|
| 1 | Earthwork in excavation of foundation in all kinds of soil with all leads, lifts & delifts including rough dressing and leveling the bed and depositing the excavated materials clear away from work site and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, taxes, hire and running charges of all machineries, labour, welfare, cess etc. all complete as per the direction of Engineer-in-Charge. (Measurement will be taken in level section only) |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost of sand with all cost, carriage, royalty, taxes, cess of all materials, labour and T & P etc. all complete as per direction of the Engineer-in-Charge. |
| 3 | Providing and laying plain cement concrete M-15 grade with 40 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture and sharp sand of approved grading and quality conforming to the specifications with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes,cess of all materials,labour including dewatering by suitable means, mixing concrete by concrete mixer and placing by manual / Mechanical means supplying T & P, curing for specified days by suitable means including compacting by vibrator etc. complete as per approved drawing and specifications etc. complete with all costs incidental to the work and as directed by the Engineer-in-Charge. |
| 4 | Providing and laying cement concrete M-15 grade with 20 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture and sharp sand of approved grading and quality conforming to the specifications with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties and taxes,cess of all materials,labour including dewatering by suitable means, mixing concrete by concrete mixer and placing by manual / Mechanical means supplying T & P, curing for specified days by suitable means including compacting by vibrator etc. complete as per approved drawing and specifications etc. complete with all costs incidental to the work and as directed by the Engineer-in-Charge. |
| 5 | Rigid & smooth centering, shuttering for cement concrete in foundation works including false work & dismantling them after specified days of casting including the cost, carriage, royalty, curing, labour, T&P, taxes, cess, etc. complete in all respect as per direction of the Engineer-in-Charge. |
| 6 | Rigid & smooth centering, shuttering for RCC walls and fins including false work & dismantling them after specified days of casting including the cost, carriage of all materials, labour, T&P, taxes, cess, etc. complete in all respect as per direction of the Engineer-in-Charge. |
| 7 | Providing weep holes in brick masonary / plain / reinforced concrete works in abutments / wing walls / return walls with 100mm dia AC pipe extending through the full width of the structure with slope of 1v : 20H towards drawing face with cost of all materials, all labour, all taxes, cess, T & P etc. complete including welfareness as per direction of Engineer-in-Charge. |
| 8 | Filling in foundation & Plinth with excavated materials including watering and ramming with all cost, carriage, labour, T & P, cess and all taxes etc. all complete as per the direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |