| 1 | Schedule-A |
| 2 | Dismantling of existing roof Treatment from roof and parapet of any description all as specified and directed by Engr-in-charge. Note:- A rate of this item is inclusive of diconnect fitment at water tank or solar heater etc and refixing in the same position after compeleting of roof treatment. |
| 3 | Demolition of existing mud in roofs of any thickness including plastering and leeping (whether full thickness removed or only a part thereof) and removing of mud out side of MoD land all as specified and directed by Engineer - in- Charge. |
| 4 | M& L for Cutting out cracks 'V' section on existing roofs or terrace cleaning out and filling solidly with a hot mixure bitumen and clean dry sand 1:1 by weight complete all as specified and directed by Engr -in-Charge. |
| 5 | M&L for providing cement concrete in roof or mud stops using type B-1, 1:2:4 (20mm graded aggregate) rounded or chamfered on edges or making slope on roof complete all as specified and as directed. |
| 6 | M&L for providing PCC 1:2:4 type B0 using 12.5mm graded stone aggregates avg Th 40mm as in levelling/ padding course on roof slab, projections on similar surfaces existing with slope, making the surface even and smooth without using extra cement. |
| 7 | M&L for 10mm thick cement plastering in CM 1:4 on brick/concrete surfaces of roof and parapet, mixed with water proofing compound, as per manufacturer instructions finished even and smooth without using extra cement complete (upto 4th storey) all as specified and as directed by Engineer -in-Charge. Note:- Water Proofing compound shall be measured & paid separately. |
| 8 | Supply only liquid water proofing compound |
| 9 | M&L water proofing treatment on roof and sunken portion of floor and vertical surfaces consisting as under:-(a) Applying evenly a coat of bituminous primer conforming to IS- 3384:1986@ 0.30 Kg/Sqm including preparation of roof surfaces.(b) Applying evenly a tack coat of industrial bitumen 85/25 @ 1.2 Kg/Sqm on plaster surface all as specified.(c) A layer of 3mm thick APP polymeric membrane of weight not less than 3.60 Kg/Sqm, reinforced with polyester non - woven fabric (weight not less than 160gm/ Sqm) , duly sealed at over laps & joints with end laps of the 10cm and side laps of 7.5cm by flame (by torch application) all as per manufacuture's instructions, complete all as specified and directed. |
| 10 | M&L for applying one coat Bitumen water proofing aluminium heat resistance paint on the roof as per manufacturer instructions complete all as specified and directed by Engr-in- Charge. |
| 11 | Demolition of Cement Concrete( reinforced) in roof, floor , beams, staircase, landing, chajjas and similar suspended works etc (reinforcement cut as required to facilitate demolition) at any level all as directed by Engr in Charge. |
| 12 | M&L for RCC (Nominal Mix) type B1, 1:1 1/2:3 (20mm graded aggregate) as in slab supported walls, beams and columns in floors, roof, landing, balconies, chajjas, canopies, cooking deck slab and shelves etc. |
| 13 | M&L Mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips, complete all as specified and as directed by Engr-in-Charge. |
| 14 | M&L for formwork to soffits of suspended slabs such as roof slabs, floor slabs, landing and similar work; not exceeding 200mm thick (Horizontal or sloping) complete all as directed by Engineer in Charge. Please Enable Macros to View BoQ information |
| 15 | M&L for formwork to soffits of suspended slabs such as roof slabs, floor slabs, landing and similar work; not exceeding 200mm thick (Horizontal or sloping) complete all as directed by Engineer in Charge. Please Enable Macros to View BoQ information |