|
| 1 | 11/0.4 KV Distribution Transformer Increasing CapacityThe work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 2 | 250 KVA Distribution Transformer |
| 3 | LT XLPE CABLE 3.5x400 Sqmm |
| 4 | ABC CABLE 3x120+1x95+1x16 Sqmm |
| 5 | 11 KV FUSE SET |
| 6 | LINE MATERIAL (Insulator, Disc, X-Arm, Stay Set, Earthing ETC.) |
| 7 | Complete work of installing the electrical material received from the store center at the site. |
| 8 | Complete work of Laying/Installing LT ABC 3x120+1x95+1x16 Sqmm on the Established electric poles installed as per RESPO norms. |
| 9 | Complete work of Making New plinth (Size 2x2x1.5 Meter) for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. |
| 10 | Complete work of Installing and Commissioning 250 KVA Distribution Transformer on Established Plinth as per RESPO standards. Inculding Dismantling of 100 KVA distribution transformer installed at site. |
| 11 | Complete work of Making New Fencing for 250 KVA Distribution Transformer as per RESPO standards. In which Iron to make GRILL, cement, sand and other necessary Decentralized material (Like:- Welding Machine) will be provide by the Contractor/Firm. |
| 12 | Complete work of Chemical Earthing of established Distribution Transformer as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 13 | Complete work of Pipe Earthing (upto Water Level) of Established 250 KVA Distribution Transformer as per RESPO standards. |
| 14 | Complete work of Installing and Commissioning Tailless Fuse Unit Installation (Marble Stone Distribution Board Double Ckt with M S Angle Frame, Incomming/Outgoing Stud, Copper Bus Bar, Copper Fuse Strip 240x10x3 mm, Crimping Lugs , Nut & Bolts Complete in all Respect and all necessary decentralized material will be provide by the Contractor/Firm.) on established 11/0.4 KV 250 KVA Distribution Transformer as per RESPO standards. |
| 15 | Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards. |
| 16 | Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 17 | Supply of CLAMP with NUT & BOLT as per RESPO standards |
| 18 | Supply of DEAD & CLAMP as per RESPO standards |
| 19 | Supply of J-HOOK as per RESPO standards |
| 20 | Supply of AL. LUG LONG BARREL, OFF SIZE as per RESPO standards |
| 21 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 22 | 100 KVA Distribution Transformer (OLD & USED) |
| 23 | Installation New 11/0.4 KV Distribution Transformer The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 24 | 25 KVA Distribution Transformer |
| 25 | 100 KVA Distribution Transformer |
| 26 | 250 KVA Distribution Transformer |
| 27 | PCC Pole 8.5 Meter |
| 28 | PCC Pole 11 Meter |
| 29 | LT PVC CABLE 1x240 Sqmm |
| 30 | LT PVC CABLE 1x400 Sqmm |
| 31 | ACSR WEASEL Conductor |
| 32 | ABC CABLE 3x50+1x35+1x16 Sqmm |
| 33 | ABC CABLE 3x95+1x70+1x16 Sqmm |
| 34 | ABC CABLE 3x120+1x95+1x16 Sqmm |
| 35 | 11 KV FUSE SET |
| 36 | 3Ph LT DISTRIBUTION BOX |
| 37 | LINE MATERIAL (Insulator, Disc, X-Arm, Stay Set, Earthing ETC.) |
| 38 | Complete work of installing the electrical material received from the store center at the site. |
| 39 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. |
| 40 | Complete work of LT ABC 3x50+1x35+1x16 Sqmm on the Established electric poles installed as per RESPO norms. |
| 41 | Complete work of LT ABC 3x95+1x70+1x16 Sqmm on the Established electric poles installed as per RESPO norms. |
| 42 | Complete work of LT ABC 3x120+1x95+1x16 Sqmm on the Established electric poles installed as per RESPO norms. |
| 43 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 44 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 45 | Complete work of Installing and Commissioning 25 KVA Distribution Transformer on Established Double pole as per RESPO standards. |
| 46 | Complete work of Installing and Commissioning 100 KVA Distribution Transformer on Established Double pole as per RESPO standards. |
| 47 | Complete work of Making New plinth (Size 2x2x1.5 Meter) for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. |
| 48 | Complete work of Installing and Commissioning 250 KVA Distribution Transformer on Established Plinth as per RESPO standards. Inculding Dismantling of 100 KVA distribution transformer installed at site. |
| 49 | Complete work of Making New Fencing for 250 KVA Distribution Transformer as per RESPO standards. In which Iron to make GRILL, cement, sand and other necessary Decentralized material (Like:- Welding Machine) will be provide by the Contractor/Firm. |
| 50 | Complete work of Pipe Earthing (upto Water Level) of Established 250 KVA Distribution Transformer as per RESPO standards. |
| 51 | Complete work of Installing and Commissioning Tailless Fuse Unit Installation (Marble Stone Distribution Board Double Ckt with M S Angle Frame, Incomming/Outgoing Stud, Copper Bus Bar, Copper Fuse Strip 240x10x3 mm, Crimping Lugs , Nut & Bolts Complete in all Respect and all necessary decentralized material will be provide by the Contractor/Firm.) on established 11/0.4 KV 250 KVA Distribution Transformer as per RESPO standards. |
| 52 | Complete work of Installing and Commissioning 3P LT DISTRIBUTION BOX as per RESPO standards. |
| 53 | Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards. |
| 54 | Complete work of installation of Stay Set Complete with CONCRETING on Established Double pole As per the RESPO standards. |
| 55 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 56 | Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 57 | Supply of M.S. CHANNEL as per RESPO standards |
| 58 | Supply of M.S. ANGLE as per RESPO standards |
| 59 | Supply of CLAMP with NUT & BOLT as per RESPO standards |
| 60 | Supply of ALUMINIUM CRIMPING LUGS as per RESPO standards |
| 61 | Supply of CLAMP for 3 PH. Distribution Box as per RESPO standards |
| 62 | Supply of DEAD & CLAMP as per RESPO standards |
| 63 | Supply of SUSPENSION CLAMP as per RESPO standards |
| 64 | Supply of J-HOOK as per RESPO standards |
| 65 | Supply of NUT & BOLT as per RESPO standards |
| 66 | Supply of PC CONNECTOR as per RESPO standards |
| 67 | Strengthening & Protection Work of 11/0.4 KV Distribution Transformer (Tailless Unit) |
| 68 | Complete work of Installing and Commissioning Tailless Fuse Unit Installation (Marble Stone Distribution Board Double Ckt with M S Angle Frame, Incomming/Outgoing Stud, Copper Bus Bar, Copper Fuse Strip 240x10x3 mm, Crimping Lugs , Nut & Bolts Complete in all Respect and all necessary decentralized material will be provide by the Contractor/Firm.) on established 11/0.4 KV Distribution Transformer as per RESPO standards. Please Enable Macros to View BoQ information |