| 1 | A) Work of repairing / renovation in sanitary complexJungal clearence including weeding out shrubs and small trees up to 150 mm dia girth and there removalas per specification and direction of E/I. |
| 2 | Dismantling old plaster and pointing in cement & lime raking out joint to 15 mm depth watering and disposal of unserviceable mateials with all leads complete as per direction of E/I. |
| 3 | Providing 12 mm cement plaster (1:6) with clean coarse sand of F.M 1.5 including cost of screening, curing with all leads and lifts of water,scaffolding,taxes and royalty all complete as per building specification and direction of E/I. |
| 4 | Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 5 | Supplying, fitting and fixing vitreous white glazed earthen ware I.W.C. of Hindware make with 100 mm H.C.I. ‘p’ trap including supplying and fixing a pair of vitreous white glazed earthenware ware footrest to be fixed in floor etc. all complete as per specification and direction of E/I. |
| 6 | Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.Sanitary complex |
| 7 | Cost towards transportation of submersible pump, pipe fittings etc. from store to work site including carrige water tank etc. all complete |
| 8 | Cost towards fitting and fixing submersible pump with clamp etc. all complete including lowering of PVC pipe. 2 H.P. TO7.5 H.P. and taking out after ending mela and deposited in store |
| 9 | Cost towards dismantling after mela and taking back from work site to store including carriage of all materials and pump, water tank etc. all complete. |
| 10 | Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipe and back filling the same after the end of Shrawani Mela. |
| 11 | Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I. |
| 12 | Laying of PVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost)(i) 32 mm dia PVC pipe.(P11=40M) |
| 13 | (ii) 25 mm dia PVC pipe.=.(P11=30M) |
| 14 | Laying of PVC pipes of approved make on wall and roof with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete in wall as per specification and direction E/I. (Pipes to be supplied departmentally free of cost)(i) 15 mm dia PVC Pipe |
| 15 | (ii) 20 mm dia PVC Pipe |
| 16 | (ii) 25 mm dia dia PVC Pipe |
| 17 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.15 mm nominal dia Pipes |
| 18 | 20 mm nominal dia Pipes (major bath area) |
| 19 | 32 mm nominal dia Pipes |
| 20 | PTMT bib cock 15mm dia |
| 21 | Providing and F/Fixing polythene water storage tank of mark with cover and suitable locking sysytem in double layers confirming to IS:12701-1996 with latest revision Tank to Bathing Palatform as per site condition including required fittings and PVC pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. (HDPE water storage tank will be supplied free of cost departmentally) |
| 22 | Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I. |
| 23 | Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I. |
| 24 | Providing one coat of oil bound distemper of approved shade and make over old surface including washing, cleaning and papering the walls, scaffolding, washing of floors and taxes all complete as per building specification and direction of E/I. |
| 25 | Carriage of door from divisional store to site and to store back after taking out including supplying all labour, tools and materials for fitting fixing steel door in Toilet complex all complete as direction of E/I. |
| 26 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour &pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & patternat plant no 3 |
| 27 | B) Providing manpower including supplying materials for cleaning and hygeine in Sanitary ComplexProviding and supplying man power (Sweeper) for cleaning & disposal of Toilets waste materials etc. all com job. |
| 28 | Supplying of following materials Mug plant |
| 29 | Plastic Bucket |
| 30 | Providing all tools like brooms/buckets/ toilet cleaning brush, safety articles like mask,/hand gloves/cap/gum boots/apron etc to each cleaning worker all complete as per direction E/I. |
| 31 | Supplying and providing for cleaning and maintaining sanitation and hygeine all required consumables material like Phenyl in leter pauch , liquid toilet disinfectant cleaner of Harpic/Sanny fresh brand in one liter pouch and liquid hand wash soap of detol/lifeboy brand in one liter pouch etc all complete for shrawani mela 2026 as per direction and satishfaction of Engineer-in-charge Phenyl in 1 leter pauch |
| 32 | Liquid toilet disinfectant cleaner of Harpic/Sanny fresh brand in one liter pouch |
| 33 | Liquid hand wash soap of detol/lifeboy brand in one liter pouch |
| 34 | Bleaching powder |
| 35 | Providing and Fixing SS wall mounted heavy duty hand wash soap dispenser of capacity 500 ml all complete as per direction of E/ITwo nos in each Sanitary comlex, For 1 nos of sanitary comlexnos of liquid hand wash soap dispenser =2 nos |
| 36 | Providing Electric high perusuure washer cleaner with pressure gun of minimum capacity of 1000 watt including service wire conncetion from nearest electric supply point includimg connection pipe arrangement for water from exixting source with all plumbimg work for round the clock on hire basis for cleaning toilets / bathroon as per requirement all complete for thirty das (ons of machine in each plant)as per specification and direction E/I |
| 37 | C) Electrical servicesTemporary Electrical Wiring with 1.0 Sq mm wire inclung fixing and taking out all the materil after the mela of 30 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. |
| 38 | Providing & fixing of holder with 10 watt LED bulb and connection of wire inclung fixing and taking out all the materil after the mela of 30 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. |
| 39 | Providing & fixing of 50 watt LED flood light and connection of wire inclung fixing and taking out all the materil after the mela of 30 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. |
| 40 | D) MiscellaneousCost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB - |
| 41 | Preparation of surface and marking & writimg information /sign and making logo etc with supply of all required materials all complete as per direction of E/Ifor 1 nos of saniotary complex = |
| 42 | A) Septic Tank Cleaning & Repairing WorkSupplying labors, tools and tackles for cleaning filled and choked man hole, septic tank, inspection-chamber, gully pits, sewerage tank etc. in all lift and disposal of spoils up to a lead of 50 M all complete as per specification and direction of E/I. |
| 43 | Changing of broken pipe SWR PipePipe D/S 110mm dia type -A |
| 44 | (B) for SWR pipe work & Chamber slabEarthwork in excavation in foundation trenches in ordinary soil (vide classification of soil Item-A) and disposal of excavated earth as obtained to a distance up to 50 M- Including all lifts, leveling ramming the foundation trenches, removing roots of trees, shards all complete as per approved design, building specification and direction of E/I. ( For construction of protection chamber) |
| 45 | Reinforced cement concrete work in beams, suspended floor, roofs, having slope up to 15º landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centring, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded aggregate 20mm nominal size) |
| 46 | Providing Tor steel reinforcement of 10 mm 12 mm & 16 mm dia. bars as per approved design and drawing excluding carriage of M.S. rods (straight or in coils) to work site, cutting, bending and binding with annealed wire including the cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. ( For construction of protection chamber) (a) 10 mm & 12 mm |
| 47 | Supplying all necessary labour & materials, tools for doing electrical connection from electric pole to startar including wire all complete. |
| 48 | Supplying all necessary labour tools, etc. for lowering 2.00 H.P. submersible motor pump etc. all complete and taking out the same after ending Mela. |
| 49 | Providing and fixing 15 mm dia PTMT bib cock etc. all complete as per direction of E/I. |
| 50 | Providing Pump Operator cum plumber cum ekectrician to operate the pump for 3 shift water supply system on the ocassion of Holy Shrawani Mela.. |
| 51 | Providing and fixing Ball Valve of approved quality all complete, …job25 mm Ball valve |
| 52 | 32 mm Ball valve |
| 53 | Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB |
| 54 | Carriage of Polythene water storage tank , MS. Steel frame , and GI tank , PVC pipe, Electrical motor etc. from Divisional Deoghar store to work site & back after Mela is over including pipe, sintex etc. |
| 55 | Earth work in excavation in foundation trenches in hard soil (Vide Classification soil item B) and disposal of excavated earth as obtained to a distance up to 50 Mtr. including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I. (DWSD-3.1.1.1) from departmental store |
| 56 | Dismantling plain cement concrete work including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete BCD-5.10.2 |
| 57 | Supplying all materials, labour for construction of dameged stand post with R.C.C. ( 1:2:4) including GI/ PVC pipes and fittings etc. all complete as per direction of E/I. (With UPVC blue casing pipe support ). |
| 58 | Providing PCC M-200 with nominal mix of (1:1.5:3) with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of FM 2.5 to 3.0 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, sticking, curing , taxes and royalty all complete as per specification and direction of E/I. for construction of road cutting portion- BCD-5.3.1.1 |
| 59 | DistributionProviding and supplying High Density Polyethylene pipe (HDPE pipe) of 20 mm to 225 mm OD and pressure 6.0 Kg/cm2 and 10 Kg/cm2 suitable for water supply which is available in all standard conforming to ISI -- 4984/14151/12786/13488,ISO 4427 , DIN-8074 materials rates are Ex-factory excluding transportation, taxes and duties. PE-80 , PN- 10 (Item No-112M 1028)40 mm HDPE Pipe- |
| 60 | 20 mm HDPE Pipe- |
| 61 | Lowering, Laying and Jointing H. D. P. E./M. D.P. E. pipes in proper position including all specials by compression fitting/electro fusion and butt fusion jointing procedure as per relevant IS Code complete with all materials for jointing procedure like Electro fusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II. MJP 19-20 sec-I-IX sl 40 mm HDPE Pipe- |
| 62 | 20 mm HDPE Pipe- |
| 63 | Providing and supplying High Density Polyethylene (HDPE ) fittings of 20 mm to 225 mm OD and pressure 6.0 Kg/cm2 and 10 Kg/cm2 suitable for water supply which is available in all standard conforming to ISI -- 4984/14151/12786/13488,ISO 4427 , DIN-8074 materials rates are Ex-factory excluding transportation, taxes and duties. PE-80 , PN- 10 |
| 64 | Supplying of 15 mm dia G.I. pipes with Red lead and yarn of following nominal bore with screwed and socketed joints on wall, ceiling and floor including supplying and fitting of wall hooks or pipe clamps, wooden plugs, cutting pipes to size and threading ends if required etc. all complete as per specification and direction of Engineer-in-Charge. DWSD 3.1.2(i) |
| 65 | Supplying all materials , labour and tools for fixing 15 mm dia G.I. pipes with Red lead and yarn of following nominal bore with screwed and socketed joints on wall, ceiling and floor including supplying and fitting of wall hooks or pipe clamps, wooden plugs, cutting pipes to size and threading ends if required etc. all complete as per specification and direction of Engineer-in-Charge. DWSD 3.1.2(i) |
| 66 | Supplying and fixing G.I. fittings of approved make all complete as per specification and direction of E/I. DWSD 3.1.13(1) Elbow(a) 15 mm dia. |
| 67 | (2) Reducer Socket -(a) 20 x 15 mm dia. |
| 68 | (3) Nipple -(a) 15 mm dia. |
| 69 | (4) Plain Socket -(a) 15 mm dia. |
| 70 | Supplying and fixing G.M. ferrule of approved make in existing C.I./D.I. main Including drilling and taping C.I./D.I. main all complete as per specification and direction of E/I. 3 mm, 6 mm 10 mm dm ferrule weight not less than 425 gram. (JOSR DWSD 3.1.4.1) |
| 71 | Earth work in back filling the trenches after laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction of Engineer-in-Charge. (3.1.1.2) |
| 72 | Providing fitting & fixing 32 mm to 50 mm service HDPE saddle all complete job, as per approved design, specification and direction of E/I. (As per old model estimate) |
| 73 | Providing and fixing Fabricated M S frame structure with 4 leged L/ Sq pipe of stagging 1m for 500 litre water tank ,having sufficient bracing and base support with tilt protection bracing for tank fixed through fastnut arrangement at different location having weight around 65kg (approx)@RS 110 |
| 74 | Painting of MS. Steel frame and GI Tank (2 Nos GI tank and 5 Nos GI Stand ) |
| 75 | Providing and installing HDPE water storage tank/G.I. tank in position including GI fittings, socket, union etc. all complete including carriage of materials and taking out the same after ending Mela as per direction of E/I. |
| 76 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.20 mm nominal dia Pipes |
| 77 | Supplying Tractor with tractor having 2 hp diesel pump fitted on tanker on hire basis with licensed driver and helper with wages with all liabilities such as repair of vehicle if required during working period, accident expenses if any road tax etc. all but exclusive the cost of fuel such as diesel & lubricants, vehicle should be fit for running Paritran , Bhalua, Sarsa Minimum fuel consumption will be acceptable (avg.) (3 Km +3 Km water filling point) Vehicle |
| 78 | Kumaitha |
| 79 | Consumption 3 liter in each trip (2 nos. trip in each day) = 2 shift x 2 Tripx 3lits.=12.00 ltrs.Diesel |
| 80 | GST @18% |
| 81 | Labour Cess @1% Please Enable Macros to View BoQ information |