| 1 | Safe carriage of oil storage tank of 20kL including loading, unloading & carriage upto the site of approx.. 75Km. from132 KV Sub-station, Shahabad to 132 KV Sub-station Baghauli |
| 2 | Complete safe dismantling of the accessories of 132/33 kV 20 MVA Transformer including opening of jumpers, removal of earthing, removal of bushings, conservator tank, pipe lines, cooling fans, marshalling box, radiator with oil drain from radiator, opening of control cable sand fixing of blanking plates on the radiators, pipelines, conservator tanks, turret etc. with proper stacking. All men, material, T&P including Nuts & Bolts shall be provided by contractor. |
| 3 | Dismantling of RTCC panel of 20 MVA T/F including disconnection of cables, cutting of earthing and shifting of panel to store. |
| 4 | Dismantling of following equipment’s with due opening of jumpers, earthing, cable connections, nut bolts and proper shifting to store:- |
| 5 | 145kV CT (400-200/1Amp) 0.2 accuracy class |
| 6 | 120kV LA with structure |
| 7 | 36kv CT, 400/1Amp, 3 core |
| 8 | Old C&R panel of 20 MVA T/F & 40 MVA T/F including opening of all cable connection, cutting of earthng and shifting from control, room to store. |
| 9 | Shifting of oil filled main tank of dismantled 132/33kV 20 MVA T/F from plinth upto 20 metre distance including turning of tank if required with all T&P, manpower to be provided by contractor to complete the job in all respect. |
| 10 | Additional shifting of dismantled 132/33kV 20 MVA T/F main tank upto 100 meter distance (01 Job for every 5 meter). |
| 11 | Shifting of oil filled main tank of new 132/33kV 63MVA T/F plinth 20 metre distance to including turning of tank if required with all T&P, manpower to be provided by contractor to complete the job in all respect. |
| 12 | Additional shifting of new 132/33kV 63 MVA T/F main tank upto 50 meter distance (01 Job for every 5 meter). |
| 13 | Complete erection of 132/33kV 63 MVA T/F including erection of radiator, conservator tank, all bushings, turrets, bucholz relay, connecting pipes, cooling fans, motor drive mechanism of OLTC, breather, PRV, OSR etc all other associated works to complete the job in all respect. All T&P shall be provided by contractor at his own cost. |
| 14 | Centrifuging of oil in main transformer tank un-interrupted till the desired BDV and PPM of oil is achieved including recording of all the parameters hourly such as temperature, BDV, PPM , Vacuum etc. Centrifuging machine, operator, lubricant and all T&P shall be provided by the contractor. |
| 15 | Erection of following equipment’s with due opening of jumpers, earthing, cable connections, nut bolts and proper shifting to store:- |
| 16 | 145kV CT (400-200/1Amp) 0.2s accuracy class with JB |
| 17 | 120kV LA with structure |
| 18 | 36kv CT,1250/1Amp, 3 core |
| 19 | Erection of new C&R panel for 63 MVA T/F & 40 MVA T/F including shifting from store to control room upto erection place by providing and fixing of anchor fasteners, earthing and erection of panel with all accessories as per drawing for proper function of TNC switch and all protection relays in all respect |
| 20 | Laying of control cable of following sizes from C&R panel to CB, JB , MB as per cable schedule with due opening of cable trench and proper cable dressing to complete the job in all respect. |
| 21 | 2Cx2.5sqmm |
| 22 | 4cx2.5sqmm |
| 23 | 6Cx2.5sqmm |
| 24 | Termination of control cable of various equipment’s of switchyard to C&R panel, JB, CB, MCB with proper glanding, ferruling and lugging as per drawing with all associated works to complete the job in all respect |
| 25 | Earthing of Main tank, Marshalling box, Drive mechanism, Transformer neutral etc of new 63MVA T/F, 145kv CTs, & Control Panel of 120 LV LAs along with their JB with MS flats of following sizes which includes providing, cutting, welding, strengthening and bending of MS Flat and shifting of materials from store to site to complete the job in all respect:- (All materials including MS Flat shall be provided by contractor) |
| 26 | 75x10 mm |
| 27 | 50x6 mm |
| 28 | 25x6 mm |
| 29 | Painting of MS flats by rubbing with sand paper and then painting with 1 coat of red oxide primer and 2 coats of 1st quality synthetic enamel paint of make Aisan/Berger/Nerolac in bus green colour including vertical support. (All materials including paints shall be provided by contractor to complete the job in all respect). |
| 30 | 75x10 mm |
| 31 | 50x6 mm |
| 32 | 25x6 mm |
| 33 | Jumpering of all 3 HV Bushing of Transformer with ACSR panther conductor which includes cutting and clamping of conductor. |
| 34 | Jumpering of all 3 LV Bushing of Transformer with twin ACSR panther conductor which includes cutting and clamping of conductor. |
| 35 | Erection and installation of RTCC panel of 63 MVA T/F along with shifting from storage place to control room including termination and connection of control cables at RTCC panel as well as transformer MB side as per drawing to complete the job in all respect. All cable glands, ferrules and lugs and other T&Ps to be provided by the contractor on his own cost. |
| 36 | Cable termination along with laying of new cable if required as per drawing and cable schedule of 63 MVA T/F its cooling fans, marshalling box, all relays using existing cable for proper functioning of fans in both Manual and Auto Mode. |
| 37 | Proper packing of all bushings of dismantled transformers including wrapping with polythene sheets in the wooden carrets (shall be provided by the contractor) with proper shifting and stacking in the store. |
| 38 | Obtaining NOC from office of electrical Safety Directorate Lucknow for first time energization of 63 MVA T/F (including payment of fee as per challan) |
| 39 | Providing & fixing of Glow sign board of size 8 ft x 6 ft for updated single line diagram to be fixed in the control room of sub-station. The glow sign board shall be illuminated with LED lights in sufficient qty. the board shall be made of Acrylic sheet and shall be provided by back support frame & fixing arrangement. |
| 40 | Providing & fixing of name plate of 2mm thick aluminium sheet with retro reflective sheet of size 300x200mm with details/name written as per prescribed colour scheme to be fixed with the help of suitable size nuts & bolts as already installed structure of equipment’s in the switchyard with all cost of plate nuts & bolts, T&P and labour as per direction of supervising engineer. |
| 41 | Retro reflective sign board of size 10 Ft. x 06 Ft. duly made of 2 mm thick aluminium sheet fully covered with 3 M. DG Cube type retro reflective sheet of yellow colour. The letters & symbols shall be computer cut & in blue colour. Board is to be provided alongwith back support frame made of M.S. angle of size 35mm x 35mm x 05 mm with provision of two legs for grouting duly painted in black colour enamel paint and the back side of the aluminium sheet shall be painted with stove enamel paint complete in all respect and to be grouted with casting of CC (1:2:4) foundation at the sub-station. |
| 42 | Dismantling of existing 33 KV 2x5 MVAR Capacitor Bank. |
| 43 | Opening of all connected jumpers. |
| 44 | Dismantling of 36 KV NCT |
| 45 | Dismantling of 03 Phase reactor oil cooled |
| 46 | Dismantling capacitor Cell 24 microfarad (5 MVAR each set) include support frame. |
| 47 | Erection of new 33 KV 2x5 MVAR Capacitor Bank. |
| 48 | Capacitor cells 24 microfarad (5 MVAR each set), |
| 49 | Series Reactor |
| 50 | Fabrication & connection of moose / panther & panther/panther jumpers complete in all respect. |
| 51 | 33 KV Capacitor bank bay both sides control cable terminations on CT, CB, PT and control & relay panel etc. As per drawing including cost of cable glands, lugs and ferrules except control cable complete as per drawing & site requirement. |
| 52 | Laying of control cable 1.1 KV unarmored 4Cx2.5 sqmm for new 33 KV Capacitor bank unit. |
| 53 | Laying of control cable 1.1 KV unarmored 6Cx2.5 sqmm for new 33 KV Capacitor bank unit. |
| 54 | Earthing of new 33 KV capacitor bank unit & its equipments alongwith structure with 50x6 mm MS flats of following sizes which includes providing, cutting, welding, strengthening and bending of 50x6 mm MS Flat and shifting of materials from store to site to complete the job in all respect:- (MS Flat shall be provided by contractor) |
| 55 | Painting of 50x6mm MS flats by rubbing with sand paper and then painting with 1 coat of red oxide primer and 2 coats of 1st quality synthetic enamel paint of make Aisan/Berger/Nerolac in bus green colour including vertical support. (All materials including paints shall be provided by contractor to complete the job in all respect). |
| 56 | Scada integration of C&R Panel of 63 MVA & 40 MVA T/F, refurbishment of existing old SCADA system and installation of new gateway for remote data communication to SLDC/ ALDS:- |
| 57 | IEC-61850 Based SCADA configuration & its integration of new C&R Panel of HV bay of 63 MVA & 40 MVA T/F with existing SCADA (Siemens) includes work bay IED'S ICD files configuration, database creation for new bay, event, alarm generation, interlock & soft logic configuration and testing if any, GPS time synchronisation etc. to complete the work in all respects for proper operation of equipments with SCADA. |
| 58 | IEC-61850 Based SCADA configuration & its integration of new C&R Panel of LV bay of 63 MVA & 40 MVA T/F with existing SCADA (Siemens) includes work bay IED'S ICD files configuration, database creation for new bay, event, alarm generation, interlock & soft logic configuration and testing if any, GPS time synchronisation etc. to complete the work in all respects for proper operation of equipments with SCADA. |
| 59 | Supply of armored fibre optical cable (6 fibre) suitable for communication between LIU to LIU in SAS system. |
| 60 | Supply of fiber optical multimode patch cord for ST-MTRJ ports (each 3/5 meters). |
| 61 | Supply of fiber optical multimode patch cord for LC-LC ports (each 10 meters). |
| 62 | Supply of fiber optical multimode patch cord for ST-ST ports (each 10 meters). |
| 63 | Providing & Installation of New Gateway for remote data configuration to SLDC/ALDS with Licence and its application software as per following specifications:(1) Multiple- master communication capability. (2) Support IEC60870-5-101/103/104, DNP3 serial/TCР MODBUS RTU/ ASCII/ TCP, IEC62056-DLMS, IEC61850, SNMP, SNTP, MQTT(3) Data Point support:- 5000 1.03 1.04 (4) Port Connectors:- 4 serial (RS22/485) and 2 Ethernet. (5) Power Supply (AC-DC) 85-265V AC 50-60 Hz, 100- 370V DС. (6) Reliability:- IEC61850-3 complitanat Hardware, DNV certified IEC61850 server, HOT- Standby redundancy specific Synchronisation (IEC104/DNP 3.0 etc.) Suitable for existing ALSTOM make SCADA system installed at 132KV S/S Sarila, including Installation work and all software configurations and its Testing as per site condition and all other associated work required to complete the job satisfactorily. |
| 64 | Work of Gateway remote data configuration to SLDС (Sending Data to remote station on protocol at IEC-101). Work includes: (a) Complete checking of SAS gateway panel including artchitecture and settings.(b) Programming and Configuration of gateway with addresses & settings (provided by client) to link from Sub-Station to Data centre- Lucknow. (c) Complete Testing of SAS gateway and complete Data communication & Validation b/w Sub-station to Data centre, Lucknow. (Firm shall ensure proper uninterrupted Data Transmission to ALDS for at least Six months free of cost.) |
| 65 | Work of Gateway remote data configuration to ALDS (Sending Data to remote station on protocol at IEC-104). Work includes: (a) Complete checking of SAS gateway panel including artchitecture and settings. (b) Programming and Configuration of gateway with addresses & settings (provided by client) to link from Sub-station to Data centre- Modipuram. (c) Complete Testing of SAS gateway and complete Data communication & Validationb b/w Sub-station to Data centre, Lucknow and Modipuram. (Firm shall ensure proper uninterrupted Data Transmission to ALDS for at least Six months free of cost.) |
| 66 | Configuration and refurbishment of existing old SCADA system.The work shall include following services for smooth and healthy SCADA operation :-(i)Checking of all required events, alarms, dates, signal to SCADA from various bays and BCUs(ii)Modification of SCADA system of old & existing bays as per requirement(iii)Checking and rectifying healthiness of existing IEC61850-7 Ethernet switch in existing panel(iv)Checking defective FO cable and its rectification(v)Checkin and rectifying of communication of protection relays with SCADA. |
| 67 | Supply of HMI Servers Industrial Grade System (HMI and CPU) :-32 inch HMI and 7 Core i7 processor, 8 GBRAM, 1TB Hard dusk with operating system Latest Window 64-bit |
| 68 | Providing and installation of GPS unit with Slave Clock including its commissioning |
| 69 | Supply of PG Clamp Panther/Panther |
| 70 | Supply of PG Clamp Moose/Moose |
| 71 | Supply of 33kv CT clamp for twin Moose |
| 72 | Supply of 33kv isolator clamp for twin panther |
| 73 | Supply of LED flood light 150 Watt of make Philips/Havells Please Enable Macros to View BoQ information |