| 1 | Clearing shrub jungles, up-rooting stumps and small bushes, trees including clearing away from work site with all leads, lifts, delifts, including labour, T & P, hire and running charges of all machineries, taxes, cess, etc. all complete as per the direction of the Engineer-in-Charge. |
| 2 | Earthwork in excavation of foundation in ordinary soil with all leads, lifts & delifts including rough dressing and leveling the bed and depositing the excavated materials clear away from work site and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, taxes, hire and running charges of all machineries, labour, welfare, cess etc. all complete as per the direction of Engineer-in-Charge. (Measurement will be taken in level section only) |
| 3 | Quarrying, collecting, supplying hard granite stone boulder of size not less than 0.0025 cum from approved quarry free from weathered skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in the river embankment to required profiles in all heights and depths including filling the interstices with small stones , wedging and hammering etc including cost, conveyance, labour, T and P required for the work, royalty, taxes, cess, hire and running charges and transportation of all materials of approved quality with uniform colour and texture with all leads, lifts, delifts handling with uniform colour and texture with all leads, lifts and delifts handling and rehandling etc including all other incidental charges required to complete the works as per specification and direction of the Engineer-in-charge. |
| 4 | Quarrying, Collecting, Supplying of blasted / broken granite stones of 0.03 cum & above size in all directions from approved quarry free from weathered skin surface and any other deleterious materials and stacking at work site for premeasurement (1/6th voids will be deducted from premeasured closely packed stone stacks & from level section quantity and minimum of both is to be considered for payment) and conveying from stacks and dumping of stone in rip rap of earth dam or dyke including filling the interstices with small stones amd wedge amd hammering, sruface packing & fixing wave breakers including cost of stone along with cost, carriage, royalty, taxes, cess of all materials and cost of labour and T & P with all lead, lift & delift & rehandlling etc. complete as per direction of Engineer in Charge. (Measurement to be taken in level section only) |
| 5 | Earth work in suitable type of soil in borrow area and loading in to transport vehicle manually or mechanically and transportation of earth by mechanical means and unloading the earth over the approved surface of the embankment in proper profiles with all leads, lifts,delifts including rough dressing and breaking the clods in to 5 cm to 7 cm size including removal of all foreign materials, debrises, grass, bushes, vegetations, shrubs, roots from transport earth including laying in layers not exceeding 22.50 cm in depth with hire & running charges of all machineries, T & P, cost of labour,carriage, royalty, cess , taxes etc. all complete as per specification and direction of the Engineer-in-Charge. |
| 6 | Quarrying, collecting & supplying of good quality of moorum from approved quarry and stacking near work site in regular box heaps of 1.5 x 1.5 x 0.5 m to be measured as one cum with all leads, lifts and delifts including cost, conveyance, royalty, taxes of all materials etc. complete & spreading the same on the road surface and flank, consolidation with PRR including watering etc. complete with all labour, T & P, taxes, cess etc. all complete as per the direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |