Tender For Estimate For Relining/Lining Of Water Course Of Outlet Rd 39580/R Of Teona Disty.
Tender Overview
Project Description
Tender for Estimate For Relining/Lining Of Water Course Of Outlet Rd 39580/R Of Teona Disty.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Jun-2026 | corrigendum2 | Date | 02-Jul-2026 |
| 2 | 16-Jun-2026 | corrigendum1 | Date | 23-Jun-2026 |
| 3 | 02-Jul-2026 | corrigendum3 | Date | 09-Jul-2026 |
| 4 | 16-Jun-2026 | corrigendum1 | Date | 23-Jun-2026 |
| 5 | 09-Jul-2026 | Corrigendum4 | Date | 20-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. |
| 2 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. |
| 3 | Dressing of earth work (i) New work or remodeling work. |
| 4 | (6.18 (a)) Dag belling single kassi stroke minimum 7.5 cm depth. |
| 5 | LINING Dressing bed and preparation of sub grade for lining. |
| 6 | Dismantling brick work tile, masonry or tile lining:- (b) In cement |
| 7 | BRICK WORK First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth |
| 8 | PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls |
| 9 | PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors & Top |
| 10 | CONCRETE Supplying & laying dry brick bats |
| 11 | Cement concrete 1:2:4 (a) With stone ballast or shingle (i) mixing by manual means |
| 12 | CENTRING AND SHUTTERING for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) |
| 13 | STEEL AND IRON WORK Cold twisted deformed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete |
| 14 | Fixing of RCC frame in Nakka |
| 15 | Re-handling of Earthwork Recently Executed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender