| 1 | Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 2 | PCC Pole 8.5 mtr long |
| 3 | PCC Pole 11 mtr long |
| 4 | Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, x-arm, G.I. wire etc. |
| 5 | ACSR Weasel Conductor |
| 6 | ACSR Rabbit Conductor |
| 7 | A.B. Conductor 3x120+1x95+1x16 sq mm |
| 8 | A.B. Conductor 3x95+1x70+1x16 sq mm |
| 9 | A.B. Conductor 3x50+1x35+1x16 sq mm |
| 10 | 33 KV C.T., 400/200/1-1-1A |
| 11 | 33 KV P.T.(OUTDOOR), (33KV/110V) |
| 12 | Transformer Fresh Oil |
| 13 | Carriage of following T/F from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking. |
| 14 | T/F 63 KVA 11/0.4 KV |
| 15 | Carriage of following other materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 16 | Battery Set |
| 17 | Charger Set |
| 18 | Line Isolator 800A. 33 KV |
| 19 | Bus Isolator 800A. 33 KV |
| 20 | Supply & Fixing of following materials |
| 21 | F-Bracket |
| 22 | X-arm holding Clamp With Nut & Bolt |
| 23 | Holding Clamp with Nuts & Bolts for top & dropper Channels |
| 24 | Stay clamps with nuts & Bolts |
| 25 | Stay insulator |
| 26 | Earthing wire Clamp |
| 27 | LT CLAMP |
| 28 | Eye HOOK |
| 29 | Suspension clamp |
| 30 | Dead end clamp |
| 31 | All. Lugs of diff. size long barrel. |
| 32 | 11 KV D.O. Fuse Set |
| 33 | D.O. Fuse mounting Channel |
| 34 | Three Phase Distribution Box Clamp |
| 35 | Lightning Arrester 11 kv |
| 36 | Fixing of Line isolator 800 A/ Bus isolator structure with nut & bolts including all associated work. |
| 37 | Fixing of 11 KV Lightning arrester at Double Pole with L.A. On mounting Channel, clamps and nut & bolts including all associated work. |
| 38 | Fixing of 11 KV D.O. Fuse Set at Double Pole with D.O. Fuse mounting Channel, clamps and nut & bolts including all associated work. |
| 39 | Fixing of 3-Ph. Distribution Box with clamp, N&B with complete all work as required. (All the required materials as DB Box Clamps, Piercing Connectors, Nut & bolts etc for this job shall be provided by the contractor except Distribution Box) |
| 40 | Construction of retaining wall, fabrication & erection of Wiremesh fencing around Transformer with retaining wall & 01 nos. gate with locking arrangement made of MS Angle Iron of size 50x50x6 mm jointed with nuts and bolts. Wiremesh of size 10 swg rectangle type, its painting as per norms of RESPO. (All the materials will be arrangement by the contractor) |
| 41 | Earthing of Neutral of Transformer, Transformer body and double pole by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 40 Mtr. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral, Body & D.P. connection being done by G.I. Strip.(All the materials will be arrangement by the contractor) |
| 42 | Earthing of Neutral of Power Transformer, Transformer body and L.A. Structure and line isolator and bus insolator by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 60 Mtr. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Power Transformer, Transformer body and L.A. Structure and line isolator and bus insolator connection being done by G.I. Strip.(All the materials will be arrangement by the contractor) |
| 43 | Mounting of following Transformer on double pole including its cartage and dragging from dump site to pit site. |
| 44 | T/F 63 KVA |
| 45 | Dismentling of 11 K.V. line on existing pole including rolling back its conductor/G.I. wire from work site to dump site. |
| 46 | Dismentling of L.T. line on existing pole including rolling back its conductor/G.I. wire from work site to dump site. |
| 47 | Erection of PCC/ST Pole (11 KV Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 48 | Erection of PCC/ST double pole (11 KV Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 49 | Erection of PCC/ST Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 50 | Making T-off arrangement including fabrication & fitting of accessories. |
| 51 | Grouting of PCC/ST Pole as per RESPO Norms with grouting materials. |
| 52 | Earthing of pole as per RESPO Norms. |
| 53 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 54 | Laying stringing and sagging of following type HT/LT Lines including all associated work with joint/jumpers and binding of insulator as required. |
| 55 | 11 KV Line Three Phase |
| 56 | L.T. Line by ABC Three Phase |
| 57 | Carriage of old and jarjar conductor/G.I. Wire from dump site to ESC Unnao with loading, unloading and proper stacking. |
| 58 | Cost of Neutral Stand Structure For Maurawan Gramin Power Transformer T/F No.-01 |
| 59 | Cost of Cable Stand For Maurawan Gramin Power Transformer T/F No.-01 |
| 60 | Overhauling And Replacement of Maurawan Gramin Power Transformer T/F No.-01 Buchholz Relay And Magnetic Oil Gauge (M.O.G.) |
| 61 | Dismantling of Old Line isolator/ Bus isolator with nut & bolts including all associated work. |
| 62 | Installation of Battery & Charger Set |
| 63 | Dismantling of old Batter Set |
| 64 | Installation of new Battery Set with complete all work as required |
| 65 | Installation of new Charger Set with complete all work as required |
| 66 | Replacement, Installation, Energization of New/old 33 KV CT/ 33 KV PT unit and all related work. |
| 67 | Carriage of Old Battery & Charger Set from dump site to ESC Unnao with loading, unloading and proper stacking. |
| 68 | Received Back Old and Jarjar Batter Set Please Enable Macros to View BoQ information |