| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge |
| 3 | Cement Concrete in (1:2:4) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 4 | Cement Concrete in (1:1.5:3) M-20 mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 5 | Providing and laying of C.C. M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material and T&p etc required for proper completion of work as directed by Engineer-in charge. |
| 6 | Steel reinforcement work in RCC including cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work |
| 7 | Providing centering & shuttering for ordinary CC work as required including all cost of labour, material and & T&P etc complete required for proper completion of work as directed by Engineerin charge |
| 8 | Providing centering & shuttering for all R.C.C. work as required including all cost of labour material and T&P etc complete required for proper completion of work |
| 9 | Providing and laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required including all cost of labour material and T&P etc complete required for proper completion of work. |
| 10 | providing and laying of pea gravel in bed and graded filter sand in filter including all cost of labour material and T&P etc. complete required for proper completion of work or as per Directed by engineer in charge. |
| 11 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work |
| 12 | Providing and laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. completion requierd for proper completion of work or as per Directed by Engineer in Charge. |
| 13 | Painting and finishing with water proof approved paint on all exposed surface including all cost of labour, material and T&P etc. complete required for proper completion of work. |
| 14 | Providing and fixing of 100 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work |
| 15 | Providing and Fixing of year Plate for proper completion of work |
| 16 | Providing and fixing of B.M Plate for proper completion of work |
| 17 | Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm) for proper completion of work |
| 18 | E/w in cutting or filling for making dirvesion and approach rod of VRB in ordinary soil in layers i/c cost of all labours T& P with ramming drassing upto required levels and slopes or gradient proper completion of work and required lead up to 1.00 Km distence from work site or as per directed by Engineer- in -charge. The earth from cutting to be used in making embankment or to be deposited is spoil bank within 30m distence as per directed by Engineer-in-charge. The rates will be made as per given table in case 1.00 km lead reduced in any condition.. |
| 19 | Supply & laying RBM for making hard base for traffic I/C icluding cost of all labour masonary T&P etc. required for proper complition of work. |
| 20 | Laying brick on soiling laid dry filling joints i/c all cost of material, labour T&P etc. for proper comp. of work. |
| 21 | Dismentaling Earh Work of diversion with its proper disposal incuding all material, labour, T&P etc. required for proper completion of the work. Please Enable Macros to View BoQ information |