|
| 1 | 11 KV Line Construction & Bifurcation WorkThe work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 2 | PCC Pole 8.5 Meter |
| 3 | 11 KV VCB, O/G CTR 200/100/5A. 350 MVA |
| 4 | 11 KV OUTDOOR CABLE JOINTING KIT 3x120 Sqmm |
| 5 | 11 KV INDOOR CABLE JOINTING KIT 3x120 Sqmm |
| 6 | 11 kv STRAIGHT THROUGH 3x120 Sqmm |
| 7 | 11 KV XLPE CABLE 3x120 Sqmm |
| 8 | LINE MATERIAL (Insulator, Disc, Earthing, Stay set ETC.) |
| 9 | Complete work of installing the electrical material received from the store center at the site. |
| 10 | Complete work of installation and commissioning of New 11 KV VCB, O/G CTR 200/100/5A. 350 MVA at 33/11 KV sub-station. as per RESPO standards. Including WORK OF Laying / Installing 11 KV XLPE CABLE 3x120 Sqmm (100 Mtr.) |
| 11 | Complete work of Pipe Earthing (upto Water Level) of Established 11 KV VCB, O/G CTR 200/100/5A. 350 MVA 24 VOLT. as per RESPO standards. |
| 12 | Complete work of Laying/Installing ARMOURED CONTROL CABLE at 33/11 KV Sub-station. as per RESPO norms. |
| 13 | Complete work of UNDERGROUND Installing 11 KV XLPE CABLE 3x120 Sqmm on the site as per RESPO norms. In which bricks, sand, cement and other necessary decentralized materials will be provide by the contractor / Firm. |
| 14 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 15 | Complete work of installation of Stay Set Complete with CONCRETING on Established Double pole As per the RESPO standards. |
| 16 | Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x120 Sqmm, as per RESPO standards. |
| 17 | Complete work of Installing and Commissioning of 11 KV INDOOR CABLE JOINTING KIT 3x120 Sqmm, as per RESPO standards. |
| 18 | Complete work of Installing and Commissioning of 11 KV STRAIGHT THROUGH, as per RESPO standards. |
| 19 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 20 | Supply of M.S. CHANNEL as per RESPO standards |
| 21 | Supply of M.S. ANGLE as per RESPO standards |
| 22 | Supply of ARMOURED CONTROL CABLE 2x2.5 Sqmm as per RESPO standards |
| 23 | Supply of SUSPENSION CLAMP as per RESPO standards |
| 24 | Supply of NUT & BOLT as per RESPO standards |
| 25 | Strengthening Work of 33 KV LineThe work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 26 | PCC Pole 11 Meter |
| 27 | ACSR DOG Conductor |
| 28 | 33 KV FUSE SET |
| 29 | 33 KV LIGHTENING ARRESTOR |
| 30 | 33 KV LINE ISOLATOR |
| 31 | 33 KV BUS ISOLATOR |
| 32 | LINE MATERIAL (Insulator, Disc, Earthing, Stay set ETC.) |
| 33 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 34 | Complete work of Laying/Installing ACSR DOG CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
| 35 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 36 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 37 | Work of Fixing/Installing Four Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm. |
| 38 | Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 39 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 40 | Complete work of installation of Stay Set Complete with CONCRETING on Established Double pole As per the RESPO standards. |
| 41 | Complete work of Installing and Commissioning 33 KV Fuse Set as per RESPO standards. |
| 42 | Complete work of Installing and Commissioning 33 KV Lightening Arrestor as per RESPO standards. |
| 43 | Complete work of Installing and Commissioning 33 KV Line Isolator as per RESPO standards. |
| 44 | Complete work of Installing and Commissioning 33 KV Bus Isolator as per RESPO standards. |
| 45 | Complete work of Making New Structure Including Plinth and Foundation as per RESPO standards. In which all necessary Decentralized materials Like:- Channel/Angle/Cement/Sand or Other material will be provide by the contractor / Firm. |
| 46 | Complete work of Oil Centrifusing of Established 05 MVA Power Transformer Installaed at Various 33/11 KV Substation as per RESPO standards. The work of removing and adding oil will be included. |
| 47 | Complete work of Oil Centrifusing of Established 10 MVA Power Transformer Installaed at Various 33/11 KV Substation as per RESPO standards. The work of removing and adding oil will be included. |
| 48 | Providing & Replacement of HT Bushing Rod of Established Power Transformer Installaed at Various 33/11 KV Substation as per RESPO standards. Connection Related work will be included. |
| 49 | Providing & Replacement of LT Bushing Rod of Established Power Transformer Installaed at Various 33/11 KV Substation as per RESPO standards. Connection Related work will be included. |
| 50 | Providing & Replacement of LT Bushing of Established Power Transformer Installaed at Various 33/11 KV Substation as per RESPO standards. Connection Related work will be included. |
| 51 | Providing & Replacement of OIL Leakage Packing Seal of Established Power Transformer Installaed at Various 33/11 KV Substation as per RESPO standards. Connection Related work will be included. |
| 52 | Providing of W.T.I. (Winding Temperature Indicator) & Complete Installing and Commissioning established Power Transformer at Various 33/11 KV Substations with Replace Burnt Wire & Repair W.T.I. Box as per RESPO norms. In which all necessary Decentralized materials will be provide by the contractor / Firm. |
| 53 | Providing of O.T.I. (OIL Temperature Indicator) & Complete Installing and Commissioning established Power Transformer at Various 33/11 KV Substations with Replace Burnt Wire & Repair O.T.I. Box as per RESPO norms. In which all necessary Decentralized materials will be provide by the contractor / Firm. |
| 54 | Complete work of DELTA Earthing of Established Power Transformer at 33/11 KV Makhiyali Substation as per RESPO standards. |
| 55 | Supply of X-ARM HOLDING CLAMP with NUT & BOLT as per RESPO standards |
| 56 | Supply of F-BRACKET as per RESPO standards |
| 57 | Supply of STONE PAD as per RESPO standards |
| 58 | Supply of M.S. CHANNEL as per RESPO standards |
| 59 | Supply of M.S. ANGLE as per RESPO standards |
| 60 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 61 | ACSR DOG CONDUCTOR (OLD & USED / SCRAP) |
| 62 | ACSR STP MATABLE (OLD & USED / SCRAP) |
| 63 | Strengthening Work of 11 KV LineThe work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 64 | PCC Pole 8.5 Meter |
| 65 | PCC Pole 09 Meter |
| 66 | PCC Pole 11 Meter |
| 67 | ACSR Weasel Conductor |
| 68 | ACSR Rabbit Conductor |
| 69 | 11 KV XLPE CABLE 3x70 Sqmm |
| 70 | 11 KV XLPE CABLE 3x120 Sqmm |
| 71 | 11 KV OUTDOOR CABLE JOINTING KIT 3x70 Sqmm |
| 72 | 11 KV OUTDOOR CABLE JOINTING KIT 3x120 Sqmm |
| 73 | LINE MATERIAL (Insulator, Disc, Earthing, Stay set ETC.) |
| 74 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 75 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
| 76 | Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
| 77 | Complete work of UNDERGROUND Laying / Installing 11 KV XLPE CABLE 3x120 Sqmm on the site as per RESPO norms. |
| 78 | Complete work of Laying / Installing 11 KV XLPE CABLE 3x70 Sqmm on the Established electric poles installed as per RESPO norms. |
| 79 | Complete work of Laying / Installing 11 KV XLPE CABLE 3x120 Sqmm on the Established electric poles installed as per RESPO norms. |
| 80 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
| 81 | Complete work of installation of Stay Set Complete with CONCRETING on Established Double pole As per the RESPO standards. |
| 82 | Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x70 Sqmm as per RESPO standards. |
| 83 | Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x120 Sqmm as per RESPO standards. |
| 84 | Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 85 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
| 86 | Complete work of Tying/Binding Number Plate on establishing Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 87 | Complete work of Tying/Binding Danger Board on establishing Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 88 | Complete work of Tying Barbed Wire on establishing Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. |
| 89 | Supply of NUT & BOLT as per RESPO standards |
| 90 | Supply of F-BRACKET as per RESPO standards |
| 91 | Supply of X-ARM HOLDING CLAMP with NUT & BOLTS as per RESPO standards |
| 92 | Supply of STONE PAD as per RESPO standards |
| 93 | Supply of CLAMP for POLE as per RESPO standards |
| 94 | Supply of E-BRACKET as per RESPO standards |
| 95 | Supply of NUMBER PLATE with CLAMP NUT & BOLTS as per RESPO standards |
| 96 | Supply of DANGER PLATE with CLAMP NUT & BOLTS as per RESPO standards |
| 97 | Supply of G.I. BARBED WIRE as per RESPO standards |
| 98 | Supply of LT SHACKLE INSULATOR as per RESPO standards |
| 99 | Supply of CLAMP for LT SHACKLE INSULATOR as per RESPO standards |
| 100 | Supply of M.S. CHANNEL as per RESPO standards |
| 101 | Supply of M.S. ANGLE as per RESPO standards |
| 102 | SUNDRIES ITEMS |
| 103 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 104 | ACSR WEASEL CONDUCTOR (OLD & USED / SCRAP) |
| 105 | ACSR STP MATABLE (OLD & USED / SCRAP) |
| 106 | 11 KV VCB WorkThe work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 107 | 11 KV VCB, I/C CTR 600/300/5A. 350 MVA 24 VOLT |
| 108 | 11 KV VCB, O/G CTR 200/100/5A. 350 MVA |
| 109 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 110 | Complete work of Removal of old / damaged 11 KV VCB establishing at 33/11 KV sub-station and installation and commissioning of new 11 KV VCB, I/C CTR 600/300/5A. 350 MVA 24 VOLT. as per RESPO standards. |
| 111 | Complete work of Removal of old / damaged 11 KV VCB establishing at 33/11 KV sub-station and installation and commissioning of new 11 KV VCB, O/G CTR 200/100/5A. 350 MVA. as per RESPO standards. |
| 112 | Complete work of Pipe Earthing (upto Water Level) of Established 11 KV VCB, I/C CTR as per RESPO standards. |
| 113 | Complete work of Pipe Earthing (upto Water Level) of Established 11 KV VCB, O/G CTR as per RESPO standards. |
| 114 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 115 | 11 KV VCB I/C & O/G (OLD & USED) |
| 116 | Switch Yard WorkThe work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 117 | 33 KV LINE ISOLATOR 800 Amp. |
| 118 | 33 KV BUS ISOLATOR 800 Amp. |
| 119 | 33 KV LIGHTENING ARRESTOR |
| 120 | ACSR Dog Conductor |
| 121 | LINE MATERIAL (Insulator, Disc, Earthing, Stay set ETC.) |
| 122 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 123 | Complete work of Laying/Installing ACSR DOG CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
| 124 | Complete work of Installing and Commissioning 33 KV Line Isolator as per RESPO standards. |
| 125 | Complete work of Installing and Commissioning 33 KV Bus Isolator as per RESPO standards. |
| 126 | Complete work of Installing and Commissioning 33 KV Lightening Arrestor as per RESPO standards. |
| 127 | Complete work of Making New Structure Including Plinth and Foundation as per RESPO standards. In which all necessary Decentralized materials Like:- Channel/Angle/Cement/Sand or Other material will be provide by the contractor / Firm. |
| 128 | Complete work of Making New Structure Including Plinth and Foundation for Lightening Arrestor as per RESPO standards. In which all necessary Decentralized materials Like:- Channel/Angle/Cement/Sand or Other material will be provide by the contractor / Firm. |
| 129 | Complete work of Pipe Earthing (upto Water Level) of Established 33 KV LINE ISOLATOR as per RESPO standards. |
| 130 | Supply of PG CLAMP for DOG Con. as per RESPO standards |
| 131 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
| 132 | MATABLE / IRON SCRAPE (OLD & USED) Please Enable Macros to View BoQ information |