| 1 | fo|qr forj.k [k.M eksnhuxj ds vUrxZr 11@-04 ds0oh0 midsUnzksa dh {kerko`f}@fuek.kZ dk;ZA |
| 2 | SAFE CARRIAGE OF S.T./PCC POLE FROM STORE CENTER TO SITE STORE WITH LOADING & UNLOADING AT BOTH ENDS RESPECTIVELY DISTANCE WITHIN- 0 TO 50 KMS. |
| 3 | PCC POLES 11 MTR. LONG |
| 4 | PCC POLES 8.5 MTR. LONG |
| 5 | LOADING, SAFE CARRIAGE & UNLOADING OF HEAVY STOCK MATERIAL V TYPE, DISC INSULATOR, PIN INSULATOR ETC. FROM STORE CENTER TO SITE STORE WITH PROPER STACKING OF MATERIAL, DISTANCE WITHIN-50 KMS. |
| 6 | LOADING, SAFE CARRIAGE & UNLOADING OF LT/HT CABLE, VCB & CONTROL PANAL TF ETC FROM STORE CENTER TO SITE STORE WITH PROPER STACKING OF MATERIAL, DISTANCE WITHIN-50KMS. |
| 7 | 11 KV XLPE CABLE OF 3X70 SQ.MM. |
| 8 | ACSR WISEL CONDUCTOR |
| 9 | LT ABC 3*95 SQ. MM. |
| 10 | LT ABC 3*120 SQ. MM. |
| 11 | LT LEAD 1*240 SQ. MM. |
| 12 | LT XLPE 1*400 SQ. MM. |
| 13 | LT XLPE 1*240 SQ. MM. |
| 14 | LT XLPE 1*120 SQ. MM. |
| 15 | 25 KVA TRANSFORMER |
| 16 | 100 KVA TRANSFORMER |
| 17 | 250 KVA TRANSFORMER |
| 18 | 630 KVA TRANSFORMER |
| 19 | ERECTION OF SINGLE POLE ST/PCC POLE 11/ 33 KV FITTINGS , TOP CHANNAL, DROPPER CHANNAL, X BRACING SET, DISC INSULATOR, PIN INSULATOR, GUARDING ANGLE F BRACKET AND ETC AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK AS PER RESSPO MANUALS |
| 20 | PCC POLES 11 MTR. LONG |
| 21 | PCC POLES 8.5 MTR. LONG |
| 22 | ERECTION OF DOUBLE POLE / SACTION POLE OF 11/33 KV FITTINGS AS PER RESPO DRAWING TOP CHANNAL, DROPPER CHANNAL, X BRACING SET, DISC INSULATOR, PIN INSULATOR, GUARDING ANGLE F BRACKET AND ETC AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK AS PER RESSPO MANUALS |
| 23 | PCC POLES 11 MTR. LONG |
| 24 | PCC POLES 8.5 MTR. LONG |
| 25 | EXCAVATION OF FOR EACH AND GROUTING OF SINGLE POLE AS PER RESPO DRAWING AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE PAD ETC. AS PER ACTUAL SITE REQUIREMENT AS PER RESSPO MANUALS |
| 26 | PCC POLES 11 MTR. LONG |
| 27 | PCC POLES 8.5 MTR. LONG |
| 28 | EXCAVATION OF FOR EACH AND GROUTING OF DOUBLE POLE/SACTION POLE AS PER RESPO DRAWING AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE PAD ETC. AS PER ACTUAL SITE REQUIREMENT |
| 29 | PCC POLES 11 MTR. LONG |
| 30 | PCC POLES 8.5 MTR. LONG |
| 31 | LOADING, SAFE CARRIAGE & UNLOADING OF HEAVY STOCK MATERIAL V TYPE, DISC INSULATOR, PIN INSULATOR ETC. FROM STORE CENTER TO SITE STORE WITH PROPER STACKING OF MATERIAL FROM JE STORE TO PIT SITE. |
| 32 | LOADING, SAFE CARRIAGE & UNLOADING OF LT/HT CABLE, VCB & CONTROL PANAL TF ETC FROM JE STORE TO PIT SITE. |
| 33 | 11 KV XLPE CABLE OF 3X70 SQ.MM. |
| 34 | ACSR WISEL CONDUCTOR |
| 35 | LT ABC 3*95 SQ. MM. |
| 36 | LT ABC 3*120 SQ. MM. |
| 37 | LT LEAD 1*240 SQ. MM. |
| 38 | LT XLPE 1*400 SQ. MM. |
| 39 | LT XLPE 1*240 SQ. MM. |
| 40 | LT XLPE 1*120 SQ. MM. |
| 41 | 25 KVA TRANSFORMER |
| 42 | 100 KVA TRANSFORMER |
| 43 | 250 KVA TRANSFORMER |
| 44 | 630 KVA TRANSFORMER |
| 45 | FIXING OF 11 KV STAY SET INCLUDING NOZELLING ETC. AS PER RESPO MANUAL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL, LABOUR, T&P ETC REQUIRED FOR PROPER COMPLETION OF WORK AS PER RESSPO MANUALS. |
| 46 | GROUTING OF 11 KV STAY SET INCLUDING NOZELLING ETC. AS PER RESPO MANUAL AND ALSO INCLUDING THE COST OF ALL THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE ETC. AS PER ACTUAL SITE REQUIREMENT , LABOUR, T&P ETC REQUIRED FOR PROPER COMPLETION OF WORK AS PER RESSPO MANUALS. |
| 47 | FIXING OF EARTHING ROD AND WIRE AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER INCLUDING THE COST OF LABOUR, T&P ETC. REQUIRED FOR PROPER COMPLETION OF WORK AS PER RESSPO MANUALS. |
| 48 | G.I.WIRE 8/10 SWG |
| 49 | FIXING 11 KV CROSS ARM. |
| 50 | 11 KV DISC INSULATOR. |
| 51 | 11 KV PIN INSULATOR. |
| 52 | CUTTING /DRILLING /WELDING OF MS ANGLE IRON FOR MAKING GUARDING ANGLE SIZE 65X65X6/50X50X6 MM INCLUDING THE WORK OF FIXING THE BRACKET ON PCC/ST POLE FOR CONSTRUCTION OF THE LINE. |
| 53 | FABRICATION OF T-OFF CHANNEL |
| 54 | LAYING OF 11 KV XLPE CABLE 3*70/3*120/3*185 SQUARE MM & OUTER SIZE NEWLY ERECTED POLE AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDES THE COST OF LABOUR, T&P, CARRIER ETC. REQURIED FOR PROPER COMPLETION OF WORK AS PER RESSPO MANUALS. |
| 55 | LAYING OF 11 KV XLPE CABLE 3*185 SQUARE MM & OUTER SIZE NEWLY ERECTED POLE AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDES THE COST OF LABOUR, T&P, CARRIER ETC. REQURIED FOR PROPER COMPLETION OF WORK. |
| 56 | LAYING SAGGING STRINGING AND BINDING AND JUMPERING ETC OF FOLLOWING ACSR CONDUCTOR/WISEL/RABIT/ABC ALL SIZE ON THE NEWLY ERECTED POLES AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDES THE COST OF LABOUR, T&P, CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK AS PER RESSPO MANUALS |
| 57 | ACSR WISEL CONDUCTOR |
| 58 | LT ABC 3*95 SQ. MM. |
| 59 | LT ABC 3*120 SQ. MM. |
| 60 | LT LEAD 1*240 SQ. MM. |
| 61 | LT XLPE 1*400 SQ. MM. |
| 62 | LT XLPE 1*240 SQ. MM. |
| 63 | LT XLPE 1*120 SQ. MM. |
| 64 | DISTRIBUTION BOX 3 PHASE COMPLET |
| 65 | CONSTRUCTION OF PLINTH FOR DISTRIBUTION TRANSFORMER |
| 66 | WIREMESH FENCING WORK WITH MATERIAL FOR SAFETY OF DISTRIBUTION TRANSFORMER |
| 67 | FIXING OF CHEMICLE EARTHING ELECTROD ROD. |
| 68 | MAKING JUMPERS ON SECTION POINTS, BY FIXING OF PROPER SIZES, SUITABLE FOR ACSR CONDUCTOR. SECTIONAL DOUBLE/FOUR POLE. |
| 69 | MOUNTING & INSTALLATION OF TRANSFORMER FROM D/P |
| 70 | 25 KVA TRANSFORMER |
| 71 | 100 KVA TRANSFORMER |
| 72 | 250 KVA TRANSFORMER |
| 73 | 630 KVA TRANSFORMER |
| 74 | PLINTH OF POLE/KIKING OF POLE UP NUTUREL GROUND LEVEL WITH MATERIAL SAND, BRICK ETC. PROVIDE BY THE CONTRACTOR REQURIED FOR PROPER COMPLETION OF WORK. |
| 75 | MAKING/FILLING OF 11 KV CABLE JOINTING KIT 3*70 SQ MM. XLPE CABLE. |
| 76 | FIXING OF 11 KV FUSE SET |
| 77 | FIXING OF 11 KV DO FUSE SET |
| 78 | THE FOLLWING MATERIAL WILL BE FIXED BY THE CONTRACTOR. |
| 79 | CHEMICLE EARTHING ELECTROD ROD. |
| 80 | ALUMINIUM BINDING WIRE |
| 81 | PG CLAMP FOR DOG |
| 82 | COPPER L-PIECE(50*225*10) MM. |
| 83 | COPPER L-PIECE(25*225*10) MM. |
| 84 | MS CHANNEL |
| 85 | ANGLE |
| 86 | LT LUG. 16 SQ MM. |
| 87 | LT LUG. 120 |
| 88 | LT LUG. 240 |
| 89 | LT LUG. 400 |
| 90 | DEAD END CLAMP. |
| 91 | SUSPENSION CLAMP |
| 92 | J HOOK |
| 93 | F/SIDE BRACKET |
| 94 | GI PIPE 6\\" DIA |
| 95 | CLAMP FOR 11 KV LINE |
| 96 | F CLAMP FOR 11 KV LINE |
| 97 | THE FOLLWING MATERIAL WILL BE PROVIDED BY THE CONTRACTOR. |
| 98 | CHEMICLE EARTHING ELECTROD ROD. |
| 99 | ALUMINIUM BINDING WIRE |
| 100 | PG CLAMP FOR DOG |
| 101 | COPPER L-PIECE(50*225*10) MM. |
| 102 | COPPER L-PIECE(25*225*10) MM. |
| 103 | MS CHANNEL |
| 104 | ANGLE |
| 105 | LT LUG. 16 SQ MM. |
| 106 | LT LUG. 120 |
| 107 | LT LUG. 240 |
| 108 | LT LUG. 400 |
| 109 | DEAD END CLAMP. |
| 110 | SUSPENSION CLAMP |
| 111 | J HOOK |
| 112 | F/SIDE BRACKET |
| 113 | GI PIPE 6\\" DIA |
| 114 | CLAMP FOR 11 KV LINE |
| 115 | F CLAMP FOR 11 KV LINE |
| 116 | CARTAGE & REMOVAL OF OLD & USED RECEIVED BACK MATERIAL FROM SITE TO STORE CENTRE/ J.E. STORE. |
| 117 | ABC SCRAP |
| 118 | MS SCRAP |
| 119 | 1000 KVA TRANSFORMER |
| 120 | 750 KVA TRANSFORMER |
| 121 | 630 KVA TRANSFORMER |
| 122 | 160 KVA TRANSFORMER |
| 123 | 100 KVA TRANSFORMER |
| 124 | 63 KVA TRANSFORMER |
| 125 | 25 KVA TRANSFORMER Please Enable Macros to View BoQ information |