| 1 | Description |
| 2 | Supply and delivery of air cooled 8.5 TR Ductable type Air Conditioner nominal cooling capacity 25500 K.Cal/hr. at ISI condition suitable for operation on 415 V, ± 5%, 50 Hz. three phase AC supply. Each unit consists of 1 no. 8.5 TR Scroll compressor along with 8.5 TR AHU and Micro processor based control panel.(Refrigerant-R410A), Make-Mitsubishi/Carrier/Blue Star/Hitachi/Daikin. |
| 3 | Installation, testing and commissioning of 8.5 TR Ductable type Air-Conditioner. (Necessary dismantling of existing machine / equipment/ fixtures/ cables etc. also included). |
| 4 | Supply and delivery of air cooled 5.5 TR Ductable type Air Conditioner nominal cooling capacity 16500 K.Cal/hr. at ISI condition suitable for operation on 415 V, ± 5%, 50 Hz. three phase AC supply. Each unit consists of 1 no. 5.5 TR Scroll compressor along with 5.5 TR AHU and Micro processor based control panel.(Refrigerant-R410A), Make-Mitsubishi/Carrier/Blue Star/Hitachi/Daikin. |
| 5 | Installation, testing and commissioning of 5.5 TR Ductable type Air-Conditioner (Necessary dismantling of existing machine / equipment/ fixtures/ cables etc. also included). |
| 6 | Supply and delivery of Concealed type Air Conditioning Condenser Unit with 60000 btu/hr Cooling capacity, with 2 nos Twin Rotary compressor, 415V ( ± 5%)/3 PH/50 Hz, of 5.0 TR nominal capacity with R410A Refrigerant. (Make: Hitachi/Mitsubishi/Carrier/Blue Star/Daikin) |
| 7 | Installation, testing and commissioning of 5.0 TR Ductable type Air-Conditioner. |
| 8 | AC machine lifting, shifting, loading &unloading (Lifting & shifting charges of AC outdoor unit to the respective 5th floor or as required. The ODU is to be installed on suitable size of MS structure & platform on terrace/ chajja / outside wall as directed as per site condition. The platform to be made by 6mm thick U channel (75mm x 40m x 40mm) to hold the ODU by nuts & bolts, it's legs are to be grouted by using cement & sand etc., strong enough to take the load of the machine & providing vibration pads etc. as required.) |
| 9 | Testing (Proper leak testing of entire refrigeration pipelines with dry nitrogen. Leakage rectification, brazing arrangement, system vacuuming & Gas charging etc. as required.) |
| 10 | Supply of 3/8\\" Drier. |
| 11 | Supply of Refrigerant (R410A). |
| 12 | Cutting, dismantling and shifting of existingmain/branch duct, cables, pipes (Dismantling of old existing ductable (5 TR) AC machine outdoor unit on fifth floor, lifting & shifting the same with suitable arrangements to the ground floor level maintaining all safety precautions/standards as per site requirement. Making the floor suitable for future installation job & restoring the building work if damaged/required. (Necessary dismantling of existing machine / equipment/ fixtures/ cables etc also included). |
| 13 | Supply, installation, testing & commissioning of 1.1/8\\" or equivalent suitable size hard/soft drawn Copper refrigeration pipelines with insulation ( as per OEM recommendation) providing necessary fittings, support, fixture, etc. and brazing arrangement. Proper leak testing of entire refrigeration pipelines with dry nitrogen. |
| 14 | Supply, installation, testing & commissioning of 5/8\\" or equivalent suitable size hard/soft drawn Copper refrigeration pipelines with insulation ( as per OEM recommendation) providing necessary fittings, support, fixture, etc. and brazing arrangement. Proper leak testing of entire refrigeration pipelines with dry nitrogen. |
| 15 | Supply, installation, testing & commissioning of 7/8\\" or equivalent suitable size hard/soft drawn Copper refrigeration pipelines with insulation ( as per OEM recommendation) providing necessary fittings, support, fixture, etc. and brazing arrangement. Proper leak testing of entire refrigeration pipelines with dry nitrogen. |
| 16 | Supply, installation, testing & commissioning of 1/2\\" or equivalent suitable size hard/soft drawn Copper refrigeration pipelines with insulation ( as per OEM recommendation) providing necessary fittings, support, fixture, etc. and brazing arrangement. Proper leak testing of entire refrigeration pipelines with dry nitrogen. |
| 17 | Supply, installation, testing & commissioning of control cable 6 core x 1.5 sq.mm. PVC insulated armoured copper cable with 2 nos. 12 SWG copper earth wire (or suitable as per site requirement) with necessary supporting clamp/spacers & saddles etc between IDU & ODU of AC units complete with all accessories including incoming & outgoing connection complete. Dismantling of existing controlling cable is also included. (Cable make: Finolex, Polycab, Gloster/PWD approved as per direction of EIC). |
| 18 | Supply, installation, testing & commissioning of power cable 4 core x 6 sq.mm. XLPE insulated armoured copper cable with 2 nos. 10 SWG GI earth wire with necessary supporting clamp/spacers & saddles etc for power supply from power supply point with all accessories including incoming & outgoing connection complete. Dismantling of existing power cable is also included. (Cable make: Finolex, Polycab, Gloster/PWD approved as per direction of EIC). |
| 19 | Supply of Canvas & necessary connection withmodification as per site requirement. |
| 20 | Installation of ODU (The ODU is to be installed on suitable size of MS structure & platform on terrace/ chajja / outside wall as directed as per site condition. Supplying, fabrication & fixing of M.S.structure with U-channel of 6mm thick of size (75mm x 40 mm x 40 mm) for making platform for installation of outdoor unit of 8.5TR/5.5TR Ductable split AC including drilling 4 nos holes in each channel including cutting holes into the wall & grouting the same with cement concrete etc as per site requirement.) |
| 21 | AC machine lifting, shifting, loading & unloading (Lifting & shifting charges of 8.5TR/5.5TR AC units (IDU & ODU) to the respective 3rd floor or as required.) |
| 22 | AC machine lifting, shifting, loading & unloading (Shifting charges of dismantled 7.5TR/5TR AC units (IDU & ODU ) from 3rd floor of the building.) |
| 23 | Supply of Refrigerant (R22). Please Enable Macros to View BoQ information |