| 1 | De–Launching |
| 2 | 20 nos. belder are required 20 days for launching of Pantoon Bridge in proper position and alignment. (30 x 20) |
| 3 | 4 no. Chowkidar (2 no's Day/Night)for 183 days (30+31+30+31+31+30) (01-04-2022 to 30-09-2022) |
| 4 | 2 nos carpenter are required for 10 days for de-launching of pantoon bridge in proper position and alignment. |
| 5 | 2 no. Tractor on hire for carriage of sleepers roadways , planks, wheel, guard pieces, R.S joists, pins, wire rope etc for 7 days. |
| 6 | 1 no. J.C,B on Hire for leveling material and carriage of material at pantoon bridge site 56 hours |
| 7 | 1 no. Hydra (8 ton ) on hire charges for fixing of pontoon bridge for 9 days |
| 8 | Launching |
| 9 | 20 nos. belder are required 15 days for launching of Pantoon Bridge in proper position and alignment. 30 x 20 |
| 10 | 2 nos carpenter are required for 5 days for launching of pantoon bridge in proper position and alignment as per (CSR 1.22) |
| 11 | 2 no. Tractor on hire for carriage of sleepers roadways , planks, wheel, guard pieces, R.S joists, pins, wire rope etc from Baupur Jadid to Sultanpur store to Bridge side for 5 days. |
| 12 | 1 no. J.C,B on Hire for leveling material and carriage of material at pantoon bridge site 56 hours |
| 13 | 1 no. Hydra (8 ton ) on hire charges for fixing of pontoon bridge for 9 days |
| 14 | Yearly Maintenance |
| 15 | Filling cement bags with sand sewing and laying in position within30 ms in water including cost of E.C. bag & strings. (CSR 23.27) |
| 16 | Sal wood wrought, panelled and fixed in position for decking (CSR 17.6) |
| 17 | G-I wire 8 Nos (SWG) for tightening and anchoring RCC block at river bridge and for binding the pontoon (Railing / Wheel Kerbs) |
| 18 | Collection of 1-1/2” dia Nariyal Rope on both sides of the Bridge |
| 19 | Supply of Iron Gullas and key L/S |
| 20 | Supply of Nuts and Bolts |
| 21 | Supply of washers size 3” x 5” complete in all respects |
| 22 | 4 no. Chowkidar for 182 days (31+30+31+31+28+31) (01-04-2026 to 30-09-2027) |
| 23 | Road safety furniture |
| 24 | Reflective tape (Red Black Yellow = 110mtr each |
| 25 | Repair & Painting to the vertical steel railing L / S |
| 26 | Credit of Wooden Sleeper removed from bridge being damaged |
| 27 | CSR 16.18-Painting two or more coats with synthetic enamel paints in all shades on old wood work or metallic or plastered or concrete surface to give an even shade including rubbing down old paint. Pantoon 2 x (44.43 + 6.17) 478.29 Sft + 66.46 Sft) |
| 28 | Add 1% Culture Cess Please Enable Macros to View BoQ information |