Tender For The Work Of Shifting Of 33 Kv Power Line Hindering The Widening Of The Road From Satellite Bus Stand To Trishul Tiraha/Barrier No. 2 On Pilibhit Bypass Route. (Part-A)
Tender Overview
Project Description
Tender for The Work Of Shifting Of 33 Kv Power Line Hindering The Widening Of The Road From Satellite Bus Stand To Trishul Tiraha/Barrier No. 2 On Pilibhit Bypass Route. (Part-A)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Jun-2026 | Corrigendum for Date Extended | Date | 28-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Part-A 33 KV Feeder HT line shifting at road barrier-2 to SatelliteSupply and errection of 11 meter long tubler pole SP 55, 1/6 over all length of pole grouted in cement concrete with 1:3:6 (cement concrete) of pole 30cm above the ground levels including excavation, back filling etc. rates includes all materials, labour, T&P etc. required for proper completion of the work as per E/I . AR/2018 (P.V.S.R) T-13/2025/07 |
| 2 | S/F of straight MS channel 75x40 mm size (5.7 kg / mt.) 2.24 mt. long for guarding with two nos. 11x116 mm eye bolts etc all complete. AR/2019 T-13/2025/07 |
| 3 | S/F of stay set at least 3.5 mtr. Away from the pole complete with GI 19 mm dia. & 1.80 long stay rod 30 cm. x 63 cm. Anchor plate thimble stay clamp, stay insulator, 19x600 mm. double screw tightner, 7/8SWG GI stay wire etc in 1:3:6 cement concrete & grauting as per direction of E/I. S.I.No-631/18 (P.V.S.R) T-13/2025/07 |
| 4 | S/F of danger Board complete with clamps, bolts & nut complete in all respect as per direction of E/I. S.I 1109/18 |
| 5 | S/F of 2.5mt. long 20mm dia MS earth rod with 6 SWG GI earth wire, nut, bolt & washer etc all complete.AR/2019 T-13/2025/07 |
| 6 | S/F 33 KV pin insulator with on steel poles or any where specified including bolts to fasten the pole cap/cross arm with the pole. AR SI.No 13.10 CPWD 2018 |
| 7 | S/F OF 33KV Disc insulator with gun fitting for fixing on cross arms /clamps to be fixed on poles including all bolts nuts , washer etc. (insulator not less than 41KMN) for proper completion of the work. AR SI.No 13.11 CPWD 2018 |
| 8 | Painting of electric pole with two coat of aluminum paint over red oxide primer etc all complete SIN-634/18. T-13/2025/07 |
| 9 | S/L of 300 sq mm. 3 core 33 KV garde XLPE cable at a depth of complete as direction & approved by E/Ich. (P.V.S.R. attached) |
| 10 | Supply and jointing heat shinkable kit for 33 kv 300 sqmm 3 core XLPE cable including cost at all material, labour T& P etc as per proper completion of work (out door Type) (P.V.S.R) |
| 11 | Supply and jointing heat shinkable kit for 33 kv 300 sqmm 3 core XLPE cable including cost at all material, labour T& P etc as per proper completion of work (Straight through). (P.V.S.R) |
| 12 | S/F of \\"B\\" class of 150 mm dia G.I. pipe with M.S clamp nuts & bolt complete in all respect as per direction of E/I.SI No. 14.13.4 cpwd/2018 (1687 X 100/113 =1492.00) T-13/2025/07 |
| 13 | Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as SI no 619 PWD T-13/2025/07 |
| 14 | Trenchless boring with more than 2 mtr and upto 6mt below ground level by machine technology including o\laying of 33000 V HT cable 150mm Sqm to 400 Sqmmm size with proper completion f the work. As per per direction of E/I. (Analysis Rate) |
| 15 | 140 mm HDPE pipe (PE-80, PN-6 Grade ISI make) by machine technology including o\cost of HDPE pipe, T&P, Labour and all required material suitable for laying of 33000 V HT cable 150mm Sqm to 400 Sqmmm size with proper completion f the work. As per per direction of E/I. (Analysis Rate) |
| 16 | S/F of P.G. clamps/jointing sleeves suitable for panther conductor complete in all respect as per direction of E/I. in all GDA-08 |
| 17 | S/F of anticlimbing device of barbed of device wire of 3t standard for each pole 3.0 Kg.app. With clamping complete in all respect as per direction of E/I. S I 635/2019 |
| 18 | S/F of cable routs marker in suitable masonary enclosure as directed by the engineer /incharge. Sl No. 505/2016 |
| 19 | S/F of 400sq .mm single core Cable etc. Complex |
| 20 | S/F of 100 X50X6mm 1.5 metre long T-13/2025/07 |
| 21 | Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required.SI no 12.40 CPWD/2018 ( 73x100/113) =64 T-13/2025/07 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender