| 1 | Safe loading & carriage, including Loading-unloading & proper stacking at a Place of following store materials from ESC Tripula to work site. |
| 2 | 11 KV VCB INCOMMING 600/300/5A-350 MVA-01 No. |
| 3 | 11 KV JOINTING KIT INDOOR CABLE FOR 3X300 Sq mm XLPE Cable. |
| 4 | 11 KV VCB OUTGOING 200/100/5A-350 MVA Nos |
| 5 | 11 KV JOINTING KIT OUT DOOR CABLE FOR 3X185 Sq. mm XLPE Cable. |
| 6 | 33 KV VCB 1250 A |
| 7 | 111 KV CT 400/200/1-1-A |
| 8 | 33 KV PT OUTDOOR 33KV/110 |
| 9 | 33 KV CONTROL PANNEL FOR SINGLE FEEDER |
| 10 | STRUCTURE FOR 33 KV VCB, CT & PT |
| 11 | ARMOURED CABLE 4X2.5 Sq. |
| 12 | ARMOURED CABLE 2X2.5 Sq. |
| 13 | Recd. back of (02 Nos 11 KV VCB IINCOMMING) & 07 Nos 11KV VCB (OUTGOING) and other Materials etc. from dump site to ESC Tripula, Raebareli alongwith loading unloading. |
| 14 | Labour and Errection Charges:- |
| 15 | Dismantling of old /Damaged 11 KV VXB PANNEL FROM BUS BAR THEN STACKING OF DUMP SITE WITH LOADING UNLOADING. |
| 16 | Complete Installation of 11 KV VCB INCOMMING 600/300/5A-350 MVA with all required accessories, as per RESPO Norms. |
| 17 | Complete Installation of 11 KV JOINTING KIT INDOOR CABLE FOR 3X300 Sq mm XLPE Cable. with all required accessories, as per RESPO Norms. |
| 18 | Installation of11 KV VCB OUTGOING 200/100/5A -350MVAwith all required accessories at 33/11 S/S KATGHAR Dalmau, as per RESPO Norms. |
| 19 | Complete Installation of 11 KV JOINTING KIT OUTDOOR CABLE FOR 3X185 Sq.mm XLPE Cable, as per RESPO Norms. |
| 20 | Fixing/ TIGHTENDING / PROVIDING OF SUNDARY ITES AS LUGS, CLAMPS AND NUTS & BOLT., Asa per Required. |
| 21 | Dragging of 33 KV VCB PANNEL to work place then Complete Installation of 33 KV VCB Pannel alongeith related all accessories, as per RESPO Norms. |
| 22 | Dragging of 33 KV CT 400/200/1-A and 33 KV Outdoor PT 33KV/110 to work place then Complete Installation of CT & PT alongeith related all accessories, as per RESPO Norms. |
| 23 | Dragging of 33 KV CONTROL PANNEL to work site then installaltion of new 33 KV Control Pannel, alongwith Fitting of all required accessories as per RESPO Norms. |
| 24 | INSTALATION/ OF 3 Nos STRUCTURE FOR Mounting of 33 KV VCB, CT & PT with Fitting of all required accessories as per RESPO Norms..all required material provided by contractor. |
| 25 | Making/Fixing/Installation of ARMOURED Control CABLE 4X2.5 SQ CABLE and ARMOURED CABLE 2X2.5 SQ as per RESPO Norms.all material provided by contractor. Please Enable Macros to View BoQ information |