| 1 | A) Work of repairing / renovation in sanitary complexJungal clearence including weeding out shrubs and small trees up to 150 mm dia girth and there removalas per specification and direction of E/I. |
| 2 | Dismantling old plaster and pointing in cement & lime raking out joint to 15 mm depth watering and disposal of unserviceable mateials with all leads complete as per direction of E/I. |
| 3 | Providing and laying 6mm . precast white glazed tiles in walls over 12mm cement mortar (1:3) and jointed white grey cement slurry flush pointed with white cement including rubbing , polishing and cost of curing taxes and reality all completed as per building specification and direction and of E/I.With commercial grade colour 15x15cm tiles. |
| 4 | Supplying, fitting and fixing vitreous white glazed earthen ware I.W.C. of Hindware make with 100 mm H.C.I. ‘p’ trap including supplying and fixing a pair of vitreous white glazed earthenware ware footrest to be fixed in floor etc. all complete as per specification and direction of E/I. |
| 5 | Cost towards transportation of submersible pump, pipe fittings etc. from store to work site including carriage water tank etc. all complete. |
| 6 | Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar. |
| 7 | Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete. |
| 8 | Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipe and back filling the same after the end of Shrawani Mela. |
| 9 | Earth work in back filling the trenches atter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I. |
| 10 | Laying of PVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost)(i) 32 mm dia PVC pipe |
| 11 | (ii) 25 mm dia PVC pipe |
| 12 | Laying of PVC pipes of approved make on wall and roof with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete in wall as per specification and direction E/I. (Pipes to be supplied departmentally free of cost)(i) 15 mm dia PVC pipe |
| 13 | (ii) 20 mm dia PVC pipe |
| 14 | (iii) 25 mm dia dia PVC pipe |
| 15 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.15 mm nominal dia Pipes |
| 16 | 25 mm nominal dia Pipes |
| 17 | 32 mm nominal dia Pipes |
| 18 | PVC Shower rose 125 mm dia |
| 19 | PTMT bib cock 15mm dia |
| 20 | Providing and F/Fixing polythene water storage tank of mark with cover and suitable locking sysytem in double layers confirming to IS:12701-1996 with latest revision Tank to Bathing Palatform as per site condition including required fittings and PVC pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. for 5 nos of plant(HDPE water storage tank will be supplied free of cost departmentally) |
| 21 | Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I. |
| 22 | Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I. |
| 23 | Providing one coat of oil bound distemper of approved shade and make over old surface including washing, cleaning and papering the walls, scaffolding, washing of floors and taxes all complete as per building specification and direction of E/I. plant no 1 to 5 |
| 24 | Carriage of door from divisional store to site and to store back after taking out including supplying aa labour, tools and materials for fitting fixing steel door in Toilet complex all complete as direction of E/I. plant no 1 to 5 |
| 25 | Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size 60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I |
| 26 | PEYAOO at plant no 3 & 4Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 27 | Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I. |
| 28 | Providing and laying 6mm . precast white glazed tiles in walls over 12mm cement mortar (1:3) and jointed white grey cement slurry flush pointed with white cement including rubbing , polishing and cost of curing taxes and reality all completed as per building specification and direction and of E/I.With commercial grade colour 15x15cm tiles. |
| 29 | providing and supplying including of HDPE water storage tank including carrige from deparment store to work site etc. all com job. Plant no 1 to 5 |
| 30 | B) Providing manpower including supplying materials for cleaning and hygeine in Sanitary ComplexCost towards engaging Pump Operatar cum Electrician cum plumber cum supervisor for opration oof pump and maintainance of elctrically oprated exhoust fan, lght pump morter, cleaning machine all complete job. Grade -II- |
| 31 | Providing and supplying man power (Sweeper) for cleaning & disposal of Toilets waste materials etc. all com job. Plant no 1 to 5 |
| 32 | Supplying of following materials Mug plant no 1 to 5 |
| 33 | Plastic Bucket no 1 to 5 |
| 34 | Providing all tools like brooms/buckets/ toilet cleaning brush, safety articles like mask,/hand gloves/cap/gum boots/apron etc to each cleaning worker all complete as per direction E/I. nos of labor=9 nos |
| 35 | Supplying and providing for cleaning and mataining sanitation and hygeine all required consumables material like Phenyl in leter pauch , liquid toilet disinfectant cleaner of Harpic/Sanny fresh brand in one liter pouch and liquid hand wash soap of detol/lifeboy brand in one liter pouch etc all complete for shrawani mela 2026 as per direction and satishfaction of Engineer-in-charge Phenyl in 1 leter pauch |
| 36 | Liquid toilet disinfectant cleaner of Harpic/Sanny fresh brand in one liter pouch |
| 37 | Liquid hand wash soap of detol/lifeboy brand in one liter pouch |
| 38 | Bleaching powder |
| 39 | Providing and Fixing SS wall mounted heavy duty hand wash soap dispenser of capacity 500 ml all complete as per direction of E/ITwo nos in each Sanitary comlex, For 5 nos of sanitary comlexnos of liquid hand wash soap dispenser =10 nos |
| 40 | Providing Electric high perusuure washer cleaner with pressure gun of minimum capacity of 1000 watt including service wire conncetion from nearest electric supply point includimg connection pipe arrangement for water from exixting source with all plumbimg work for round the clock on hire basis for cleaning toilets / bathroon as per requirement all complete for thirty das (ons of machine in each plant)as per specification and direction E/I |
| 41 | C) Electrical servicesTemporary Electrical Wiring with 1.0 Sq mm wire inclung fixing and taking out all the materil after the mela of 30 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. |
| 42 | Providing & fixing of holder with 10 watt LED bulb and connection of wire inclung fixing and taking out all the materil after the mela of 30 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. |
| 43 | Providing & fixing of exhoust fan of minimum 9 inch dia and connection of wire inclung fixing and taking out all the materil after the mela of 30 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. |
| 44 | Providing & fixing of 50 watt LED flood light and connection of wire inclung fixing and taking out all the materil after the mela of 30 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. |
| 45 | D) MiscellaneousCost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB - for 5 nos sanitary complex |
| 46 | Preparation of surface and marking & writimg information /sign and making logo etc with supply of all required materials all complete as per direction of E/IArea for one Sanitary complex |
| 47 | Fixing & fixing ACP sign board on wall and radiam sign board on groung surface in every toilet comlex including carriage from divisional sotre for carring & returning after mela by removing safely wihout damaging the same all complete as per direction of E/I |
| 48 | Constuction of temporary control room on rental basis of 10feet x 10 feet for 30 days with bmboo, Trippal & clotth lining (Pandaal) including supplying on one fan , four plastic chair , one plastic table, electric connection and drinking water all complete for monitoring all works all complete and after mela taking out all materils as per direction E/I. |
| 49 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour &pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & patternat plant no 3 |
| 50 | A) Septic Tank Cleaning & Repairing WorkSupplying labors, tools and tackles for cleaning filled and choked man hole, septic tank, inspection-chamber, gully pits, sewerage tank etc. in all lift and disposal of spoils up to a lead of 50 M all complete as per specification and direction of E/I.Septic Tank |
| 51 | Changing of broken pipe SWR Pipe Pipe D/S 110mm dia type -A |
| 52 | Reinforced cement concrete work in beams, suspended floor, roofs, having slope up to 15º landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centring, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded aggregate 20mm nominal size) |
| 53 | Providing Tor steel reinforcement of 8 mm 10 mm dia bars as per approved design and drawing Cutting, bending and binding with annealed wire including the cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(a) 8 mm & 10 mm |
| 54 | B) Protection Chamber:-Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil Item-A) and disposal of excavated earth as obtained to a distance up to 50 M- Including all lifts, leveling ramming the foundation trenches, removing roots of trees, shards all complete as per approved design, building specification and direction of E/I. ( For construction of protection chamber) |
| 55 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, Labour, royalty and taxes all complete as per building specification and direction of E/I (mode of measurement competed volume) ( For construction of protection chamber) |
| 56 | Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I. |
| 57 | Providing P.C.C.M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, mixing cement concrete in mixer and placing in position,vibrating,curing,taxes and royalty all complete as per building specification direction of E/I. |
| 58 | Providing designation 75A brick work in C.M. (1:6) in 2 times in foundation & plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm. thick mortar joints,cost of screening materials raking out joints to 15 mm depth , curing, taxes & royalty all complete as per building specification & direction of E/I. ( For construction of protection chamber) |
| 59 | Providing 12 mm, cement plaster (1:6) with punning with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I. ( For construction of protection chamber) |
| 60 | Reinforced cement concrete work in beams, suspended floor, roofs, having slope up to 15º landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centring, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded aggregate 20mm nominal size) |
| 61 | Providing Tor steel reinforcement of 10 mm 12 mm & 16 mm dia. bars as per approved design and drawing excluding carriage of M.S. rods (straight or in coils) to work site, cutting, bending and binding with annealed wire including the cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. ( For construction of protection chamber) (a) 10 mm & 12 mm |
| 62 | Supplying labour for cleaning the Divisional office campus & infront side on the occasion of Shrawani Mela2 nos. labours alternate days during Mela Period. 2 x 15 =30 Nos. (Unskild Labour) |
| 63 | C) Dustbin Installation Work Providing two coats of painting with ready mixed paint of approved shade and make over steel surface of dustbin including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I. (T/Well) |
| 64 | Providing labour for installation of Dustbin in different places in Kawariya Path from Dumma Boarder to Deoghar including digging 150 mm dia bore, grouting with PCC (1:3:6) lean concrete and dismantling of temporary structure of dustbin including breaking P.C.C (1:3:6) grouting and transportation and stacking of Dustbin safely to departmental store after ending MelaE/W |
| 65 | P.C.C (1:4:8) |
| 66 | Taking out.Dismentalling PCC (1:4:8) |
| 67 | Labour charge for fitting & fixing Dustbin |
| 68 | Providing Labour for removing & unbolt existing Dustbin for stacking properly during transportation of Dustbin safely as per direction of E/I. |
| 69 | Cleaning and Disposal of garbage from kawaria pathProviding Tractor with trolly in three shift with POL & OPRATOR on hire basis with licensed driver & his wages with all liabilities such as repair of vehicle if required during working period, accident expenses if any road tax etc. all but exclusive the cost of fuel such as diesel & lubricants, vehicle should be fit for running Kanwariya path. P & M - 181 BCD Pg- 5612 hrs Per day tractor deployment for collection & disposal of garbage |
| 70 | Providing and supplying man power (Sweeper) for cleaning of kawaria path & disposal of garbage by collecting waste material from dustbn and kawaria path all com job. As per direction of E/I200 mtr = 01 Labour, nos of labour for 1500 mtr 15000/200=7.5 nos. say7 nosLabour |
| 71 | Providing all tools like brooms with sick/buckets, safety articles like mask, / hand gloves/cap/gum boots/apron etc to each cleaning worker all complete as per direction E/I.nos of labor=18 nos |
| 72 | A. INDRAVARSHA Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipe and back filling the same after the end of Shrawani Mela |
| 73 | Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I. |
| 74 | Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same |
| 75 | Supplying of 32 mm dia CPVC pipe 3 M length do-do all complete. |
| 76 | Laying & jointing GI/ PVC pipe in hanging position ovar support and taking out the same after and of Shrawani Mela ( pipe supplied departmentally free of cost)a. 32 mm dia. Pipe -2x 5nos x 5.0 m |
| 77 | b. 25 mm dia. Pipe -5 nos x 5 m +2 nos x 5 mtr |
| 78 | Supplying and fixing GI fittings of approved make all complete as per specification and direction E/I..32 mm U/S |
| 79 | 25 mm Socket |
| 80 | 32 x 25 R.S. |
| 81 | 32 x 25 Elbow |
| 82 | 25 mm U/S |
| 83 | 32 mm Tee |
| 84 | Electric welding of 15 mm dia Nipple in 25 mm dia GI pipe after making hole of 20 mm dia including cost of nippleIn 32 mm dia. Pipe |
| 85 | In 15 mm dia. GI Nipple |
| 86 | Cost of 15 mm dia. GI. Socket |
| 87 | Cost of Brass Nozzle |
| 88 | Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar. |
| 89 | Providing pump operator cum water spreader for operating motor and spreading water on laid sand (1 No x 30Days 9:0AM to 5:00PM) Gr.-II |
| 90 | Supplying Tractor with tractor having 2 hp diesel pump fitted on tanker on hire basis with licensed driver and helper with wages with all liabilities such as repair of vehicle if required during working period, accident expenses if any road tax etc. all but exclusive the cost of fuel such as diesel & lubricants, vehicle should be fit for running Plant No. 1 to 5 Mangleshwar Bhawan Minimum fuel consumption will be acceptable (avg.) (1.500 Km +1 Km water filling point) Vehicle |
| 91 | Tanker |
| 92 | Consumption 2.50 liter in each trip (4 nos. trip in each day) = 2 shift x 4 Tripx 2.50 lits.=20.00 ltrs.Diesel |
| 93 | GST @18% |
| 94 | Labour Cess @1% Please Enable Macros to View BoQ information |