| 1 | Should be of microcontroller technology driven ultra high frequency generator. | Should be of microcontroller technology driven ultra high frequency generator. |
| 2 | Output 50 KW or more. | Output 50 KW or more. |
| 3 | KVP range 40 KV – 125 KV or better | KVP range 40 KV – 125 KV or better |
| 4 | mA Range: 10 to 630 mA or better | mA Range: 10 to 630 mA or better |
| 5 | mAs Range: 500 mAs or more | mAs Range: 500 mAs or more |
| 6 | It should have digital display or KVP & mAs. | It should have digital display or KVP & mAs. |
| 7 | 8 Anatomical programming radiography should be possible. | 8 Anatomical programming radiography should be possible. |
| 8 | It should have overload protection | It should have overload protection |
| 9 | Digital AEC should be available on both planes | Digital AEC should be available on both planes |
| 10 | X Ray Generator and X ray Tube should be from the same manufacturer. | X Ray Generator and X ray Tube should be from the same manufacturer. |
| 11 | The X – Ray tube should be rotating anode, compatible with the generator and must have dual focus. | The X – Ray tube should be rotating anode, compatible with the generator and must have dual focus. |
| 12 | Tube with anode heat storage capacity 200000 HU or better. | Tube with anode heat storage capacity 200000 HU or better. |
| 13 | Multi leaf collimator having LED lamp/bright light source and auto shut provision for the light. | Multi leaf collimator having LED lamp/bright light source and auto shut provision for the light. |
| 14 | It should be floor mounted column stand. (No attachment to ceiling and no additional wires running/dangling around the machine) | It should be floor mounted column stand. (No attachment to ceiling and no additional wires running/dangling around the machine) |
| 15 | It should be fully counter balanced mechanism. | It should be fully counter balanced mechanism. |
| 16 | It should have facility to display KV and mA selection and display facility on a 7” inch or more touch screen with input set parameters. | It should have facility to display KV and mA selection and display facility on a 7” inch or more touch screen with input set parameters. |
| 17 | The cooling period between two exposures should be minimum 15 seconds | The cooling period between two exposures should be minimum 15 seconds |
| 18 | It should have emergency switch to disable all mechanical movements during emergency | It should have emergency switch to disable all mechanical movements during emergency |
| 19 | It should have indication for error and warning. | It should have indication for error and warning. |
| 20 | Table should be fixed, with 4 ways floating tabletop facility | Table should be fixed, with 4 ways floating tabletop facility |
| 21 | Should have minimum capacity of 200 Kgs. | Should have minimum capacity of 200 Kgs. |
| 22 | The unit should be provided with vertical bucky (with Removable Grid option) . | The unit should be provided with vertical bucky (with Removable Grid option) . |
| 23 | Dual Detector Digital Radiography System It should have provision to do chest radiography without grid. | Dual Detector Digital Radiography System It should have provision to do chest radiography without grid. |
| 24 | Should have in built bucky tray where orientation of bucky can be changed from landscape to portait mode. It should have facility for detector of sizing 14'' x 17''. | Should have in built bucky tray where orientation of bucky can be changed from landscape to portait mode. It should have facility for detector of sizing 14'' x 17''. |
| 25 | The detector should be of solid-state flat panel detector of latest technology with amorphous silicon and scintillator of Cesium Iodide | The detector should be of solid-state flat panel detector of latest technology with amorphous silicon and scintillator of Cesium Iodide |
| 26 | The size of the detector should be 35 cm x 43 cm or more. | The size of the detector should be 35 cm x 43 cm or more. |
| 27 | The resolution should be minimum of 3.0 lines pair/mm | The resolution should be minimum of 3.0 lines pair/mm |
| 28 | The pixel size should be 150 micrometers or less. | The pixel size should be 150 micrometers or less. |
| 29 | Detector Quantum Efficiency (D.Q.E) should be more than 72% @ Zero Line Pairs. | Detector Quantum Efficiency (D.Q.E) should be more than 72% @ Zero Line Pairs. |
| 30 | The active pixel matrix should be 2.3k x 2.8k or more. | The active pixel matrix should be 2.3k x 2.8k or more. |
| 31 | Detector should have Ingress Protection rating of IP68/IPX3/IP44 or better | Detector should have Ingress Protection rating of IP68/IPX3/IP44 or better |
| 32 | Detector should have point load bearing capacity of 100 kgs or better | Detector should have point load bearing capacity of 100 kgs or better |
| 33 | Detector and Acquisition software should be from the same manufacturer for better image quality and patient care. | Detector and Acquisition software should be from the same manufacturer for better image quality and patient care. |
| 34 | The digital workstation should be based on the latest high-speed processors of at least 32 bit. | The digital workstation should be based on the latest high-speed processors of at least 32 bit. |
| 35 | It should have the possibility of acquiring the image from the detector system with auto protocol select. | It should have the possibility of acquiring the image from the detector system with auto protocol select. |
| 36 | It should have image storage disk of 500 Gigabyte or more | It should have image storage disk of 500 Gigabyte or more |
| 37 | The system should have ready DICOM interface and networking capability with RIS/HIS/PACS. | The system should have ready DICOM interface and networking capability with RIS/HIS/PACS. |
| 38 | Please specify the post processing functions available. | Please specify the post processing functions available. |
| 39 | The Console system should have advance AI features such as identifying Lung nodules, pneumo thorax ,Pleural effusuion etc. automatically. | The Console system should have advance AI features such as identifying Lung nodules, pneumo thorax ,Pleural effusuion etc. automatically. |
| 40 | Workstation must be provided for image processing, image display, post processing functions and net working with colour monitor LCD type size 18” with matrix 1024x1024 | Workstation must be provided for image processing, image display, post processing functions and net working with colour monitor LCD type size 18” with matrix 1024x1024 |
| 41 | A CD/DVD – R/W based long term archiving must be offered | A CD/DVD – R/W based long term archiving must be offered |
| 42 | Additional Workstation: Should be supplied with all above features of image acquisition system with true medical grade 21 inch of bigger size monitor of 2MP and minimum 1000cd. | Additional Workstation: Should be supplied with all above features of image acquisition system with true medical grade 21 inch of bigger size monitor of 2MP and minimum 1000cd. |
| 43 | Computer for EMR and RIS purpose. (Qty. 1) | Computer for EMR and RIS purpose. (Qty. 1) |
| 44 | Online UPS with 30 minutes back up for computer system and image viewing workstation | Online UPS with 30 minutes back up for computer system and image viewing workstation |
| 45 | 50 KVA or more Servo Stabilizer for the whole system. | 50 KVA or more Servo Stabilizer for the whole system. |
| 46 | Quoting Vendor to visit the site of installation and access size of DR room. | Quoting Vendor to visit the site of installation and access size of DR room. |
| 47 | Aprons : | Aprons : |
| 48 | Should perform preventive maintenance (2nos) during warranty & if entered into AMC(includes unlimited breakdown calls) /CMC (which will include spare replacement, breakdown calls). Vendor to submit SOPs for PMS at the time of installation/ commissioning. This is mandatory requirement. | Should perform preventive maintenance (2nos) during warranty & if entered into AMC(includes unlimited breakdown calls) /CMC (which will include spare replacement, breakdown calls). Vendor to submit SOPs for PMS at the time of installation/ commissioning. This is mandatory requirement. |
| 49 | Performance certificates of IQ,OQ,PQ tests to be submitted at the time of installation/commissioning. | Performance certificates of IQ,OQ,PQ tests to be submitted at the time of installation/commissioning. |
| 50 | Vendor to submit the technical data sheet, brochure etc as a tender document with reference to the quoted make & model. Please mention the reference page no., etc in these documents against each technical specifications in the compliance. | Vendor to submit the technical data sheet, brochure etc as a tender document with reference to the quoted make & model. Please mention the reference page no., etc in these documents against each technical specifications in the compliance. |
| 51 | Vendor to submit list of consumables/consumable Spares and spare parts ( i.e.spares need to be replaced at regular intervals, maybe quarterly/half yearly/yearly etc.) if any. Costing to be submittted in the financial bid | Vendor to submit list of consumables/consumable Spares and spare parts ( i.e.spares need to be replaced at regular intervals, maybe quarterly/half yearly/yearly etc.) if any. Costing to be submittted in the financial bid |
| 52 | Please submit pre installation requirements [electrical, HVAC, Compressed air along with air pressure mentioned), water requirement (RO/DI/Distilled water with its pressure, flow rate per hour) ; if any of the above is essential] | Please submit pre installation requirements [electrical, HVAC, Compressed air along with air pressure mentioned), water requirement (RO/DI/Distilled water with its pressure, flow rate per hour) ; if any of the above is essential] |
| 53 | Vendor to provide UPS with adequate capacity, if required for the quoted equipment. If not required, vendor to mention the same. | Vendor to provide UPS with adequate capacity, if required for the quoted equipment. If not required, vendor to mention the same. |
| 54 | Vendor to submit details of footprint size & weight of the quoted model. | Vendor to submit details of footprint size & weight of the quoted model. |
| 55 | Vendor to submit power consumption. | Vendor to submit power consumption. |
| 56 | Demo of the quoted model , will be required if so desired by the user, after the opening of the technical bid and prior to opening of financial bid. This is for technical evaluation. All technical specifications mentioned above to be mandatorily shown in the demo unit. | Demo of the quoted model , will be required if so desired by the user, after the opening of the technical bid and prior to opening of financial bid. This is for technical evaluation. All technical specifications mentioned above to be mandatorily shown in the demo unit. |
| 57 | User's/Installation list: A list of installations of the quoted model with the address and contact numbers to be provided. | User's/Installation list: A list of installations of the quoted model with the address and contact numbers to be provided. |
| 58 | Predispatch inspection at factory will be required if desired by authorities. | Predispatch inspection at factory will be required if desired by authorities. |
| 59 | Should be CE/US FDA/BIS/ICMED approved. | Should be CE/US FDA/BIS/ICMED approved. |
| 60 | Vendor should provide the User manual and service manual copy during the installation of the equipment. | Vendor should provide the User manual and service manual copy during the installation of the equipment. |
| 61 | Unpacking and shifting the consignment to the installation site is to be included in the vendor's scope of supply. Bidder/manufacturer/authorized service provider should take responsibility to lift /shift the consignment from unloading site to the installation site. Unloading site shall be Stores department, TMH. If needed ,bidder has to arrange for the labours at no charge to TMH. Before submitting the quotation,bidders may visit TMH to know unloading and installation site. | Unpacking and shifting the consignment to the installation site is to be included in the vendor's scope of supply. Bidder/manufacturer/authorized service provider should take responsibility to lift /shift the consignment from unloading site to the installation site. Unloading site shall be Stores department, TMH. If needed ,bidder has to arrange for the labours at no charge to TMH. Before submitting the quotation,bidders may visit TMH to know unloading and installation site. |
| 62 | Complete decommissioning & dismantling of existing machine with clearing the debris/scrap from the respective site will be sole responsibility of the vendor if buyback. | Complete decommissioning & dismantling of existing machine with clearing the debris/scrap from the respective site will be sole responsibility of the vendor if buyback. |
| 63 | Training: | Training: |
| 64 | Local Service Support: Should have local office and service support/service engineer for attending the breakdown calls. Details to be submitted. | Local Service Support: Should have local office and service support/service engineer for attending the breakdown calls. Details to be submitted. |
| 65 | Response Time: Should not be more than 06 hrs from lodging a breakdown complaint on toll free or by email. | Response Time: Should not be more than 06 hrs from lodging a breakdown complaint on toll free or by email. |
| 66 | Warranty- 2 years | Warranty- 2 years |
| 67 | CMC- cost per annum will be considered for all bidders for 8 years after warranty (Should include QA QC annually as per AERB noms.) | CMC- cost per annum will be considered for all bidders for 8 years after warranty (Should include QA QC annually as per AERB noms.) |
| 68 | Back to back assurance to be taken by the supplier from OEM to supply spares for minimum 10 years and to be submitted. | Back to back assurance to be taken by the supplier from OEM to supply spares for minimum 10 years and to be submitted. |
| 69 | Penalty Clause: | Penalty Clause: |