, taxes, hire and running charges of all machineries, labour, welfare, cess etc. all complete as per the direction of Engineer-in-Charge. |
| 9 | Filling foundation and plinth with sand well watered and rammed including cost of sand with all cost, carriage, royalty, taxes, cess of all materials, labour and T & P etc. all complete as per direction of the Engineer-in-Charge. |
| 10 | Providing and laying plain cement concrete M-15 grade with 40 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture and sharp sand of approved grading and quality conforming to the specifications with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes,cess of all materials,labour including dewatering by suitable means, mixing concrete by concrete mixer and placing by manual / Mechanical means supplying T & P, curing for specified days by suitable means including compacting by vibrator etc. complete as per approved drawing and specifications etc. complete with all costs incidental to the work and as directed by the Engineer-in-Charge. |
| 11 | Providing and laying cement concrete M-15 grade with 20 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture and sharp sand of approved grading and quality conforming to the specifications with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes,cess of all materials,labour including dewatering by suitable means, mixing concrete by concrete mixer and placing by manual / Mechanical means supplying T & P, curing for specified days by suitable means including compacting by vibrator etc. complete as per approved drawing and specifications etc. complete with all costs incidental to the work and as directed by the Engineer-in-Charge. |
| 12 | Rigid & smooth centering, shuttering for cement concrete in foundation works including false work & dismantling them after specified days of casting including the cost, carriage, royalty, curing, labour, T&P, taxes, cess, etc. complete in all respect as per direction of the Engineer-in-Charge. |
| 13 | Rigid & smooth centering, shuttering for RCC walls and fins including false work & dismantling them after specified days of casting including the cost, carriage of all materials, labour, T&P, taxes, cess, etc. complete in all respect as per direction of the Engineer-in-Charge. |
| 14 | Providing weep holes in brick masonary / plain / reinforced concrete works in abutments / wing walls / return walls with 100mm dia AC pipe extending through the full width of the structure with slope of 1v : 20H towards drawing face with cost of all materials, all labour, all taxes, cess, T & P etc. complete including welfareness as per direction of Engineer-in-Charge. |
| 15 | Filling in foundation & Plinth with excavated materials including watering and ramming with all cost, carriage, labour, T & P, cess and all taxes etc. all complete as per the direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |