|
| 1 | Supply of Following Matarial as per relevent ISS | Supply of Following Matarial as per relevent ISS |
| 2 | Stone Pad | Stone Pad |
| 3 | Cross Arm holding Clamp | Cross Arm holding Clamp |
| 4 | F-Braket/F clamp | F-Braket/F clamp |
| 5 | M.s Bolt & Nuts | M.s Bolt & Nuts |
| 6 | Danger Board | Danger Board |
| 7 | Suspension Clamp | Suspension Clamp |
| 8 | Dead End Clamp | Dead End Clamp |
| 9 | Eye Hook | Eye Hook |
| 10 | LT Clamp | LT Clamp |
| 11 | LT Shackle Insulator | LT Shackle Insulator |
| 12 | Clamp for Distribution Box | Clamp for Distribution Box |
| 13 | Pearcing Connector | Pearcing Connector |
| 14 | PG Clamp | PG Clamp |
| 15 | HDPE Pipe | HDPE Pipe |
| 16 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work. | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work. |
| 17 | Pcc Pole 8.5 Mtr. Long | Pcc Pole 8.5 Mtr. Long |
| 18 | Pcc Pole 11 Mtr. Long | Pcc Pole 11 Mtr. Long |
| 19 | 11 KV Steel Cross Arm V Type | 11 KV Steel Cross Arm V Type |
| 20 | 11 KV Pin Insulator With Pin | 11 KV Pin Insulator With Pin |
| 21 | ACSR weasel Conductor | ACSR weasel Conductor |
| 22 | Earthing Complete | Earthing Complete |
| 23 | Stay set Complete | Stay set Complete |
| 24 | LT AB Cable 3x120 sqmm | LT AB Cable 3x120 sqmm |
| 25 | LT AB Cable 3x95 sqmm | LT AB Cable 3x95 sqmm |
| 26 | Distribution Box | Distribution Box |
| 27 | LT AB Cable 1x25+1x16 sqmm | LT AB Cable 1x25+1x16 sqmm |
| 28 | 11 kv XLPE Cable 3x185 sqmm | 11 kv XLPE Cable 3x185 sqmm |
| 29 | Cable Jointing Kit Suitable for XLPE Cable 3x185 sqmm | Cable Jointing Kit Suitable for XLPE Cable 3x185 sqmm |
| 30 | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 31 | Pcc Pole 8.5 Mtr. Long | Pcc Pole 8.5 Mtr. Long |
| 32 | Pcc Pole 11 Mtr. Long | Pcc Pole 11 Mtr. Long |
| 33 | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work |
| 34 | Stone Pad | Stone Pad |
| 35 | Cross Arm holding Clamp | Cross Arm holding Clamp |
| 36 | F-Braket/F clamp | F-Braket/F clamp |
| 37 | M.s Bolt & Nuts | M.s Bolt & Nuts |
| 38 | Danger Board | Danger Board |
| 39 | 11 KV Steel Cross Arm V Type | 11 KV Steel Cross Arm V Type |
| 40 | 11 KV Pin Insulator With Pin | 11 KV Pin Insulator With Pin |
| 41 | Distribution Box | Distribution Box |
| 42 | Suspension Clamp | Suspension Clamp |
| 43 | Dead End Clamp | Dead End Clamp |
| 44 | Eye Hook | Eye Hook |
| 45 | LT Clamp | LT Clamp |
| 46 | LT Shackle Insulator | LT Shackle Insulator |
| 47 | PG Clamp | PG Clamp |
| 48 | Clamp for Distribution Box | Clamp for Distribution Box |
| 49 | Pearcing Connector | Pearcing Connector |
| 50 | Cable Jointing Kit Suitable for XLPE Cable 3x185 sqmm | Cable Jointing Kit Suitable for XLPE Cable 3x185 sqmm |
| 51 | HDPE Pipe | HDPE Pipe |
| 52 | Safe Dismenteling of STP/PCC Pole with opening of all HT/LT Jumpers, all works which required for dismentling of Pole. | Safe Dismenteling of STP/PCC Pole with opening of all HT/LT Jumpers, all works which required for dismentling of Pole. |
| 53 | Safe Dismenteling of AB Cable, 11 kv XLPE, ACSR Weasel conductor, all works which required for dismentling of Line. | Safe Dismenteling of AB Cable, 11 kv XLPE, ACSR Weasel conductor, all works which required for dismentling of Line. |
| 54 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 55 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 56 | Laying, sagging and stringing and jumpering /binding etc. of new & old ACSR Weasal conductor /GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. | Laying, sagging and stringing and jumpering /binding etc. of new & old ACSR Weasal conductor /GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. |
| 57 | ACSR weasel Conductor | ACSR weasel Conductor |
| 58 | LT AB Cable 3x120 sqmm | LT AB Cable 3x120 sqmm |
| 59 | LT AB Cable 3x95 sqmm | LT AB Cable 3x95 sqmm |
| 60 | LT AB Cable 1x25+1x16 sqmm | LT AB Cable 1x25+1x16 sqmm |
| 61 | 11 kv XLPE Cable 3x185 sqmm | 11 kv XLPE Cable 3x185 sqmm |
| 62 | Underground Digging & Laying of 11 kv Cable in Trench with sand & Brick as per RESPO | Underground Digging & Laying of 11 kv Cable in Trench with sand & Brick as per RESPO |
| 63 | Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer | Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer |
| 64 | Back Cartage of Following Matarial and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work | Back Cartage of Following Matarial and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work |
| 65 | Iron Scrap | Iron Scrap |
| 66 | AB Cable Scrap | AB Cable Scrap |
| 67 | 11 kv Cable Scrap | 11 kv Cable Scrap |
| 68 | ACSR weasel Conductor Scrap | ACSR weasel Conductor Scrap |